6.1.21 Load Distribution in a Pile Group

Foundation bearing capacity governs the structural adequacy of every load-transfer element in railroad infrastructure — bridge abutments and piers, signal equipment…
Authors: Daniel P. Colwell and Mario Ruel
6.1.21 Load Distribution in a Pile Group

Bridge piers and abutments, retaining walls on piles and signal bridge foundations carry eccentric loads: earth pressure, braking and wind tilt the resultant away from the center of the pile group. With a rigid cap the pile heads stay in a plane, so the group behaves like a beam cross-section in combined axial load and bending, in which each pile is a unit area. The pile loads then follow from P/n ± Mc/I. The check shows whether the most heavily loaded pile is within its allowable capacity and whether any pile goes into tension.

6.1.21.1 Method

Equation 6.1-30. Pile load in a group under a rigid cap

pi = P/n + My(xi − x̄)/Σ(x − x̄)² + Mx(yi − ȳ)/Σ(y − ȳ)²

n = number of piles; x̄, ȳ = centroid of the group; My, Mx = moments about the centroidal axes, including the eccentricity of P. Valid for vertical piles of equal stiffness in a layout symmetric about its centroidal axes.

For a long wall on several rows of piles at different spacings, analyze a “repeating length” that contains a whole pattern of piles and apply the wall load for that length.

6.1.21.2 Worked example

Example 6.1-6: Pile Loads Under a Retaining Wall Footing

A cantilever retaining wall along a Class I railroad located in Ohio is founded on three rows of piles 3 ft apart. Piles are at 4 ft centers in the front and middle rows and 6 ft in the rear row. The wall load is 20 kips per foot with its resultant 3 ft 3 in. from the front row (Hicks, 2000, load distribution in a pile group).

P = 240 kipsxP = 3.25 ft3 ft3 ft3 piles32GivenRows at x = 0, 3, 6 ft3 + 3 + 2 piles per 12-ft lengthP = 240 kips at xP = 3.25 ftAllowable 45 kips per pileRequiredLoad per pile in each rowTension check
Section through the wall footing over one 12-ft repeating length: three rows of piles under an eccentric wall load.

Given

VariableValueDescription
Rowsx = 0, 3 and 6 ftFront, middle, rear
Repeating length12 ftContains 3 + 3 + 2 piles
P20 kips/ft × 12 ft = 240 kipsLoad on the repeating length
xP3.25 ftFrom the front row
Allowable pile load45 kipsCompression

Required

  • Centroid and moment of inertia of the group
  • Load in each row
  • Equilibrium check

Equations

  1. Eq. 6.1-30: x̄ = Σx/n; I = Σ(x − x̄)²
  2. Eq. 6.1-30: M = P(xP − x̄)
  3. Eq. 6.1-30: p = P/n + M(x − x̄)/I

Steps

Step 1 · Centroid and I
x̄ = (3 × 0 + 3 × 3 + 2 × 6)/8; I = 3(2.625)² + 3(0.375)² + 2(3.375)²
x̄ = 2.625 ft; I = 43.9 ft²
↓
Step 2 · Moment
240 × (3.25 − 2.625)
M = 150 kip-ft
↓
Step 3 · Pile loads
240/8 = 30.0; M/I = 3.42 kips/ft; front 30.0 − 3.42 × 2.625; middle 30.0 + 3.42 × 0.375; rear 30.0 + 3.42 × 3.375
Front 21.0; middle 31.3; rear 41.5 kips
↓
Step 4 · Equilibrium
3(21.0) + 3(31.3) + 2(41.5); moments about the front row 3(31.3)(3) + 2(41.5)(6)
240 kips; 780 kip-ft = 240 × 3.25
Spot check: Both match the applied load and its moment, as in Hicks.
↓
Solution
Front 21.0, middle 31.3, rear 41.5 kips per pile; all in compression and within 45 kips.

Solution

The rear-row piles carry the most, 41.5 kips each, within the 45-kip allowable; no pile is in tension.

The heavier rear row is why it has wider spacing in plan but the most load per pile: moving the resultant 0.6 ft behind the centroid adds 11.5 kips to each rear pile. If train surcharge or seismic load moves the resultant further back, check the front row for uplift.

Open the pile group load calculator →
Pile loads under a rigid cap from any pile layout, an eccentric vertical load and applied moments about both axes, with tension and capacity flags and the equilibrium check.

6.1.21.3 Sources

The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.

  • T.G. Hicks (ed.), Handbook of Civil Engineering Calculations, McGraw-Hill (2000): Section 1, load distribution in a pile group; Section 4, load distribution among piles.Find source ↗Library entry
  • FHWA NHI-05-042 (superseded by GEC 12, FHWA-NHI-16-009 (2016)), Design and Construction of Driven Pile Foundations (2006): pile group load distribution.Find source ↗
← Previous · 5.0 Testing Chapter 5.5 — The Observational Method and Trigger-Action Response Plans
Next · 6.0 Analysis → Chapter 6.2 — Settlement Analysis