Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
Primary sources
Supplemental references
- U.S. Army Corps of Engineers (1990). Settlement Analysis. EM 1110-1-1904Official page ↗Library entry
- Lea, N. D. and Brawner, C. O. Highway Design and Construction Over Peat Deposits in Lower British Columbia. Highway Research BoardFind source ↗
- Speck, J. and Wall, J. Use of Lightweight Aggregate Fill in Highway Projects for Settlement Control and Construction Speed (presentation). Big River Industries / Carolina Stalite Co.Find source ↗
- Insulfoam. Geofoam — A Lightweight Fill Alternative (presentation)Find source ↗
- Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §8.8Find source ↗Library entry
File locations for these documents are listed under Supplemental References.
Project management sources
- Levy, S. M. (2010). Construction Process Planning and Management: An Owner’s Guide to Successful Projects. Burlington, MA: Butterworth-Heinemann (Elsevier)Find source ↗