6.1.5 Deep Foundation Bearing Capacity

Foundation bearing capacity governs the structural adequacy of every load-transfer element in railroad infrastructure — bridge abutments and piers, signal equipment…
Authors: Daniel P. Colwell and Mario Ruel
6.1.5 Deep Foundation Bearing Capacity
6.1.5.1 Pile Capacity Components

Total pile capacity Q_ult is the sum of side friction Q_s and tip resistance Q_p:

Types of Pile
Types of Pile
Combined End-bearing and Friction Pile
Combined End-bearing and Friction Pile
Friction Pile
Friction Pile
Equation 6.1-9 — Total Pile Capacity:

Q_ult = Q_s + Q_p = Σ(f_s · A_s) + q_p · A_tip

Where:

  • f_s = unit skin friction over each layer (psf)
  • A_s = pile surface area over each layer (ft²)
  • q_p = unit tip resistance (psf)
  • A_tip = pile tip area (ft²)
Pile Skin Friction Calculation
Pile Skin Friction Calculation

Allowable pile capacity:

Q_allow = Q_ult / FS

Tie FS to the construction control method (FHWA NHI-05-042, superseded by GEC 12, FHWA-NHI-16-009 (2016), Table 11-S2): 2.0 with a static load test; 2.25 with dynamic testing and signal matching (CAPWAP); 2.5 with indicator piles and wave equation analysis; 2.75 with wave equation analysis only; 3.5 with the Gates formula. Owner railroads may require higher values.

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
Qultintermediate value computed on this pageAnother equationComputed: Q_ult = Q_s + Q_p = Σ(f_s · A_s) + q_p · A_tipproject-specific
fsunit skin friction over each layer (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Aspile surface area over each layer (ft²)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
qpunit tip resistance (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Atippile tip area (ft²)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
FS3.0 without load testingChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Pile Load Test
Pile Load Test
Spread Footing vs Pile Load Transfer
Spread Footing vs Pile Load Transfer
6.1.5.2 α-Method (Cohesive Soils)

The α-method (API RP 2A) computes unit skin friction in cohesive soils as a fraction of undrained shear strength:

Equation 6.1-10 — α-Method Skin Friction:

f_s = α · su

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
suundrained shear strengthLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
Equation 6.1-11 — α Factor (API):

α = 0.5 · ψ^(−0.5) when ψ ≤ 1.0

α = 0.5 · ψ^(−0.25) when ψ > 1.0

Where ψ = s_u / σ'_v (undrained strength ratio). For railroad bridge piles in typical alluvial clay (s_u = 800–1,200 psf; σ'_v = 1,500–2,500 psf), ψ ≈ 0.4–0.6 and α ≈ 0.65–0.79.

Rock-Socketed Piles
Rock-Socketed Piles

Unit tip resistance for closed-end pipe piles in clay:

q_p = 9 · su (at pile tip)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
αintermediate value computed on this pageAnother equationComputed: α = 0.5 · ψ^(−0.5) when ψ ≤ 1.0project-specific
ψundrained shear strength = s_u / σ'_v (undrained strength ratio). For railroad bridge piles in typical alluvial clay (s_u = 800–1,200 psfLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
σ'vvertical stress / pore pressure = 1,500–2,500 psf), ψ ≈ 0.4–0.6 and α ≈ 0.65–0.79.Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.≈ 0.4–0.6 and α ≈ 0.65–0.79
6.1.5.3 β-Method (Cohesionless Soils)

In cohesionless soils, skin friction is computed as a fraction of the effective overburden stress:

Equation 6.1-12 — β-Method Skin Friction:

f_s = β · σ'_v

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Equation 6.1-13 — β Factor:

β = K · tan(δ)

Where:

  • K = lateral earth pressure coefficient ≈ K_0 = 1 − sin φ' for normally consolidated sand (1.2–1.8 for driven piles due to densification)
  • δ = pile-soil interface friction angle ≈ 0.8φ' for steel H-piles; 0.9φ' for concrete piles; δ = φ' for rough concrete

Typical β values: 0.25–0.40 for steel H-piles in medium-dense sand. β = 0.30 is an assumed default for HP14×117 piles in alluvial sand without site-specific testing.

Unit tip resistance in cohesionless soils (Meyerhof):

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
βintermediate value computed on this pageAnother equationComputed: β = K · tan(δ)project-specific
Klateral earth pressure coefficient ≈ K_0 = 1 − sin φ' for normally consolidated sand (1.2–1.8 for driven piles due to densification)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.≈ K_0 = 1 − sin φ' for normally consolidated sand (1.2–1.8 for driven piles due to
δpile-soil interface friction angle ≈ 0.8φ' for steel H-pilesLab test (or fraction of φ')Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic).0.6–1.0 φ' · by USCS group
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
Equation 6.1-14 — Pile Tip in Sand:

q_p = σ'_v · Nq* ≤ 0.5·P_a·Nq*·tan φ' (Meyerhof 1976)

Nq* = bearing capacity factor for pile tip (Vesić table, typically 50–80 for dense sand, φ' = 35–40°). Apply a limiting unit tip resistance (Meyerhof 1976) and confirm capacity by load testing.

Driven Pile
Driven Pile
End Bearing Pile
End Bearing Pile
Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
qpintermediate value computed on this pageAnother equationComputed: q_p = σ'_v · Nq* ≤ 0.5·P_a·Nq*·tan φ' (Meyerhof 1976)project-specific
Nq*bearing capacity factor for pile tip (Vesić table, typically 50–80 for dense sand, φ' = 35–40°)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 50–80 for dense sand, φ' = 35–40°
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
6.1.5.4 Meyerhof SPT-Based Method

For driven displacement piles, the Meyerhof (1976) empirical method using corrected SPT blow counts is widely used for preliminary designs and for a short-line railroad and regional railroad projects where detailed lab testing is not available:

Equation 6.1-15 — Meyerhof Skin Friction (Sand):

f_s = 0.02 · N60 (tsf)

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
N60SPT blow countField testStandard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60.loose sand 4–10, dense 30–50 blows/ft · by USCS group
Equation 6.1-16 — Meyerhof Tip Resistance (Sand):

q_p = 0.4 · N60 · (Db/B) ≤ 4·N60 (tsf)

Where:

  • N_60 = SPT blow count corrected for hammer energy (blows/ft)
  • D_b = depth of pile tip below top of bearing stratum (ft)
  • B = pile width or diameter (ft)

For piles in clay, the total-stress (α) method gives:

f_s = α·s_u (α-method, Section 6.1.5.2)

q_p = 9·s_u (9·s_u/2,000 tsf with s_u in psf)

These correlations are suitable for preliminary design and contractor quantity estimates; Verify capacity by static or high-strain dynamic load testing.

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
qpintermediate value computed on this pageAnother equationComputed: q_p = 0.4 · N60 · (Db/B) ≤ 4·N60 (tsf)project-specific
N60SPT blow count corrected for hammer energy (blows/ft)Field testStandard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60.loose sand 4–10, dense 30–50 blows/ft · by USCS group
Dbdepth of pile tip below top of bearing stratum (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Bpile width or diameter (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
suundrained shear strengthLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
Supplemental reference

Factor of safety tied to construction control (FHWA)

Client-specific safety factors in Section 6.1.5.1 are consistent with FHWA practice, which links the factor of safety for driven piles to the field verification method:

Table 11-S2. Recommended FS by construction control method (FHWA NHI-05-042, superseded by GEC 12, FHWA-NHI-16-009 (2016), Table 9-1)

Construction control methodFS
Static load test (ASTM D1143) with wave equation analysis2.00
Dynamic testing (ASTM D4945) with wave equation analysis2.25
Indicator piles with wave equation analysis2.50
Wave equation analysis only2.75
Gates dynamic formula3.50

Only resistance from layers that give long-term support counts toward the design load: exclude shaft resistance in soil that can scour in the design flood and in soft compressible layers. Those layers still resist driving, so the driving resistance the hammer must overcome is larger than the design capacity — a frequent source of under-sized hammers at railroad stream crossings.

Setup and relaxation

Table 11-S3. Soil setup factors (Rausche et al., 1996, in FHWA NHI-05-042, superseded by GEC 12, FHWA-NHI-16-009 (2016), Table 9-20)

Predominant soil along shaftRangeRecommended
Clay1.2–5.52.0
Silt–clay1.0–2.01.0
Silt1.5–5.01.5
Sand–clay1.0–6.01.5
Sand–silt1.2–2.01.2
Fine sand1.2–2.01.2
Sand0.8–2.01.0
Sand–gravel1.2–2.01.0

Setup factors should be confirmed with local experience and restrike testing. The opposite effect, relaxation, occurs in dense saturated fine sands and non-cohesive silts (dilation and temporary suction at the toe) and in some laminated shales (release of locked-in horizontal stress). Where relaxation is possible, capacity must be verified by restrike or load test after pore pressures equilibrate, not at end of driving.

Source: Hannigan, P. J., Goble, G. G., Likins, G. E. and Rausche, F. (2006). Design and Construction of Driven Pile Foundations, Vol. I. FHWA NHI-05-042 (superseded by GEC 12, FHWA-NHI-16-009 (2016))

Pile Foundations
Pile Foundations

Underpinning track: micropiles and screw piles

Where soft ground is too deep to remove economically, track load can be carried to competent soil on piles beneath a load-transfer platform. Micropiles are small-diameter drilled and grouted shafts. Screw piles are rotated in with a helix tip, need no excavation or grout, and can be installed from a rail-mounted rig, including in winter. At one Canadian peat site, 68 piles of 18-in. diameter in two flights at 10° from vertical underpinned about 400 ft of track settling into peat.

CFA pile rig
Photo 6.1.5-1. CFA pile rig From Brown et al. (2007)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Low headroom CFA pile application
Photo 6.1.5-2. Low headroom CFA pile application From Brown et al. (2007)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Installation of CFA pile reinforcement
Photo 6.1.5-3. Installation of CFA pile reinforcement From Brown et al. (2007)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Group of CFA piles with form for pile cap
Photo 6.1.5-4. Group of CFA piles with form for pile cap From Brown et al. (2007)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Pilecaps on CFA piles for column-supported embankment
Photo 6.1.5-5. Pilecaps on CFA piles for column-supported embankment From Brown et al. (2007)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
CFA piles used for secant pile wall
Photo 6.1.5-6. CFA piles used for secant pile wall From Brown et al. (2007)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Micropile applications diagram: foundation support, seismic retrofit, slope stabilization, earth retention
Photo 6.1.5-7. Micropile applications — foundation support, seismic retrofit, slope stabilization & earth retention From FHWA NHI-05-039Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Micropile installation on a slope
Photo 6.1.5-8. Micropile installation on a slope Courtesy of a specialty contractor, via FHWA / SHRP2 R02Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Micropile installation with limited headroom under a bridge
Photo 6.1.5-9. Micropile installation with limited headroom Courtesy of a specialty contractor, via FHWA / SHRP2 R02Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Deep Foundations
Deep Foundations
Micropile drilling under limited headroom
Micropile drilling under limited headroom
Figure 6.1-13. Pile foundation with a load-transfer platform spreading load into denser soil.
Figure 6.1-13. Pile foundation with a load-transfer platform spreading load into denser soil.
Figure 6.1-14. Screw-pile installation from a rail-mounted rig in winter.
Figure 6.1-14. Screw-pile installation from a rail-mounted rig in winter.
Figure 6.1-15. Screw-pile helix plate.
Figure 6.1-15. Screw-pile helix plate.
Figure 6.1-16. Pile installation equipment at a peat underpinning site.
Figure 6.1-16. Pile installation equipment at a peat underpinning site.

After Geotechnology for Railroaders Program, Module 6.2; §05. Full reference under Supplemental References.

6.1.5.5 Pile Design Additions: CPT Base Resistance, Separate Factors and Downdrag

CPT-based base resistance

Equation 6.1-23. Pile base resistance from cone resistance

qb,ult = 0.9 qc,m  (plunging failure);   qb,0.1 = 0.6 qc,m  (at a settlement of 10% of the diameter)

Bell and Robinson (2012), Eqs. 54.13–54.14, p. 812; the second after Lehane et al. (2005). qc,m = weighted average cone resistance from 8D above to 4D below the toe (the Dutch method), which accounts for weaker layers near the toe.

Correlations of shaft friction with cone resistance vary widely, from about qc/10 to qc/40; the effective-stress methods of Section 6.1.5 (BC-12) are usually more reliable for shaft resistance (Bell and Robinson, 2012, p. 812).

Separate factors on base and shaft

Equation 6.1-24. Safe working load with separate factors

SWL = Qb/Fb + Qs/Fs

Bell and Robinson (2012), Eq. 54.16, p. 814. Traditional UK values: 2.0 overall with preliminary load tests; 2.5 overall, or 1.5 on shaft and 3.0 on base, with working-pile tests; 3.0 overall without testing.

The separate factors recognise that the base needs much more movement than the shaft to mobilise. Follow AREMA and the owner's requirements where they set the factor; use the split check to see whether a design leans on base resistance it will not mobilise at working settlement.

Negative skin friction and the neutral point

Where new fill or a lowered water table makes the soil settle more than the pile, the upper shaft carries negative skin friction. The point where pile and soil settle equally is the neutral point, and the maximum axial load in the pile occurs there (Ellis and O'Brien, 2012, Eq. 57.2, p. 888):

Equation 6.1-25. Maximum pile load with negative skin friction

Qmax = Qh + Qs− = Qs+ + Qb

Qh = load at the pile head; Qs− = negative skin friction above the neutral point; Qs+ = positive shaft resistance below it; Qb = base resistance.

Downdrag raises the structural load in the pile and adds settlement; it does not reduce the geotechnical capacity in the same way as an applied load. Bridge piers and abutment piles next to a new or raised approach embankment on soft clay are the common railroad case. The same embankment can also push the piles sideways; piles designed only for vertical load are vulnerable to lateral soil movement, and reducing the soil movement (ground improvement, lightweight fill, staged construction) is often simpler than designing the piles for it (Ellis and O'Brien, 2012, pp. 887–897).

Sources

Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.

  • Bell, A. and Robinson, C. (2012). Single piles. Chapter 54 in Burland, J., Chapman, T., Skinner, H. and Brown, M. (eds) (2012). ICE Manual of Geotechnical Engineering, Volume II: Geotechnical Design, Construction and Verification. ICE Publishing, London, pp. 803–822Find source ↗Library entry
  • Ellis, E. and O'Brien, A. S. (2012). Global ground movements and their effects on piles. Chapter 57 in Burland, J., Chapman, T., Skinner, H. and Brown, M. (eds) (2012). ICE Manual of Geotechnical Engineering, Volume II: Geotechnical Design, Construction and Verification. ICE Publishing, London, pp. 887–898Find source ↗Library entry
Supplemental reference · Goswami (2015), Chs. 207 and 507

Batter Piles and Underpinning Existing Foundations

Batter piles are driven at an incline, commonly 1H:12V to 5H:12V, so that a pile group can resist horizontal load by axial force rather than bending. The axial load in each pile is found from the resultant of the vertical and horizontal loads resolved along the pile axes. Batter piles are stiff laterally, but in settling ground the soil hangs on them and induces bending, and they transmit horizontal earthquake load to the cap with little give.

Underpinning extends an existing foundation to a deeper or stronger bearing layer, or supports it while the ground beside it is excavated. Common methods:

  • Bracket piles: steel push piers or helical piles installed beside the footing and connected to it with brackets, then jacked or torqued to transfer load.
  • Temporary support with maintenance jacking: the structure is supported on jacks over temporary piles or cribbing while the permanent foundation is built, and the jacks are adjusted to keep it level.
  • Underpinning a damaged pile foundation: new piles are installed beside the defective ones and a new cap or needle beams transfer the load to them.

For railroad work: Bridge abutments and piers that have settled or been undermined by scour, and signal and catenary foundations next to new excavations, are typical underpinning candidates. Track windows and vertical clearance usually favor bracket piles, helical piles and micropiles (Section 6.1.20). Keep any jacking within the track geometry limits set for the work and monitor the track during it (Chapter 5.3).

Source: Goswami, I. (2015). Civil Engineering All-In-One PE Exam Guide: Breadth and Depth, 3rd ed. New York: McGraw-Hill Education, Chapter 207 (Batter Piles) and Chapter 507 (Underpinning). Full reference under Supplemental References.

Supplemental reference · Bowles (1996), Section 16-17

Buckling of partially embedded piles and poles

A pile that is fully embedded in any soil stiffer than very soft clay is braced along its length and rarely buckles; the structural check is crushing of the section. Buckling becomes a design case when part of the pile stands free: trestle bents and pile bents, piles exposed by scour, piles through water or very soft clay, and poles and masts. The soil does not fix the pile at the ground line; the point of fixity is some distance below it, deeper in softer soil, so the effective column length is longer than the free length.

Bowles’ example shows the size of the effect: a 10-in. by 0.25-in. steel pipe pile 39 ft long, with 23 ft standing free and 16 ft embedded in extremely soft clay (unconfined strength about 210 psf) on rock, has a computed buckling load of about 45 kips. The Euler load for a column fixed at the ground line (effective length 2 × 23 = 46 ft) is about 86 kips, and for a column fixed at the tip (effective length 2 × 39 = 78 ft) about 30 kips. The true value lies between and closer to the second, so assuming fixity at the ground line would have been unsafe by almost a factor of two.

For railroad work: For timber and steel pile trestles, check buckling of each bent pile with the free length measured from the bottom of the design scour, not the streambed, and with fixity taken several pile diameters below that, or with a beam-on-elastic-foundation (p-y) buckling analysis. Re-check old bents after a flood has lowered the bed. Longitudinal and transverse bracing between piles reduces the effective length and is often the cheapest repair.

Source: Bowles, J. E. (1996). Foundation Analysis and Design, 5th ed., Example 16-14 (converted from SI). McGraw-Hill

Supplemental reference

Base and Side Post-Grouting of Drilled Shafts

The base of a drilled shaft in sand or gravel is often loosened by drilling and cleaning, and the end bearing only develops after large settlement. Post-grouting injects cement grout under pressure through tubes cast into the shaft, after the concrete has cured. Grout at the base (through a sleeve-port tube circuit or a flat-jack cell) densifies and preloads the disturbed soil at the tip. Grout along the side (through sleeve ports on tubes tied to the cage) improves the shaft-soil contact. The grouting is itself a load test: the grout pressure acting on the base area, resisted by side friction, shows the tip resistance mobilized, and the upward movement of the shaft top is measured as the grouting proceeds.

Xiao, Wu and Wu (2009) report base and side post-grouting of more than 18,000 slurry-drilled piles at one airport terminal, with 72 static load tests showing large gains in capacity and in settlement performance, especially in sand. FHWA’s drilled shaft manual (GEC 10) covers base grouting design, the records to keep and acceptance.

For railroad work: Consider post-grouting for bridge pier and abutment shafts that end in sand or gravel, where end bearing would otherwise need large settlement to develop, or where a shorter shaft avoids a difficult layer. Specify the grouting criteria (target grout pressure, maximum grout volume and maximum upward movement of the shaft top) and require a record for each shaft. Do not take credit for the grouted base in design without load test or grouting data from the site. Grout volumes far above the estimate can mean grout escaping into a void or a coarse layer, which needs investigating, especially in karst.

Source: Xiao, D., Wu, C. and Wu, C. (2009), “Bored Pile Post-Grouting Technology and Its Engineering Application,” ASCE GSP 188, 198–206 (summarized in Chapter 7.2, Section 7.2.18); FHWA GEC 10, Drilled Shafts: Construction Procedures and Design Methods (FHWA-NHI-18-024, 2018), FHWA geotechnical publications. Summarized and paraphrased.