↑ Parent Menu⌂ Main Menu
← Chapter 6.1 Foundation Engineering: Bearing Capacity
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.1.14 Cross-References

Foundation bearing capacity governs the structural adequacy of every load-transfer element in railroad infrastructure — bridge abutments and piers, signal equipment…
Authors: Daniel P. Colwell and Mario Ruel
6.1.14 Cross-References
TopicChapter
SPT N₆₀ and (N₁)₆₀ correction proceduresChapter 4.1
CPTu tip resistance and friction ratio for soil profilingChapter 5.1
Soil classification for bearing capacity input (c, φ', γ)Chapter 2.2
Groundwater and effective stress; scour potentialChapter 2.8
Settlement analysis (companion to bearing capacity)Chapter 6.2
Slope stability of embankment around abutmentsChapter 6.3
Seismic and liquefaction effects on foundation capacityChapter 6.5
Ground improvement where bearing capacity is inadequateChapter 7.2
Retaining wall foundation designChapter 7.1
Track subgrade stress distribution below ballastChapter 2.3
Pile driving monitoring and CAPWAPChapter 5.3
Foundation analysis documentation in geotechnical reportsChapter 8.4
Consolidation and triaxial test data for c, φ', s_u inputChapter 5.2

End of Chapter 6.1 — Foundation Engineering: Bearing Capacity

Primary source: USACE EM 1110-1-1804, Geotechnical Investigations (January 2001). Bearing capacity equations follow Vesić (1973) as presented in FHWA GEC No. 5, AASHTO LRFD Bridge Design Specifications, and AREMA MRE Chapter 8.

← Previous · 5.0 Testing Chapter 5.5 — The Observational Method and Trigger-Action Response Plans
Next · 6.0 Analysis → Chapter 6.2 — Settlement Analysis