6.2.13 Settlement Analysis Checklist

Settlement analysis is the serviceability companion to the bearing capacity calculations developed in Chapter 6.1.
Authors: Daniel P. Colwell and Mario Ruel
6.2.13 Settlement Analysis Checklist

Checklist · Part VI · Geotechnical Analysis

Settlement Analysis Checklist

Pre-Analysis0 of 6
Settlement Computation0 of 7
Time-Rate Analysis0 of 4
Deliverables0 of 6
Ticks are saved in this browser.
Plain text version

Pre-Analysis

  • [ ] Collect consolidation test results: C_c, C_s, e₀, c_v, C_α, σ'_p for all clay layers (Chapter 5.2)
  • [ ] Determine OCR from Casagrande construction; cross-check with CPTu K_D if available
  • [ ] Identify drainage boundaries (sand/gravel layers above/below clay; bedrock)
  • [ ] Confirm groundwater table: FEWL and SWL from Chapter 2.8
  • [ ] Compute effective stress profile with correct γ' = γ_sat − γ_w (γ_w = 62.4 pcf)
  • [ ] Confirm design load: DL, LL×DLF per the owner railroad's standard (Chapter 6.1)

Settlement Computation

  • [ ] Compute Δσ at midpoint of each sublayer (Boussinesq or 2:1)
  • [ ] Classify each layer as NC, OC with σ'_v0+Δσ < σ'_p, or OC crossing σ'_p
  • [ ] Apply correct equation (5.2-5, 5.2-6, or 5.2-7) for each sublayer
  • [ ] Sum sublayer settlements for S_c,total
  • [ ] Compute S_i (immediate) for granular soils or highly loaded stiff clays
  • [ ] Compute S_s (secondary) for OCR < 2 clays and all organic soils
  • [ ] Sum S_total; compare to FRA tolerance by track class (Table 6.2-1)

Time-Rate Analysis

  • [ ] Confirm H_dr (one-way or two-way); document drainage layer identification
  • [ ] Compute t_90 and t_95 using Eq. 6.2-11 and 6.2-13
  • [ ] If t_90 > project schedule, evaluate PVDs (Chapter 7.2) or surcharge preloading
  • [ ] Generate time-settlement curve; provide residual at Years 1, 5, 10, 25

Deliverables

  • [ ] Settlement calculation memorandum with all sublayer computations shown
  • [ ] Time-settlement curve (labeled with construction milestones and track placement date)
  • [ ] Residual settlement table (Years 1, 5, 10, 25 post-construction)
  • [ ] Angular distortion check at bridge approach transitions
  • [ ] Instrumentation plan if monitoring is required
  • [ ] Ground improvement recommendation (Chapter 7.2) if S_total exceeds tolerance
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-17 Preconsolidation stress / OCR from CPT σ'ₚ, OCRUse: Intact, inorganic clays. Limits: k is higher in aged/heavily OC clays and lower in fissured clays; calibrate with oedometer tests.
  • IX-05 Secondary compression ratio C_αUse: Secondary consolidation of soft soils; the ratio holds at a given effective stress level. Limits: Use Cc corresponding to the final stress (Cc varies with stress in structured clays).