Immediate settlement occurs under undrained loading conditions in saturated cohesive soils, or drained loading in granular soils. It develops essentially instantaneously upon load application.
Si = q · B · (1 − μ²) / Es · Iw
Where:
| Soil Type (USCS) | E_s (psf) | Typical Source |
|---|---|---|
| Very soft clay (CH) | 10,000–25,000 | Unconfined compression |
| Soft clay (CL) | 25,000–75,000 | Unconfined compression |
| Medium stiff clay | 75,000–150,000 | CPTu, PMT |
| Stiff clay | 150,000–300,000 | CPTu, PMT |
| Very stiff clay | 300,000–500,000 | PMT, pressuremeter |
| Loose sand (SP/SM) | 100,000–250,000 | SPT correlation |
| Medium-dense sand | 250,000–500,000 | SPT correlation |
| Dense sand/gravel | 500,000–1,500,000 | SPT correlation |
Immediate settlement is critical for intermodal yard slab design and for any structure where the total settlement is dominated by granular or stiff-clay subgrades. For most railroad embankment designs over soft cohesive soils, primary consolidation governs and S_i is secondary.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| q | net contact pressure (psf) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| B | footing width (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| μ | Poisson's ratio (0.5 for undrained clay | Assumed (published values) | Rarely measured; choose from published ranges. Use 0.5 for undrained clay. | 0.25–0.40; 0.5 undrained · by USCS group |
| Es | elastic modulus of soil (psf) | Field test, lab test or correlation | Pressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc. | loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group |
| Iw | influence factor for shape and embedment (Bowles, 1996; I_w | Another equation | Computed: I_w = 0.82 for square, 1.12 for L/B = 2, 1.52 for L/B = 5; rigid-footing values, flexible-center values are higher, e.g., 1.12 for a square) | ≈ 0.82 for square, 1.12 for L/B = 2, 1.52 for L/B = 5 |
Eq. 6.2-4 assumes a single modulus for the whole stressed zone. For footings, signal foundations and yard slabs on sand, USACE EM 1110-1-1904 recommends Schmertmann’s approximation, which sums strain over sublayers of thickness Δz = 0.2B using a triangular strain-influence diagram (Figure 12-S1):

ρi = C1 · Ct · Δp · Σ (Izi / Esi) Δzi
Because the method weights the stiffness of each sublayer, it captures a loose sand seam at depth B/2 that a single-modulus calculation averages away.
Source: U.S. Army Corps of Engineers (1990). Settlement Analysis. EM 1110-1-1904
Case study: 6.2.16.1 Unit weight of fill: design assumes 127 pcf, the job measures more (Look 2023), in §12.16 Case Studies.
Signal, catenary and communication foundations, culvert footings and small bridge spread footings on sand or stiff clay settle mostly at once, as the soil compresses elastically when the load goes on. Das's Principles of Geotechnical Engineering (Section 11.2) gives the standard method. Steinbrenner's shape factors F1 and F2 account for the foundation's proportions and the depth to a rigid layer. Fox's depth factor accounts for embedment. A weighted average modulus over the depth of influence, min(H, 5B) after Bowles, handles layered soil. The result is for the center or corner of a flexible foundation, and a rigid foundation settles about 0.93 times the flexible center value. Das gives representative moduli, and CPT correlations (Es ≈ 2qc to 3qc in sand) connect the method to the soundings in Chapter 5.1.
Equation 6.1-22. Elastic settlement (Das Eqs. 11.1 to 11.10)
Center: α = 4, B′ = B/2, m′ = L/B, n′ = H/(B/2); corner: α = 1, B′ = B, n′ = H/B
Es = ΣEs(i)Δz / z̄, z̄ = min(H, 5B); Se(rigid) ≈ 0.93Se(flexible, center)
| Quantity | Das | Calculator |
|---|---|---|
| Weighted modulus Es | 10,400 kPa (1,508 psi) | 1,508 psi |
| F1, F2 (from tables) | 0.641, 0.031 | 0.641, 0.031 (closed form) |
| If | 0.71 | 0.71 |
| Is | 0.716 | 0.658 |
| Settlement, flexible center | 13.3 mm | 12.3 mm |
| Settlement, rigid | 12.4 mm | 11.4 mm |
The calculator matches F1, F2, If and Es. Das's example arrives at Is = 0.716 by using (2 − μ)/(1 − μ) in place of the (1 − 2μ)/(1 − μ) of Equation 11.2. With the equation as printed, Is = 0.658 and the settlement is about 8% smaller; with 0.716 the calculator also gives 13.3 mm.
Das's footing, 3.3 by 6.6 ft at 3.3 ft depth with rock 16.4 ft down, carrying 3,133 psf net over layers with moduli of 1,450, 1,160 and 1,740 psi, settles 0.48 in. at the center if flexible and 0.45 in. if rigid. The corner of a flexible footing settles 0.21 in. Most of the uncertainty is in the modulus. A factor of two in Es, well within the ranges in Das's Table 11.4, doubles the settlement. Poisson's ratio matters much less, as the calculator's chart shows.
Open the elastic settlement calculator →
Steinbrenner shape factors in closed form, the Fox depth factor, a weighted modulus over min(H, 5B), and flexible center, flexible corner and rigid settlements, with the effect of Poisson's ratio.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.
Plate to footing. A plate load test stresses the ground to a depth of only about twice the plate width, so its settlement has to be scaled up to the foundation. The usual relation for a square footing on sand (Terzaghi and Peck 1967) is:
ρB = ρ1 [2B / (1 + B)]2
where ρ1 = settlement of a 1-ft square plate, ρB = settlement of a footing of side B, and B is in feet. The ratio can never exceed 4, however large the footing. A more general relation (Ménard and Rousseau 1962) is:
ρ2 / ρ1 = (B2 / B1)α
where ρ1 and B1 are the plate settlement and width and ρ2 and B2 those of the footing. Typical α: sands and gravels 1/3 to 1/2; saturated silts 1/2; clays and dry silts 1/2 to 2/3; compacted fill 1. For example, a 1-ft plate that settles 0.25 in. under the design pressure predicts 0.25 × (12/7)2 = 0.73 in. for a 6-ft square signal-bridge footing by Terzaghi and Peck, or 0.25 × 60.4 = 0.51 in. by Ménard with α = 0.4. The spread between the two is typical. Neither relation detects a soft layer below the plate’s zone of influence, so confirm the profile with a boring to at least twice the footing width.
Do not correct N for settlement charts. The SPT-based settlement methods (Terzaghi and Peck, Meyerhof, Bowles’s adjustments and Burland and Burbidge) were all fitted to blow counts that were not corrected for overburden pressure. Applying CN to them raises the allowable bearing pressure or lowers the predicted settlement without any basis. Use the field N, corrected only for energy where the method calls for N60, and keep the overburden-corrected (N1)60 for relative density and liquefaction.
Source: Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed., §5.4.1.4 and §5.4.2, Eqs. 5.36–5.38. Summarized and paraphrased; worked figures added. Full reference under Supplemental References.