↑ Parent Menu⌂ Main Menu
← Chapter 6.1 Foundation Engineering: Bearing Capacity
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.1.22 Downdrag, Dragload and the Neutral Plane

Foundation bearing capacity governs the structural adequacy of every load-transfer element in railroad infrastructure — bridge abutments and piers, signal equipment…
Authors: Daniel P. Colwell and Mario Ruel
6.1.22 Downdrag, Dragload and the Neutral Plane

When the ground around a pile settles more than the pile, the soil drags the pile down. The downward shear is called negative skin friction and the force it adds is the dragload. It can be as large as the design load. On railroads it most often comes from raising an approach embankment over soft clay at a bridge, widening an embankment beside an existing pile-supported structure, lowering the groundwater (dewatering, drainage improvements, pumping), and wetting of collapsible soil (Chapter 2.9). It needs part of the pile to be fixed: if the whole pile moves down with the soil, no dragload develops (Bowles 1996; Das and Sivakugan 2019).

6.1.22.1 The neutral plane

Above the neutral plane the soil moves down relative to the pile and the friction acts downward; below it the pile moves down relative to the soil and the friction acts upward. The axial load in the pile is greatest at the neutral plane, and there the pile and the soil settle by the same amount. For a pile bearing on rock or dense sand the neutral plane is close to the top of the bearing layer. For a floating pile it lies within the soft layer; measurements reviewed by Bowles place it between one-third and one-half of the embedded length above the pile point, with L/3 when the point carries much of the load.

Equation 6.1-31. Dragload, granular fill over consolidating clay (β method)

fn = K′σ′o tanδ′,   K′ = 1 − sinφ′,   σ′o = γfHf + γ′z
Qn = p K′ tanδ′ γfHf L1 + p K′ tanδ′ γ′ L1² / 2

p = pile perimeter; z measured down from the top of the clay; L1 = depth of the neutral plane below the top of the clay; δ′ = 0.5 to 0.7φ′. Use moist unit weights above the water table. For a clay fill over sand, integrate over the fill height only: Qn = p K′ tanδ′ γfHf²/2 (Das and Sivakugan 2019, Eqs. 12.130 and 12.133).

Equation 6.1-32. Depth of the neutral plane for a floating pile

L1² + (2γfHf/γ′) L1 − (L − Hf)[(L − Hf)/2 + γfHf/γ′] = 0

L = pile length measured from the top of the fill, so L − Hf is the embedment in clay. From equating downward friction above and upward friction below the neutral plane with no point load (Bowles 1996, Eq. 18-18; Das and Sivakugan 2019, Eq. 12.131). For an end-bearing pile take L1 = L − Hf.

Equation 6.1-33. Largest axial load in the pile

Pmax = PD + Qn   (at the neutral plane)

PD = permanent load only. Transient loads (live load, braking) are not added to the dragload: when they act, the pile moves down relative to the soil and the negative friction near the neutral plane reverses.

6.1.22.2 Pile groups

For closely spaced piles the soil between them moves with the group, and the dragload on the group can be less than the sum for single piles. Bowles recommends checking both and using the smaller: the sum of single-pile dragloads, and the shear on the perimeter of the block plus the weight of the soil trapped between the piles, Qn = fsLfPg + γLfA, where Pg and A are the perimeter and plan area of the group. Corner and edge piles carry more dragload than interior piles.

6.1.22.3 What to check and how to reduce it

  • Structural: PD + Qn at the neutral plane against the pile section, including driving damage allowances.
  • Geotechnical: count only resistance below the neutral plane toward the design capacity; resistance in the settling layers does not support the structure in the long term (Section 6.1.5.5 and Table 11-S2 exclusions).
  • Settlement: the pile head settles as much as the soil does at the neutral plane plus the elastic shortening of the pile. A low neutral plane in a stiff layer means small settlement; a floating pile in consolidating clay settles with the clay.
  • Cap: if the fill under a pile cap settles away from it, the cap weight goes onto the piles; in expansive clay the reverse (uplift on the cap and piles) needs a void form.
  • Reduction: place the fill and let it consolidate (with surcharge or wick drains) before driving piles; lightweight fill (Section 7.2); bitumen coating or casing in the downdrag zone; end-bearing piles sized for the dragload.

For railroad work: Most dragload on railroad bridges is self-inflicted: the approach is raised or widened at the same time as the abutment piles are driven. Sequence the work so the approach fill is placed and monitored (settlement plates, Chapter 5.3) before the piles go in wherever the schedule allows. Where track must stay in service and the fill must be placed later, design the piles for the dragload and expect the approach to settle relative to the back wall; plan for a transition (approach slab, graded ballast depth or geogrid-reinforced transition) and for surfacing. The Calculators table lists a driven pile downdrag tool for this check.

6.1.22.4 Worked example

Example 6.1-7: Dragload on Abutment Piles Behind a New Approach Fill

Problem Statement

A bridge on a Class I railroad located in Louisiana is being replaced, and the approach embankment is raised 6 ft with granular fill at the same time. The new abutment is on 14-in. steel pipe piles driven through 40 ft of soft clay into dense sand. The clay will consolidate under the new fill after the piles are driven, so the soil will move down past the piles. Estimate the dragload and the largest axial load in a pile (Section 6.1.22).

New granular fill, Hf = 6 ft, γ = 120 pcf Soft clay, 40 ftγsat = 112 pcf, φ′ = 26° Dense sand (pile bears here) GWT at original ground 14-in. pipe pile, PD = 110 kips soil settles neutral plane? L1 Required: (a) dragload Qn, end-bearing pile (b) L1 and Qn, floating pile (c) maximum axial load and stress Black = given; red = required
Figure 6.1-17. Given and required for Example 6.1-7: pile through new fill and soft clay.

Given

VariableValueDescription
Hf6 ft; γf = 120 pcfNew granular fill above the water table
Clay40 ft; γsat = 112 pcf; φ′ = 26°Groundwater at the original ground surface, so γ′ = 112 − 62.4 = 49.6 pcf
D14 in. (wall 0.375 in.)Steel pipe pile, fy = 45 ksi, As = 16.05 in.²
PD110 kipsPermanent (dead) load per pile
δ′0.6φ′Pile–soil friction angle (Das: 0.5 to 0.7φ′)

Required

  • (a) Dragload Qn if the pile is end-bearing (neutral plane at the top of the sand)
  • (b) Depth of the neutral plane L1 and Qn if the pile were floating in the clay
  • (c) Largest axial load and steel stress for case (a)

Equations

  1. Eq. 6.1-31: K′ = 1 − sin φ′; Qn = p K′ tanδ′ γfHf L1 + p K′ tanδ′ γ′ L1²/2
  2. Eq. 6.1-32: L1² + (2γfHf/γ′) L1 − (L − Hf)[(L − Hf)/2 + γfHf/γ′] = 0
  3. Eq. 6.1-33: Pmax = PD + Qn at the neutral plane

Steps

Step 1 · Coefficients
K′ = 1 − sin 26° = 0.562; δ′ = 15.6°, tanδ′ = 0.279; K′tanδ′ = 0.157; p = π × 14/12 = 3.67 ft
K′tanδ′ = 0.157
Spot check: Within the 0.15 to 0.30 range usually back-figured for soft clays; Das quotes 0.22 for the Oslo case.
↓
Step 2 · (a) End-bearing, L1 = 40 ft
3.67 × 0.157 × 120 × 6 × 40 = 16,550 lb; 3.67 × 0.157 × 49.6 × 40²/2 = 22,810 lb
Qn ≈ 39.4 kips
↓
Step 3 · (b) Floating pile, neutral plane
Coefficient 2(120)(6)/49.6 = 29.0; constant 40(20 + 14.5) = 1,381; L1 = [−29.0 + √(29.0² + 4 × 1,381)]/2
L1 = 25.4 ft below the clay surface; Qn ≈ 19.7 kips
Spot check: L1/40 = 0.63, inside the range Bowles gives from measurements (neutral point between L/3 and L/2 above the pile point, that is 0.50 to 0.67 of the length down).
↓
Step 4 · (c) Largest axial load
110 + 39.4
Pmax ≈ 149 kips at the top of the sand
↓
Step 5 · (c) Steel stress
149 / 16.05
f ≈ 9.3 ksi = 0.21 fy
Spot check: Below 0.5fy = 22.5 ksi, a common working-stress limit for unfilled steel pipe; confirm with the owner railroad’s structural criteria.
↓
Solution
Qn ≈ 39 kips for the end-bearing pile; neutral plane at about 25 ft and Qn ≈ 20 kips if floating; Pmax ≈ 149 kips, f ≈ 9.3 ksi.

Solution

(a) Qn ≈ 39 kips. (b) L1 ≈ 25 ft below the top of the clay; Qn ≈ 20 kips. (c) About 149 kips at the top of the sand; steel stress about 9.3 ksi.

The dragload is a third of the dead load, so it must be in the structural check and the drivability study (the pile has to be driven to a capacity that covers the dead load plus the dragload, because the clay contributes nothing). It does not add to the settlement of an end-bearing pile, but the fill settles while the abutment does not: the approach slab or the track at the back wall will drop. Options: build the fill and wait (or surcharge and wick-drain it) before driving piles, use lightweight fill, coat the piles in the clay zone with bitumen, or sleeve them. No credit should be taken for shaft resistance in the clay or the fill.

6.1.22.5 Sources

  1. Bowles, J. E. (1996). Foundation Analysis and Design, 5th ed. New York: McGraw-Hill.
  2. Das, B. M. and Sivakugan, N. (2019). Principles of Foundation Engineering, 9th ed., SI edition. Boston: Cengage Learning.
← Previous · 5.0 Testing Chapter 5.5 — The Observational Method and Trigger-Action Response Plans
Next · 6.0 Analysis → Chapter 6.2 — Settlement Analysis