- Always check both bearing capacity and settlement: Bearing capacity governs for short, stiff footings on soft clay; settlement governs for wide footings on compressible soils. Both must satisfy FRA track geometry tolerances (Chapter 6.2). Include both analyses in every bridge foundation submission.
- Apply client-specific dynamic load factors early: DLF differences between a short-line railroad (1.20) and a passenger railroad (1.50) can change the required pile count by 25% or more on an otherwise identical structure. Confirm the DLF with the client's bridge engineering group before finalizing pile layouts.
- Never rely on Meyerhof SPT correlations alone for production pile design: SPT N₆₀ scatter introduces ±30–40% uncertainty in predicted pile capacity. Plan dynamic or static load testing for production foundations. Budget load testing costs into the geotechnical scope from the start.
- Check eccentricity for all abutment footings: Longitudinal braking forces and earth pressure moments routinely push the resultant outside the middle third under service loading. AREMA Chapter 8 requires the middle-third check; failing this check forces redesign (wider footing, deeper embedment, or battered pile pair) that should be identified early.
- Group efficiency governs intermodal yard pile groups: RMG crane rail loads are high, pile groups are tight, and groups in soft clay commonly exhibit block failure governing over individual pile summation. Always check both mechanisms; Document the block failure check.
- Address frost depth in northern designs: In the Northern Plains, Rockies and Prairie provinces, embed footings at least to the local frost depth (often 6–8 ft), with any added margin the owner railroad requires. Frost-heave uplift on pile shafts through frozen soils requires bitumen coating of the pile in the active layer — confirm the owner railroad's requirements.
- Coordinate with the passenger railroad for underpinning: Passenger railroads commonly require that underpinning or deep foundation work near an active track (often within about 25 ft of track centerline; confirm the owner's distance) be reviewed by the railroad's Structures Engineering prior to design finalization. Micropile designs must include a pre-construction structural assessment of the existing footing being underpinned.
Project management · Jacob and Müller (2017)
Estimating Drilled Shafts from a Rig-Day Cost
Weinhold’s chapter on special foundation works prices bored piles from a working-unit day rate. The day rate is the full cost of one rig with its crew, tooling and site containers for one workday, divided by realistic daily production.
The example rig is a cased Kelly rig, rated to 47 in diameter and 59 ft depth, with a 3-person crew on a 10-hour day. Its day rate includes:
- the crew;
- the base machine, rotary drive and Kelly bar, at 70% of register rental rates;
- a support loader and site containers;
- fuel at 70% utilization;
- casing sections, casing shoes, augers, a bucket and a core barrel.
Labor was about 28% of the day rate and the base machine about 40%.
The book’s shafts were 35 in diameter and 26–36 ft long, at a production rate of 164 ft per workday. Converted to US units, the cost per foot of shaft is made up of:
- drilling = day rate ÷ 164 ft (about 60% of the total);
- concrete at 0.242 CY/ft, plus 10% overrun (about 32%);
- disposal of 0.242 CY/ft of cuttings (about 8%).
Reinforcing is a separate per-ton item. The other items are priced separately:
- Mobilization and demobilization: two rig-days, special heavy transport, mileage and fixed costs.
- Pile-top chipping: 1.6 ft of overpour on each of 64 shafts, subcontracted per CY with a disposal charge.
- Obstruction removal: an hourly item at one-tenth of the day rate.
A flat 25% markup for overhead, risk and profit was considered acceptable, because bored piling is routine work for bidders.
The chapter lists the bid conditions that affect price:
- quantities are “for calculation only” and the bidder must verify them;
- the bidder must state reservations about specified methods in writing;
- a site visit is mandatory, and known obstructions are to be itemized;
- unit prices include all ancillary work.
It also notes that load tests on large projects can pay for themselves by allowing pile sizes to be optimized.
For railroad work: For bridge foundations and drilled-shaft retaining walls next to live track, the rig-day framework lets the engineer test how sensitive the cost is to geotechnical findings:
- slower production in cobbles or rock sockets;
- temporary versus permanent casing where groundwater or caving is expected;
- cuttings disposal where railroad spoil handling rules apply;
- standby hours when work stops for train movements.
Production per workday should reflect the track windows actually available. Obstruction and standby items give the railroad unit prices for those risks instead of leaving them to claims.
Source: Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & Sohn, pp. 180–192. Summarized and paraphrased. Full reference under Supplemental References.
Empirical equation note · this section
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
- IS-01 SPT energy & procedure correction N₆₀Use: All soils tested by SPT (ASTM D1586). Normalizes blow count to 60% of theoretical free-fall energy, the basis for most U.S. correlations. Limits: CE ranges ~0.5–1.6 depending on hammer type; use measured energy (ASTM D4633, withdrawn 2025) where available. Rod-length factor ranges differ between Skempton (1986) and Youd et al. (2001).