Plain text version
Pre-Design
- [ ] Confirm design loads: DL, LL (Cooper E-80), DLF by client, wind/seismic
- [ ] Review boring logs and laboratory data for all foundation zones
- [ ] Identify groundwater conditions; obtain FEWL and SWL readings (Chapter 2.8)
- [ ] Check scour potential at stream crossings (Chapter 2.8, Section 2.8.5.4)
- [ ] Confirm the local frost penetration depth
- [ ] Identify contaminated soil zones near existing industrial sites
Shallow Foundation Design
- [ ] Compute q_ult using Vesić equation; verify all factor tables
- [ ] Apply correct B' and L' for eccentric loading; verify middle-third rule
- [ ] Check FS ≥ 3.0 or FS ≥ 2.5 (a short-line railroad with borings)
- [ ] Cross-reference settlement analysis (Chapter 6.2) for serviceability
- [ ] Verify D_f ≥ local frost depth
Pile Foundation Design
- [ ] Select pile type and confirm it with the owner railroad (Table 6.1-3)
- [ ] Compute Q_s by α- or β-method; compute Q_p; sum Q_ult
- [ ] Verify FS against Table 6.1-3 for the testing program planned
- [ ] Compute group efficiency (Converse-Labarre); check block failure in clay
- [ ] Check uplift capacity for signal mast and wind-sensitive structures
- [ ] Specify WEAP analysis
- [ ] Specify load test type, quantity, and timing (before production driving)
Deliverables
- [ ] Foundation analysis memo with all calculations
- [ ] Boring log cross-section with pile tip elevations marked
- [ ] Pile driving criteria table (set, stroke, cushion specifications)
- [ ] Load test plan submitted to client Bridge/Structures Engineering
- [ ] Settlement calculation summary (Chapter 6.2 cross-reference)
- [ ] Coordination memo to the railroad's Bridge Engineering or the railroad's Structures as applicable