Settlement analysis is the serviceability companion to the bearing capacity calculations developed in Chapter 6.1. For railroad infrastructure, settlement governs more designs than bearing capacity failure — particularly embankment fills over soft alluvial soils, approach fills behind bridge abutments, and intermodal yard slabs on compressible clay. Total settlement S_total consists of three components: immediate (elastic) settlement S_i, primary consolidation settlement S_c, and secondary compression S_s. Time-rate analysis using Terzaghi's consolidation theory predicts when settlement will occur, enabling the consultant to recommend preloading, staged construction, or ground improvement to achieve acceptable geometry before track placement. This chapter develops all three settlement components in English units, cross-references FRA track geometry tolerances by track class as the acceptance criteria, and presents worked examples for a Class I railroad embankment over soft clay, a Class I railroad bridge approach fill with time-rate prediction, and a Class I railroad intermodal yard slab on overconsolidated clay. Owner railroad requirements are noted where they commonly differ.
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.