6.1.4 Cooper E-80 Load Application to Shallow Foundations

Foundation bearing capacity governs the structural adequacy of every load-transfer element in railroad infrastructure — bridge abutments and piers, signal equipment…
Authors: Daniel P. Colwell and Mario Ruel
6.1.4 Cooper E-80 Load Application to Shallow Foundations

For bridge abutment backwall pressure, use the AREMA Chapter 8 live-load surcharge for Cooper E-80 loading and confirm it with the owner railroad. For footing design, the geotechnical engineer converts the wheel load train to a resultant foundation reaction:

Track Load Transfer
Track Load Transfer
Figure 6.1-11. Simplified tie model: point wheel loads Q and uniform pressure over 2·ℓexc under each rail. Profillidis Fig. 6.1.10.
Figure 6.1-11. Simplified tie model: point wheel loads Q and uniform pressure over 2·ℓexc under each rail. Profillidis Fig. 6.1.10.
Equation 6.1-8 — Design Foundation Pressure:

P_design = (DL + LL·DLF) / A_footing

Where:

  • DL = dead load from structure (kips)
  • LL = live load reaction from Cooper E-80 analysis (kips)
  • DLF = dynamic load factor (1.20 for Class 3–4 freight; 1.30 for Class 5–6; 1.50 for high-speed passenger corridor; illustrative values only, since AREMA Chapter 8 impact depends on span and the owner railroad)
  • A_footing = footing area (ft²)

Take bridge seat reactions from the structural engineer's E-80 analysis of the actual span, then apply the owner railroad's impact factor; with an assumed DLF of 1.30, a seat reaction R becomes 1.30R per bearing.

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
DLdead load from structure (kips)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
LLlive load reaction from Cooper E-80 analysis (kips)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
DLFdynamic load factor (1.20 for Class 3–4 freightChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Afootingfooting area (ft²)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Measured contact pressure under a tie

The usual simplification treats the tie as a beam overhanging both rails, with a uniform ballast pressure over a length 2·ℓexc under each rail. Field measurements (ORE, 1973) show a different distribution: pressure concentrated under the rail seats, falling to about a quarter of the peak at the tie center (Figure 6.1-12). The peak pressure is given empirically by:

Figure 6.1-12. Measured pressure distribution under a tie, with peak σ under the rail seats and σ/4 at mid-tie. Profillidis Fig. 6.1.11.
Figure 6.1-12. Measured pressure distribution under a tie, with peak σ under the rail seats and σ/4 at mid-tie. Profillidis Fig. 6.1.11.
σ = P / [ α · ( L/2 + 3·ℓexc/2 ) ]

where P = axle load (2 × wheel load), α = tie width, L = tie length and ℓexc = distance from tie end to rail seat. For an E-80 or heavy-axle check of ballast and subballast bearing, this measured shape is a better basis for the pressure under the rail seat than a uniform average over the whole tie.

After Profillidis (2014), §11.8, Eq. 5.1.1, Figs. 6.1.10–6.1.11; after ORE D71 (1973). Full reference under Supplemental References.