| Topic | Chapter |
|---|---|
| SPT N₆₀ for E_s estimation in granular soils | Chapter 4.1 |
| CPTu and DMT for E_s, M, and OCR estimation in clay | Chapter 5.1 |
| Atterberg limits for C_c estimation (Skempton) | Chapter 2.2 |
| Groundwater and effective stress; seasonal WT variation | Chapter 2.8 |
| Bearing capacity (companion to settlement) | Chapter 6.1 |
| Slope stability of consolidating embankments | Chapter 6.3 |
| Seismic-induced settlement in granular soils | Chapter 6.5 |
| PVD and surcharge preloading design | Chapter 7.2 |
| Bridge approach settlement mitigation | Chapter 7.1 |
| Subgrade deformation under repeated train loading | Chapter 2.3 |
| Settlement plate monitoring and inclinometer readings | Chapter 5.3 |
| Settlement analysis documentation in geotechnical reports | Chapter 8.4 |
| Consolidation test (ASTM D2435) data and quality checks | Chapter 5.2 |
End of Chapter 6.2 — Settlement Analysis
Primary source: USACE EM 1110-1-1804, Geotechnical Investigations (January 2001). Settlement equations follow Terzaghi (1943), Skempton (1944), Mesri & Godlewski (1977), and FHWA GEC No. 5. FRA geometry tolerances per 49 CFR Part 213; AREMA MRE Chapter 8.