6.1.6 Pile Group Efficiency

Foundation bearing capacity governs the structural adequacy of every load-transfer element in railroad infrastructure — bridge abutments and piers, signal equipment…
Authors: Daniel P. Colwell and Mario Ruel
6.1.6 Pile Group Efficiency

When piles are installed in a group, the group capacity may be less than the sum of individual pile capacities due to stress overlap. The group efficiency factor η is:

Pile Foundation vs Raft Foundation
Pile Foundation vs Raft Foundation
Equation 6.1-17 — Group Efficiency (Converse-Labarre):

η = 1 − θ · [(n−1)·m + (m−1)·n] / (90 · m · n)

Where:

  • θ = arctan(D/S) in degrees; D = pile diameter (ft); S = center-to-center spacing (ft)
  • m = number of columns; n = number of rows

Common practice (see AREMA MRE Chapter 8 for piles) uses a center-to-center spacing of at least about 2.5–3 pile diameters. At S = 3D, common for railroad bridge pile groups, η ≈ 0.72–0.82.

For cohesive soils, the block failure mode must also be checked: the lesser of the group efficiency method and the block failure capacity controls.

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
θarctan(D/S) in degreesChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Dpile diameter (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Scenter-to-center spacing (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
mnumber of columnsChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
nnumber of rowsChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Equation 6.1-18 — Block Failure Capacity:

Q_block = 2·D_g·(B_g + L_g)·su,avg + Nc·su,tip·B_g·L_g

Where:

  • D_g = pile group embedment depth (ft)
  • B_g, L_g = block perimeter dimensions (ft)
  • N_c = 5(1 + 0.2D_g/B_g)(1 + 0.2B_g/L_g) ≤ 9 (Skempton)
  • s_u,avg = average undrained strength along pile perimeter (psf)
  • s_u,tip = undrained strength at pile tip elevation (psf)
Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Dgpile group embedment depth (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Nc5(1 + 0.2D_g/B_g)(1 + 0.2B_g/L_g) ≤ 9 (Skempton)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
suundrained shear strengthLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group