Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S7 for railroad clients; tables are condensed from the book and its figures are not reproduced. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.
- Naval Facilities Engineering Command (1986). Foundations and Earth Structures, Design Manual 7.02 (NAVFAC DM-7.02)Find source ↗
- U.S. Army Corps of Engineers (1994). Rock Foundations. EM 1110-1-2908Find source ↗Library entry
- Hannigan, P. J., Goble, G. G., Likins, G. E. and Rausche, F. (2006). Design and Construction of Driven Pile Foundations, Vol. I. FHWA NHI-05-042 (superseded by GEC 12, FHWA-NHI-16-009 (2016))Find source ↗
- Das, B. M. Principles of Foundation Engineering. Cengage LearningFind source ↗
- Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
- Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
- Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: ch. 10Find source ↗Library entry
- Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & Sohn. Used on this page for project-management materialFind source ↗
- Goswami, I. (2015). Civil Engineering All-In-One PE Exam Guide: Breadth and Depth, 3rd ed. New York: McGraw-Hill Education. Used on this page: Section 6.1.5 (batter piles and underpinning)Find source ↗
- Das, B. M. and Sivakugan, N. (2019). Principles of Foundation Engineering, 9th ed., SI edition. Boston: Cengage Learning. Used on this page: Sections 6.1.22 and 6.1.23
- Bowles, J. E. (1996). Foundation Analysis and Design, 5th ed. New York: McGraw-Hill. Used on this page: Sections 6.1.22 and 6.1.23
Photograph credits
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.
- Photo 6.1.5-1 — CFA pile rig From Brown et al. (2007) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.1.5-2 — Low headroom CFA pile application From Brown et al. (2007) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.1.5-3 — Installation of CFA pile reinforcement From Brown et al. (2007) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.1.5-4 — Group of CFA piles with form for pile cap From Brown et al. (2007) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.1.5-5 — Pilecaps on CFA piles for column-supported embankment From Brown et al. (2007) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.1.5-6 — CFA piles used for secant pile wall From Brown et al. (2007) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.1.5-7 — Micropile applications — foundation support, seismic retrofit, slope stabilization & earth retention From FHWA NHI-05-039 Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.1.5-8 — Micropile installation on a slope Courtesy of a specialty contractor, via FHWA / SHRP2 R02 Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.1.5-9 — Micropile installation with limited headroom Courtesy of a specialty contractor, via FHWA / SHRP2 R02 Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗