Before computing settlement, the change in vertical stress Δσ_v at depth z due to the applied load must be determined. For a uniformly loaded rectangular area of width B and length L at the surface:
Δσ_v = q · I_σ
Where I_σ is the Boussinesq influence factor (Newmark, 1935), a function of m = B/z and n = L/z:
I_σ = (1/4π)[2mn√(m²+n²+1)/(m²+n²+1+m²n²) × (m²+n²+2)/(m²+n²+1)
+ arcsin(2mn√(m²+n²+1)/(m²+n²+1+m²n²))]
Take the arcsin term between 0 and π: when m²n² > m²+n²+1 (wide, shallow cases), use π − arcsin(…) instead of the principal value. The equivalent tangent form is tan⁻¹[2mn√(m²+n²+1)/(m²+n²+1−m²n²)], adding π when the denominator is negative. Using the principal arcsin value alone under-predicts I_σ in that range.
Source: Newmark, N.M. (1935), Simplified Computation of Vertical Pressures in Elastic Foundations, Univ. of Illinois Eng. Exp. Station Circular 24, Eq. 5; Bowles, J.E. (1996), Foundation Analysis and Design, 5th ed., McGraw-Hill.
For practical use, Boussinesq influence charts (or tables) are used; I_σ ranges from 0.25 (square footing, z = 0) to near zero at large depth. For a 2:1 stress distribution approximation, commonly used for preliminary analysis:
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Iσ | intermediate value computed on this page | Another equation | Computed: I_σ = (1/4π)[2mn√(m²+n²+1)/(m²+n²+1+m²n²) × (m²+n²+2)/(m²+n²+1) | project-specific |
Δσ_v = Q / [(B + z)(L + z)] (psf)
Where Q = total load (lb), B and L = footing dimensions (ft), z = depth below footing base (ft). For strip loads (railroad embankments):
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Q | total load (lb), B and L = footing dimensions (ft), z = depth below footing base (ft) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
Δσ_v = (q/π)[β + sin β · cos(β + 2δ)] (psf)
Where β = the angle subtended by the load width at depth z (radians), δ = angle from load centerline, q = applied surface pressure (psf). For the centerline of a strip load:
Δσ_v,center = (q/π)[β + sin β]
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Δσv | intermediate value computed on this page | Another equation | Computed: Δσ_v = (q/π)[β + sin β · cos(β + 2δ)] (psf) | project-specific |
| β | the angle subtended by the load width at depth z (radians), δ = angle from load centerline, q = applied surface pressure (psf) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |