↑ Parent Menu⌂ Main Menu
← Chapter 6.1 Foundation Engineering: Bearing Capacity
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.1.15 Apps and Analytical Tools 47

Foundation bearing capacity governs the structural adequacy of every load-transfer element in railroad infrastructure — bridge abutments and piers, signal equipment…
Authors: Daniel P. Colwell and Mario Ruel
6.1.15 Apps and Analytical Tools47

The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this part of the analysis, gathered here from across the manual in the November 2026 restructure: 47 tools (20 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).

Apps

Each app runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (1.0.3).

Tools

Deep Foundations
DFAuger Cast Pile Design — ASD (GEC 8)Used in Chapter 6.1, 6.1.5 Deep Foundation Bearing Capacityguide onlyGuide
DFBroms Method — Lateral PileUsed in Chapter 6.1, 6.1.6 Pile Group Efficiencyguide onlyGuide
DFCSL Analysis (Crosshole Sonic Logging)Used in Chapter 5.3, 5.3.4 Pile Installation Monitoringguide onlyGuide
DFDrilled Shaft Design — Soils, LRFD (AASHTO 2018)Used in Chapter 6.1, 6.1.5 Deep Foundation Bearing CapacityCalculator ▸Guide
DFLPILE Lateral p-y MultiplierpreliminaryUsed in Chapter 6.1, 6.1.6 Pile Group EfficiencyCalculator ▸Guide
DFPile Driving with DowndragUsed in Chapter 6.1, 6.1.5 Deep Foundation Bearing CapacityCalculator ▸Guide
DFPile Length — LRFD Modified IDOT/ENR FormulaUsed in Chapter 6.1, 6.1.5 Deep Foundation Bearing CapacityCalculator ▸Guide
DFPile Load Test Calculations (Compression)Used in Chapter 5.3, 5.3.5 Static Axial Load Testing (ASTM D1143)guide onlyGuide
DFPile PDA Field Data ComputationsUsed in Chapter 5.3, 5.3.4 Pile Installation Monitoringguide onlyGuide
DFPipe Pile API AnalysisUsed in Chapter 6.1, 6.1.5 Deep Foundation Bearing CapacityCalculator ▸Guide
DFRock-Socket Drilled Shaft DesignUsed in Chapter 6.1, 6.1.5 Deep Foundation Bearing CapacityCalculator ▸Guide
Data Templates
DTData SpreadsheetUsed in Chapter 8.4, 8.4.8 Calculation Appendixguide onlyGuide
DTData — BridgeUsed in Chapter 8.4, 8.4.8 Calculation Appendixguide onlyGuide
DTData — MSE WallUsed in Chapter 8.4, 8.4.8 Calculation Appendixguide onlyGuide
DTData — TemplateUsed in Appendices A–C, APPENDIX B — LABORATORY TEST RESULTS TABLE TEMPLATEguide onlyGuide
DTSoil DataUsed in Chapter 5.2, Applies to the chapter as a whole; Chapter 8.4, 8.4.5 Laboratory Data Tablesguide onlyGuide
Earth Retaining Structures
ERAnchored Soldier Pile Wallneeds workUsed in Chapter 7.1, 7.1.4 Wall Types and SelectionCalculator ▸Guide
ERGeoGrid Bridge (GGB) v3.0Used in Chapter 7.2, 7.2.8 Geosynthetic Reinforcementguide onlyGuide
ERGeogrid CalculationsUsed in Chapter 7.2, Applies to the chapter as a wholeguide onlyGuide
ERLateral Earth Pressure — Coulomb & RankineUsed in Chapter 7.1, 7.1.2 Lateral Earth Pressure TheoryCalculator ▸Guide
ERLateral Earth Pressure — Rankine Equivalent-Fluid TablesUsed in Chapter 7.1, 7.1.2 Lateral Earth Pressure TheoryCalculator ▸Guide
ERLateral Pressures on StructuresUsed in Chapter 2.1, 2.1.7 Structural Foundations Supporting or Adjacent to the Track; Chapter 7.1, 7.1.3 Surcharge Loading — Cooper E-80 Train LoadCalculator ▸Guide
ERMSE Wall External StabilityUsed in Chapter 7.1, 7.1.4 Wall Types and SelectionCalculator ▸Guide
ERSheet Pile DesignUsed in Chapter 7.1, 7.1.4 Wall Types and SelectionCalculator ▸Guide
ERSoil Nail WallUsed in Chapter 7.1, 7.1.4 Wall Types and Selection; Chapter 7.2, 7.2.8 Geosynthetic Reinforcementguide onlyGuide
ERTrial Wedge MethodUsed in Chapter 7.1, 7.1.2 Lateral Earth Pressure Theoryguide onlyGuide
ERWall Soil Pressures Template for Shoring SuitesUsed in Chapter 7.1, 7.1.4 Wall Types and SelectionCalculator ▸Guide
Field Forms & Logs
FFBoring Data Summary SheetUsed in Appendices A–C, APPENDIX A — BOREHOLE LOG TEMPLATE; Chapter 4.1, 4.1.7 Annotated Sample Boring Logguide onlyGuide
FFDaily Log — Compaction Testing (Nuclear Gauge)Used in Chapter 5.3, 5.3.2 Compaction Testingguide onlyGuide
FFDaily Log — GeneralUsed in Chapter 4.1, 4.1.2 Drilling Method Selectionguide onlyGuide
FFDynamic Cone Field LogUsed in Chapter 5.1, 5.1.2 Cone Penetration Test (CPT and CPTu); Chapter 5.3, 5.3.2 Compaction TestingCalculator ▸Guide
FFNuclear Density — SoilUsed in Chapter 5.3, 5.3.2 Compaction Testingguide onlyGuide
FFOne Call FormUsed in Chapter 4.1, 4.1.2 Drilling Method Selectionguide onlyGuide
FFOne Call Utility ChecklistUsed in Chapter 3.9, 3.9.4 Boring Location Planning — Criteria by Project Typeguide onlyGuide
FFRR Boring Info (blank)Used in Appendices A–C, APPENDIX A — BOREHOLE LOG TEMPLATE; Chapter 4.1, 4.1.7 Annotated Sample Boring Logguide onlyGuide
FFRock Core Log & RQDUsed in Chapter 4.1, 4.1.5 Rock Core Recovery and RQDguide onlyGuide
Project Management & Checklists
PMCalculation Sheet (blank)Used in Appendices A–C, APPENDIX C — GEOTECHNICAL SPECIAL PROVISIONS (GSP) TEMPLATE; Chapter 8.4, 8.4.8 Calculation Appendixguide onlyGuide
PMRR Bridge Site Recon ChecklistUsed in Chapter 1.1, 1.1.10 Grade & Slope Stabilization Program — Roles and Processguide onlyGuide
PMRR Summary of FindingsUsed in Chapter 1.1, 1.1.12 Practical Recommendations; Chapter 8.4, 8.4.3 Report Structure — Required Sectionsguide onlyGuide
Shallow Foundations
SFBearing Capacity — AASHTO LRFDUsed in Chapter 6.1, 6.1.2 Shallow Foundation Bearing Capacity — Vesić General EquationCalculator ▸Guide
SFBearing Capacity — Terzaghi & VesićUsed in Chapter 6.1, 6.1.2 Shallow Foundation Bearing Capacity — Vesić General EquationCalculator ▸Guide
SFFooting on SlopeUsed in Chapter 6.1, 6.1.2 Shallow Foundation Bearing Capacity — Vesić General EquationCalculator ▸Guide
SFMachine Foundation Design & Dynamic Soil PropertiesUsed in Chapter 6.1, 6.1.2 Shallow Foundation Bearing Capacity — Vesić General EquationCalculator ▸Guide
SFRock — Shallow FoundationsUsed in Chapter 6.1, 6.1.2 Shallow Foundation Bearing Capacity — Vesić General EquationCalculator ▸Guide
Soil & Rock Properties
SPCPT–SPT CorrelationUsed in Chapter 5.1, 5.1.2 Cone Penetration Test (CPT and CPTu)guide onlyGuide
SPDynamic Cone PenetrometerUsed in Chapter 2.3, 2.3.6 Track Modulus; Chapter 5.1, 5.1.2 Cone Penetration Test (CPT and CPTu)Calculator ▸Guide
SPVane ShearUsed in Chapter 5.1, 5.1.3 Vane Shear Test (VST)guide onlyGuide

Calculator: Shallow Foundation Bearing Capacity (Section 6.1.2.6)

Calculator: Elastic Settlement of Footings (Section 6.2.3.1)

← Previous · 5.0 Testing Chapter 5.5 — The Observational Method and Trigger-Action Response Plans
Next · 6.0 Analysis → Chapter 6.2 — Settlement Analysis