↑ Parent Menu⌂ Main Menu
← Chapter 6.2 Settlement Analysis
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

Supplemental References

Settlement analysis is the serviceability companion to the bearing capacity calculations developed in Chapter 6.1.
Authors: Daniel P. Colwell and Mario Ruel
Supplemental References

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S7 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S8 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.

  1. U.S. Army Corps of Engineers (1990). Settlement Analysis. EM 1110-1-1904Find source ↗Library entry
  2. Lea, N. D. and Brawner, C. O. Highway Design and Construction Over Peat Deposits in Lower British Columbia. Highway Research BoardFind source ↗
  3. Speck, J. and Wall, J. Use of Lightweight Aggregate Fill in Highway Projects for Settlement Control and Construction Speed (presentation). Big River Industries / Carolina Stalite Co.Find source ↗
  4. Insulfoam. Geofoam — A Lightweight Fill Alternative (presentation)Find source ↗
  5. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
  6. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
  7. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 8 and 15Find source ↗Library entry
  8. Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §8.8Find source ↗Library entry
  9. Levy, S. M. (2010). Construction Process Planning and Management: An Owner’s Guide to Successful Projects. Burlington, MA: Butterworth-Heinemann (Elsevier). Used on this page for project-management materialFind source ↗
  10. Chai, J. and Carter, J. P. (2011). Deformation Analysis in Soft Ground Improvement. Geotechnical, Geological and Earthquake Engineering, Vol. 18. Dordrecht: Springer. Used on this page: Section 6.2.18Find source ↗
  11. Feng, X.-T. (ed.) (2017). Rock Mechanics and Engineering, Volume 4: Excavation, Support and Monitoring. Leiden: CRC Press/Balkema. Used on this page: Section 6.2.7 (settlement from tunneling)Find source ↗

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 6.2.8-1 — Vacuum Consolidation Process with PVDs, showing the impervious membrane, vacuum gas phase booster and air/water pump, horizontal and vertical vacuum transmission pipes, and peripheral trenches filled with bentonite and polyacrylate. (Figure from Masse et al. 2001) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  2. Photo 6.2.8-2 — Sand Platform and Geotextile. (Photograph from www.menardusa.com, courtesy of DGI-Menard, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  3. Photo 6.2.8-3 — Horizontal Drain Connection. (Photograph from www.menardusa.com, courtesy of DGI-Menard, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  4. Photo 6.2.8-4 — Installing the Membrane. (Photograph from www.menardusa.com, courtesy of DGI-Menard, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  5. Photo 6.2.8-5 — Peripheral Trench. (Photograph from www.menardusa.com, courtesy of DGI-Menard, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  6. Photo 6.2.8-6 — Vacuum Pumps. (Photograph from www.menardusa.com, courtesy of DGI-Menard, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  7. Photo 6.2.8-7 — Additional Fill Being Placed for Membrane Protection. (Photograph from www.menardusa.com, courtesy of DGI-Menard, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  8. Photo 6.2.8-8 — Sewage Treatment Plant General Layout, west of Pusan City, South Korea. (Figure from Masse et al. 2001.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  9. Photo 6.2.8-9 — Post Vacuum Rebound — recorded settlement approaching the 11.8-ft (3.61 m) target through November–December 1996, showing the brief rebound after the vacuum was stopped and the surcharge removed. (Figure from the Pusan, South Korea case history.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
← Previous · 6.0 Analysis Chapter 6.1 — Foundation Engineering: Bearing Capacity
Next · 6.0 Analysis → Chapter 6.3 — Slope Stability Analysis