6.2.4 Primary Consolidation Settlement

Settlement analysis is the serviceability companion to the bearing capacity calculations developed in Chapter 6.1.
Authors: Daniel P. Colwell and Mario Ruel
6.2.4 Primary Consolidation Settlement
6.2.4.1 Settlement Equations

Primary consolidation settlement S_c is governed by the compressibility of the clay skeleton as excess pore pressures dissipate. Three cases apply depending on the preconsolidation stress σ'_p:

Settlement Calculation
Settlement Calculation
Equation 6.2-5 — Normally Consolidated Clay (σ'_v0 = σ'_p):

Sc = [Cc / (1 + e₀)] · H · log[(σ'_v0 + Δσ) / σ'_v0]

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Cccompression indexLab testSlope of the virgin e–log σ' curve from a consolidation test (ASTM D2435). Screening: Cc ≈ 0.009(LL − 10).CL 0.10–0.40, CH 0.35–0.90 · by USCS group
e0void ratioAnother equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Equation 6.2-6 — Overconsolidated Clay, Stress Remains Below σ'_p:

Sc = [Cs / (1 + e₀)] · H · log[(σ'_v0 + Δσ) / σ'_v0]

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
e0void ratioAnother equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Equation 6.2-7 — Overconsolidated Clay, Stress Exceeds σ'_p:

Sc = [Cs / (1 + e₀)] · H · log[σ'_p / σ'_v0]

+ [Cc / (1 + e₀)] · H · log[(σ'_v0 + Δσ) / σ'_p]

Where:

  • C_c = compression index (dimensionless)
  • C_s = swell/recompression index ≈ C_c/5 to C_c/10 (dimensionless)
  • e₀ = initial void ratio (dimensionless)
  • H = layer thickness (ft)
  • σ'_v0 = initial effective vertical stress at midpoint of layer (psf)
  • σ'_p = preconsolidation stress (psf); OCR = σ'_p / σ'_v0
  • Δσ = stress increase at midpoint of layer from applied load (psf)
Inputs: where each value comes from (8)
SymbolWhat it isComes fromHow to get itTypical range
Cccompression index (dimensionless)Lab testSlope of the virgin e–log σ' curve from a consolidation test (ASTM D2435). Screening: Cc ≈ 0.009(LL − 10).CL 0.10–0.40, CH 0.35–0.90 · by USCS group
Csswell/recompression index ≈ C_c/5 to C_c/10 (dimensionless)Lab testUnload–reload slope of the e–log σ' curve (ASTM D2435). Screening: Cr ≈ Cc/5 to Cc/10.0.01–0.08 (inorganic clays) · by USCS group
e₀initial void ratio (dimensionless)Another equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
Hlayer thickness (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
σ'v0initial effective vertical stress at midpoint of layer (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
σ'ppreconsolidation stress (psf)Lab test (or correlation)Preconsolidation stress from the consolidation curve (Casagrande or work method, ASTM D2435). CPT screening: σ'p ≈ 0.33(qt − σv). OCR = σ'p/σ'v0.OCR 1 (NC) to > 4 (heavily OC) · by USCS group
OCRpreconsolidation stress / OCR = σ'_p / σ'_v0Lab test (or correlation)Preconsolidation stress from the consolidation curve (Casagrande or work method, ASTM D2435). CPT screening: σ'p ≈ 0.33(qt − σv). OCR = σ'p/σ'v0.OCR 1 (NC) to > 4 (heavily OC) · by USCS group
Δσstress increase at midpoint of layer from applied load (psf)Another equationStress increase from the applied load: Boussinesq influence factor or 2:1 distribution (settlement chapter), or the track load-spread equations.project-specific
Equation 6.2-8 — Empirical C_c Estimate (Terzaghi and Peck 1967, after Skempton 1944):

Cc = 0.009 · (LL − 10)

Where LL = liquid limit (%). Valid for normally consolidated clays; use with caution for organic soils. For railroad projects, laboratory consolidation tests (ASTM D2435) should support any embankment over about 6 ft high on soft clay.

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
Cccompression index = 0.009 · (LL − 10)Lab testSlope of the virgin e–log σ' curve from a consolidation test (ASTM D2435). Screening: Cc ≈ 0.009(LL − 10).CL 0.10–0.40, CH 0.35–0.90 · by USCS group
LLliquid limit (%)Lab testAtterberg limits (ASTM D4318) on the minus No. 40 fraction.CL 20–50, CH 50–110 · by USCS group
Equation 6.2-9 — Void Ratio from Unit Weight:

e₀ = (Gs · γ_w / γ_d) − 1

Where G_s = specific gravity (≈ 2.70 for most clays), γ_d = dry unit weight (pcf), γ_w = 62.4 pcf.

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
e₀void ratio = (Gs · γ_w / γ_d) − 1Another equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
Gsspecific gravity (≈ 2.70 for most clays), γ_d = dry unit weight (pcf), γ_w = 62.4 pcf.Lab testSpecific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested.2.64–2.80 mineral; lower if organic · by USCS group
γddry unit weightLab or field testLab: ASTM D7263 on tube samples. Field: nuclear gauge (ASTM D6938), sand cone (D1556) or drive cylinder (D2937). Or γd = γ/(1 + w).sands 90–125, clays 80–115 pcf · by USCS group
6.2.4.2 Sublayer Method

When a compressible layer is thick (> 5 ft) or when the stress increase varies significantly with depth, the layer should be divided into sublayers of 2–4 ft thickness. Settlement is computed for each sublayer at its midpoint stress state, then summed:

Equation 6.2-10 — Sublayer Summation:

Sc,total = Σ [Cc,i / (1 + e₀,i)] · Hi · log[(σ'_v0,i + Δσ_i) / σ'_v0,i]

Use this sublayer approach for clay layers thicker than about 10 ft, where ignoring stress variation underestimates settlement at the top of the layer and overestimates at depth.

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Cccompression indexLab testSlope of the virgin e–log σ' curve from a consolidation test (ASTM D2435). Screening: Cc ≈ 0.009(LL − 10).CL 0.10–0.40, CH 0.35–0.90 · by USCS group
e0void ratioAnother equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Settlement on organic ground: field cases

Organic soils can compress by up to about 40% (12 ft of peat can mean 5 ft of settlement). Muskeg also punches under load, and buried corduroy decays. At one Canadian swamp crossing, years of swamp ties never stopped the settlement; only a proper berm, together with draining the water driving the movement, solved it. At a peat site in northern Alberta, 400 ft of differential settlement into deep peat needed piles. In 2016 dollars, swamp ties cost about $670,000 per mile, against about $280,000 per mile for undercutting and about $6.7 million per mile for new track (course figures of $600,000, $250,000 and $6,000,000 in 2012 dollars, escalated by the ENR Construction Cost Index; see Chapter 7.2, Table 7.2-6), so diagnosing the mechanism early is the cheapest option.

Figure 6.2-14. The Lac la Biche corridor through low-lying burned forest.
Figure 6.2-14. The Lac la Biche corridor through low-lying burned forest.
Figure 6.2-15. Bedford Mile 29.8 embankment instability.
Figure 6.2-15. Bedford Mile 29.8 embankment instability.

After Geotechnology for Railroaders Program, Module 2, Module 6.1, Module 6.2; Module 2 §08; Module 6.1 §03; Module 6.2 §01, §05. Full reference under Supplemental References.

6.2.4.3 Consolidation Settlement and Time Rate Calculator

The USACE manual Settlement Analysis (EM 1110-1-1904) gives the standard one-dimensional procedure: divide the compressible layer into sublayers, compute the initial effective stress and the stress increase in each, and sum the settlement using the recompression and virgin compression indices on either side of the preconsolidation pressure. Railroad fills are a near-ideal case for this method: a widening for a siding or a raise in grade is wide compared with the clay thickness, so the stress increase is nearly uniform with depth and lateral strain is small.

6.2.4.3.1 Method

Equation 6.2-20. Primary consolidation settlement of a sublayer

S = Cr H/(1 + e0) log(σ'p/σ'v0) + Cc H/(1 + e0) log[(σ'v0 + Δσ)/σ'p]

using only the first term when σ'v0 + Δσ ≤ σ'p.

Equation 6.2-21. Time rate (Terzaghi theory)

Tv = cv t / Hdr²; U ≤ 60%: Tv = (π/4)U²; U > 60%: Tv = 1.781 − 0.933 log(100 − U%)

t50 = 0.197 Hdr²/cv; t90 = 0.848 Hdr²/cv

Table 6.2-6. Estimates of the compression index (EM 1110-1-1904, Table 3-7)
SoilCc
Clays0.01(LL − 13); 0.012 wn; 1.15(e0 − 0.35)
Soils of sensitivity below 4 (Terzaghi and Peck relation)0.009(LL − 10)
Organic soils, peat0.0115 wn
Varved clays(1 + e0)[0.1 + 0.006(wn − 25)]
Uniform silts0.20
Uniform sand, loose / dense0.05 to 0.06 / 0.02 to 0.03

Use correlations for planning only; design values come from oedometer tests on undisturbed samples (Chapter 5.2).

6.2.4.3.2 Worked example: siding embankment over soft clay

Table 6.2-7. Ten-foot embankment widening over 18 ft of soft clay (calculator output)
InputValueResultValue
Fill load q (10 ft at 125 pcf)1,250 psfPrimary settlement Sc15.34 in.
Clay: top at 4 ft, thickness, water depth18 ft, 3 ftTime to 50% consolidation6.5 months
e0, Cc (LL = 58), Cr, OCR1.20, 0.45, 0.06, 1.2Time to 90% consolidation28.2 months
cv, drainage0.08 ft²/day, doubleSecondary compression, 25 years1.88 in.
Cα0.018Total17.22 in.

A foot of settlement taking several years to complete is typical of new fill on lake-plain and coastal clays. Under track it shows up as repeated surfacing and a dip at the transition to the old embankment. The options are covered in Chapter 7.2: surcharge with or without wick drains (which shorten Hdr, cutting t90 roughly with its square), lightweight fill, or staged construction with monitoring (Chapter 5.3).

Open the settlement calculator →
Sublayered consolidation settlement under a wide fill or a footing (2:1), time to 50% and 90% consolidation, secondary compression, and a settlement-time curve.

6.2.4.3.3 Sources in the library

These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.

  • Settlement Analysis, USACE EM 1110-1-1904 (1990), Settlement folder: procedure, compression index table, time factors and worked examples.Find source ↗Library entry
  • Consolidation and Settlement Analysis (P. J. Fox, handbook chapter), Soil Mechanics folder: immediate, consolidation and secondary components.Find source ↗
  • Rate of Consolidation — Terzaghi Theory (course notes).Find source ↗Library entry
  • Controlling Differential Settlement of Highway Soft Soil Subgrade (book), Settlement folder: treatment of transitions.Find source ↗
Supplemental reference · Carter & Bentley (2016), §5.1, §5.5

Compressibility From SPT and CPT, and the Field Correction to Oedometer Settlement

Track and embankment projects often have many SPT or CPT soundings and only a few consolidation tests. The correlations below spread the consolidation results along the alignment. Calibrate each one against the site’s own oedometer tests before using it for design.

mv from SPT N and PI (Stroud and Butler 1975). For overconsolidated clays, stiff insensitive clays and soft rocks, the coefficient of volume compressibility falls with blow count and plasticity. The published chart is fitted by:

1 / (mv N) = 1,170 / PI2.07 + 9.1  (ksf)

so that mv (ft²/kip) = 1 / [N × (1,170/PI2.07 + 9.1)]. In SI the fit is 56,000/PI2.07 + 435 kPa. It is widely used for normally consolidated soils as well, but it was derived for overconsolidated soils and is unlikely to hold for soft clays.

Table 6.2-11. Stroud and Butler factor 1/(mvN) vs. plasticity index (from the curve fit)
PI101520304060
1/(mvN), ksf19.013.411.510.19.79.3
1/(mvN), kPa912641549484462447

Settlement from mv: S = mv Δσ H. With mv in ft²/kip, Δσ in ksf and H in ft, S is in feet.

mv from cone resistance (Meigh 1987). For normally consolidated and lightly overconsolidated clays and silts up to firm consistency, with qc up to about 25 ksf (1.2 MPa):

mv = 1 / (α qc)

With qc in ksf, mv is in ft²/kip. The coefficient α depends on soil type and cone (Table 6.2-12).

Table 6.2-12. Coefficient α for mv = 1/(α qc) (after Meigh 1987, in Carter & Bentley 2016, Table 5.5)
Soil (USCS)α, electric (reference) coneα, mechanical mantle cone
High-plasticity clays and silts (CH, MH)2.5–7.52–6
Low and intermediate plasticity clays (CL), qc < 14.6 ksf3.7–103–8
Low and intermediate plasticity clays (CL), qc > 14.6 ksf2.5–6.32–5
Low and intermediate plasticity silts (ML)3.5–7.53–6
Organic silts (OL)2.5–102–8
Peat and organic clay (Pt, OH), w = 50–100%1.9–5.01.5–4.0
Peat and organic clay, w = 100–200%1.25–1.91.0–1.5
Peat and organic clay, w > 200%0.5–1.250.4–1.0

The British “intermediate plasticity” groups (CI, MI) fall within the USCS CL and ML groups. A lower α means a more compressible soil for the same cone resistance.

Field correction to oedometer settlement (Skempton and Bjerrum 1957). Oedometer settlements overestimate field settlement in overconsolidated clays, because the pore pressure set up under a real foundation is smaller than under one-dimensional loading. Very sensitive clays are the exception: there the oedometer can slightly underestimate. The consolidation settlement is corrected by a factor μ:

Sc,field = μ × Sc,oed

Table 6.2-13. Factor μ by clay type and ratio of layer thickness H to loaded width b (after Skempton 1954, in Carter & Bentley 2016, Fig. 5.5)
ClayH/b = 0.5H/b = 1H/b = 4
Very sensitive clays (soft alluvial, estuarine, marine)1.0–1.11.0–1.11.0–1.1
Normally consolidated clays0.8–1.00.7–1.00.7–1.0
Overconsolidated clays0.6–0.80.5–0.70.4–0.7
Heavily overconsolidated clays (glacial till, marl)0.5–0.60.4–0.50.2–0.4

For a compressible layer starting at depth z below a load of width B, take b ≈ B + z (load spread at 60°). μ applies to the consolidation settlement only, not to immediate or secondary settlement.

For railroad work: Under long embankments and track widenings, H/b is usually small, which gives the largest correction in overconsolidated clay. Use μ to explain why a stiff-clay foundation settled less than predicted, but do not use it to reduce settlement in soft, sensitive or normally consolidated clay, where μ is close to 1. Where the SPT or CPT correlations are used to extend a few oedometer tests along a line, plot the correlated mv against the oedometer values at the same depths. Adopt the correlation only if the two agree within about a factor of 1.5, and say in the report which settlements rest on a correlation (Example 6.2-8).

Source: Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed., §5.1.4–5.1.5 and §5.5.1, Eqs. 5.19, 5.20, 5.39, Table 5.5, Figs. 5.3–5.5. Summarized and paraphrased; equations converted to US units. Full reference under Supplemental References.

Example 6.2-8: Settlement of a Second-Main-Track Fill on Stiff Clay From SPT Data

A Class I railroad located in Iowa is adding a second main track on a new fill beside the existing embankment. The borings along the widening found 15 ft of stiff, overconsolidated lean-to-fat clay over dense sand. The SPT blow counts in the clay average N60 = 12, but no consolidation tests have been run yet. The engineer must estimate the settlement of the clay and how long it will take, to decide whether the new track can be surfaced at once or needs a waiting period.

existing new fill stiff OC clay, 15 ftN60 = 12, PI = 25, LL = 45 dense sand (drains) b = 40 ft H = 15 ft Δσ = 1.10 ksf S = ? GivenClay H = 15 ft, drained top and bottomN60 = 12; PI = 25; LL = 45Δσ = 1.10 ksf at mid-layerLoaded width b = 40 ftStress stays below σ′p (assumed) Requiredmv from SPT (Stroud)Oedometer and field settlementcv from LL; time to 90% Black = given; red = required
Given and required for Example 6.2-8.

Given

VariableValueDescription
H15 ftClay thickness; sand below and fill above, so drained top and bottom
N6012Average SPT blow count in the clay
PI, LL25, 45Plasticity index and liquid limit
Δσ1.10 ksfAverage stress increase at mid-layer under the new fill
b40 ftBase width of the new fill
Stress historyOverconsolidated; final stress assumed below σ′pStiff clay

Required

  • (a) mv from the SPT correlation
  • (b) Oedometer-basis consolidation settlement
  • (c) Field settlement with the Skempton–Bjerrum factor
  • (d) cv from the liquid limit and the time to 90% consolidation
  • (e) The effect if the fill pushes the clay past σ′p

Equations

  1. Eq. 1: 1/(mvN) = 1,170/PI2.07 + 9.1 — ksf; mv in ft²/kip
  2. Eq. 2: Sc,oed = mv Δσ H
  3. Eq. 3: Sc,field = μ Sc,oed — Table 6.2-13
  4. Eq. 4: cv ≈ 25,000/LL3.9 (recompression lower limit) or 80/LL2.8 (virgin) — cm²/s; × 33,950 for ft²/yr (Table 6.2-14)
  5. Eq. 5: t90 = 0.848 Hdr2/cv

Steps

Step 1 · (a) mv (Eq. 1)
252.07 = 782; 1,170/782 + 9.1 = 10.6 ksf; mv = 1/(12 × 10.6)
mv = 0.0079 ft²/kip
Spot check: SI form, 56,000/782 + 435 = 506 kPa; 1/(12 × 506) = 0.165 m²/MN = 0.0079 ft²/kip. Medium compressibility, as expected for stiff clay.
↓
Step 2 · (b) Oedometer settlement (Eq. 2)
0.0079 × 1.10 × 15 = 0.130 ft
Sc,oed = 1.6 in.
↓
Step 3 · (c) Field settlement (Eq. 3)
H/b = 15/40 = 0.38, use the H/b = 0.5 column; overconsolidated clay μ = 0.6 to 0.8, take 0.7
Sc,field = 0.7 × 1.6 = 1.1 in.
↓
Step 4 · (d) Time to 90% (Eqs. 4 and 5)
cv ≥ 25,000/453.9 = 0.0089 cm²/s = 303 ft²/yr; Hdr = 7.5 ft; t90 = 0.848 × 56.3/303
t90 ≤ 0.16 yr, about 2 months
↓
Step 5 · (e) If the clay passes σ′p
Virgin cv = 80/452.8 = 0.0019 cm²/s = 64 ft²/yr; t90 = 0.848 × 56.3/64
t90 ≈ 0.75 yr, about 9 months, and S larger (use Cc, Eq. 6.2-7)
↓
Solution
About 1.1 in., mostly within 2 months, if the clay stays overconsolidated.

Solution

(a) mv ≈ 0.0079 ft²/kip. (b) Oedometer-basis settlement 1.6 in. (c) Field settlement about 1.1 in. (d) cv ≥ 300 ft²/yr, so 90% consolidation in about 2 months or less. (e) If the new load takes the clay past its preconsolidation stress, consolidation slows to about 9 months and the settlement grows.

Settlement of about an inch over two months can be taken out by normal surfacing before the track is put to full speed. The answer rests on two things the SPT cannot confirm. First, the Stroud correlation was fitted to overconsolidated clays and is only reliable where that is true. Second, the time depends on whether the clay stays below σ′p. Both are settled by one or two consolidation tests on undisturbed samples from the widening; schedule them before the surfacing plan is fixed. If the tests show the clay is normally consolidated, μ rises toward 1, Cc governs, and a surcharge or waiting period (Section 6.2.8) may be needed. The differential between the new fill and the old embankment, which has finished settling, is what the track will feel, so check angular distortion at the transition (Section 6.2.7).