Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.2.10 Representative Data Table

Ground improvement is a fundamental tool in the railroad geotechnical consultant's toolkit, employed when in-situ subgrade conditions cannot support track, structure, or…
Authors: Daniel P. Colwell and Mario Ruel
7.2.10 Representative Data Table
Table 7.2-4: Ground Improvement Performance Summary — Multi-Client Railroad Projects
ProjectRailroadSoft SoilMethodSpacing/GridImprovement FactorPre-Treat S_c (in.)Post-Treat S_c (in.)Performance Met?
Coastal GA EmbankmentClass ICH clay, 35 ftPVDs @ 1.5-ft tri1.5 ftU_total = 90%N/A (time)120 daysYes
Port Arthur YardClass ICH clay, 18 ftStone col., 36 in.@5 ftSquare 5 ftn₀ = 3.218.65.8Yes
Moose Jaw RoadClass ICH clay, PI=467% lime, 12-in. depthN/API: 46→11N/API=11Yes
Winnipeg TerminalClass IVarved clay, 25 ftDSM col., 24-in.@5 ftHex 5 ftn₀ = 2.814.25.1Yes
Willamette BridgeClass ILoose sand, liq.DSM panels + cols3 ft gridFS_L: 0.67→1.35——Yes
Passenger corridor EmbankmentPassengerSoft clay, 20 ftPVDs @ 1.25-ft tri1.25 ftU_total = 95%—75 daysYes
Atlanta Yard CLClass ICL clay, PI=225% lime, 12-in. depthN/API: 22→10N/API=10Yes