Signal masts, catenary and communication poles, sign bridges, light towers and the piles of retaining walls and bridge bents along the track all carry horizontal load: wind on the structure and wires, braking and centrifugal forces, earth pressure and impact. Broms’ method (1964) is the standard hand check of the ultimate lateral load. It treats the soil reaction as a simple pressure diagram and asks which happens first: the soil around a short, stiff pile fails as the pile rotates or translates, or a long pile forms a plastic hinge at the yield moment of its section. It is quick, it brackets the answer, and it shows whether more embedment helps (short pile) or only a stronger section will (long pile). It gives no deflection; the working-load deflection still comes from p-y analysis (Section 6.1.6 tools).
In clay the resistance is taken as zero over the top 1.5 diameters, where the soil can flow up and around the pile, and 9sub below. In sand the passive pressure on the pile is taken as three times the Rankine value, 3Kpγ′z, which allows for the three-dimensional wedge in front of a narrow pile. The two free-head cases used most along the track are:
Equation 6.1-26. Broms, free head, cohesive soil
f = depth below 1.5b to the point of zero shear (maximum moment); g = remaining length below it. The short-pile equation is solved by trial (the calculator uses bisection); the long-pile equation is a quadratic in Hu.
Equation 6.1-27. Broms, free head, cohesionless soil
Kp = tan²(45° + φ′/2); γ′ = effective (buoyant below the water table) unit weight.
| Behavior | Cohesive soil | Cohesionless soil |
|---|---|---|
| Short (translates) | Hu = 9sub(L − 1.5b), if Hu(1.5b + 0.5f) ≤ My | Hu = 1.5γ′bL²Kp, if (2/3)HuL ≤ My |
| Intermediate (hinge at head) | Hu(1.5b + 0.5f) − My = 2.25subg² | Hu = (0.5γ′bL³Kp + My)/L |
| Long (hinges at head and depth) | Hu = 2My/(1.5b + 0.5f) | Hu = 2My/(0.67f) |
FHWA NHI-05-042 (superseded by GEC 12, FHWA-NHI-16-009 (2016)) recommends a factor of safety of about 2.5 on the Broms ultimate load. The yield moment is My = FyZ for a steel pile (plastic modulus Z) and the nominal flexural strength of the section for a reinforced concrete shaft.
A cantilever signal mast on a Class I railroad located in Ohio sits on a 30-in. drilled shaft in stiff clay. Wind on the mast and signal heads gives a working lateral load of 12 kips whose resultant acts 20 ft above the ground. The shaft head is free to rotate.
| Variable | Value | Description |
|---|---|---|
| Soil | Stiff CL, su = 1,500 psf | UU triaxial, upper 15 ft |
| b | 30 in. = 2.50 ft | Shaft diameter |
| L | 15 ft | Embedded length |
| e | 20 ft | Height of load resultant |
| My | 900 kip-ft | Nominal flexural strength of the shaft |
| H | 12 kips | Working lateral load |
| FS | 2.5 | FHWA for Broms’ method |
The 30-in. shaft 15 ft long has an ultimate lateral capacity of 36.0 kips (short-pile behavior) and an allowable load of 14.4 kips, above the 12-kip working load.
Because the short and long capacities are close, the design is balanced: a longer shaft gains little because the section would yield at about 37 kips. Deflection at 12 kips still needs a p-y check against the signal maintainer’s tolerance, and the top 1.5b of clay that the method ignores must not be disturbed by ditching or cable trenching beside the mast.
Open the laterally loaded pile calculator →
Broms’ short, intermediate and long modes for a free or fixed head in clay or sand, the governing ultimate and allowable lateral load, the embedment needed for a working load, and a capacity-versus-length chart.
The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.