This section collects findings from the proceedings of a United States–China workshop on ground improvement technologies (ASCE Geotechnical Special Publication 188, 2009) that add to the methods in this chapter. Thirty-three papers cover column-supported embankments, column technologies, deep mixing, jet grouting, accelerated consolidation and new materials. The findings that change how a method is designed, specified or checked are placed in orange supplemental boxes in the sections they apply to; this section summarizes them, adds the remaining items, and lists every paper used.
Most of the field cases are highway, building and dam projects. They transfer to railroad work with one important difference: track loading is repeated, and track tolerates much less differential movement than a pavement does. Treat the findings on repeated loading, differential settlement and transitions as the most important for railroad use.
7.2.18.1 Summary of findings and where they apply
Table 7.2-18. Workshop findings for railroad ground improvement (English units)| Topic | Finding | Railroad use | Section |
|---|
| Column-supported embankments | Arching is complete when fill height is at least 1.1–1.5 × clear cap spacing; Nordic guideline best matched field data; floating columns leave 50–60% of settlement below the tips | Approach fills, new track on soft ground | 7.2.8 |
| Column-supported embankments under repeated load | Geogrid cut permanent deformation about 25%; geogrid tension keeps growing with cycles | Any column-supported track | 7.2.8 |
| Columns under side slopes | Unreinforced columns in the shear zone fail in bending; full shear credit overstates stability | Widenings, approach fills | 7.2.8, Ch. 6.3 |
| Geosynthetic over caps | Round caps and diagonal strand orientation lower peak strain | Load transfer platforms | 7.2.8.3 |
| Stone columns in silty sand | Add wick drains; gains fall from ~114% to ~70% as fines rise 30% to 43%; little effect at ≥15% clay-size | Liquefaction under approaches | 7.2.4, Ch. 6.5 |
| Acceptance by shear wave velocity | Velocity target from earthquake magnitude, converted to void ratio and column spacing | Corridor-length liquefaction treatment | 7.2.4, Ch. 5.1 |
| Deep soil mixing in expansive clay | 25:75 lime:cement, about 337 lb/yd³, water-to-binder 1.0; reduced swell and shrink over two years | Turnouts, crossings, approaches on expansive clay | 7.2.5 |
| Deep-mixing uniformity | Core resistivity measures mixing; double-slurry mixing more uniform | Deep-mixing QA | 7.2.5 |
| Composite columns | Concrete or steel core in a soil-cement column; capacity can exceed a bored pile of the same size | High fills, approach embankments | 7.2.5 |
| Inclined compaction grouting | Heave grows with inclination; little change beyond ~70°; depth beyond ~5 diameters adds little at 10–30° | Grouting under track from the shoulder | 7.2.6 |
| Large-diameter jet grouting | Columns 2.6–10.8 ft; poor mixing in sand below water; small columns in stiff clay | Excavation support and cutoffs beside track | 7.2.6 |
| Vacuum preloading | No stability risk during loading; settlement >3 ft and vane strength doubled in case study | Yards and embankments on very soft clay | 7.2.3 |
| Staged construction of tall fills | PVDs cut stage time from ~15 to ~2 years; transitions to abutments need most care | Tall fills, bridge approaches | 7.2.3, Ch. 6.2 |
| Dynamic compaction of dumped fill | Improved rock-and-soil fill to ≥20 ft; bearing above 9,000 psf; depth confirmed by GPR | Old end-dumped fills on mountain grades | 7.2.2 |
| Explosive replacement | Blast-driven replacement of soft clay with stone; dense in top 16–20 ft | Remote new alignments only | 7.2.2 |
| Lime sludge; organosilane; alkaline slag | Sludge acts like lime (use strength, not pH, to set content); organosilane cut erosion ~50×; slag usable as fill | Fill treatment, slope erosion control, yard fill | 7.2.7 |
| Geogrid pullout | Bearing on transverse ribs is the main resistance | Platforms and walls | 7.2.8, Ch. 7.1 |
7.2.18.2 Other findings
- Reliability-based column coverage. Zheng, Liu and Xu (2009) set the area replacement ratio of multi-column treatments from the spatial variability of the soil, using a target reliability index of 3.0. This is a way to choose column spacing where the soil is variable along an alignment.
- Simplifying 3D models. Huang and Han (2009) compared ways of converting a three-dimensional column-supported embankment into a plane-strain model. Converting the geometry represented a field-instrumented bridge approach on deep-mixed columns better than converting the material properties.
- Composite ground in earthquakes. Song and Wu (2009) found that the cushion between rigid piles and the foundation lowers pile forces in earthquakes compared with a conventional pile foundation; the risk of pile damage is at interfaces between soil layers of very different stiffness.
- Composite ground under flexible loads. Yu, Gong, Liu, Lv and Jing (2009) give closed-form settlement and pile-to-soil stress ratio for a flexible load (such as an embankment) over a cushion and composite ground, considering interaction among all four components.
- Trench remixing deep (TRD) walls. Evans and Garbin (2009) describe in-place soil mixing of a continuous wall with a slag–cement slurry, used in the United States for cutoff walls including a large lake levee. Cores and borehole camera records showed a more uniform, continuous wall than other methods. Relevant where a railroad embankment also serves as a levee or must cut off seepage.
- Bio-cementation (MICP). Martinez and DeJong (2009) found that microbially induced calcite forms mainly at grain contacts and reduced footing settlement up to five-fold in model tests, but the cemented sand was brittle and uniform treatment at field scale was unresolved. See the bio-treatment sheet in Section 7.2.16.
- Post-grouting of bored piles. Xiao, Wu and Wu (2009) report base and side post-grouting of more than 18,000 slurry-drilled piles at one airport terminal, with 72 static load tests showing large gains in capacity and settlement performance, especially in sand. This belongs with deep foundation design; see Chapter 6.1, Section 6.1.5.
- SHRP2 R02 technology catalog. Schaefer, Filz and Vanzler (2009) report the first phase of the SHRP2 R02 project, which identified 47 ground improvement technologies and the technical and non-technical obstacles to their use. The technology sheets in Section 7.2.16 are built from that program’s products.
7.2.18.3 How to use these findings
- Design. For column-supported track, check arching height, column bending under side slopes and reinforcement tension growth under repeated load, in addition to the static design procedure in the Section 7.2.16 sheet.
- Specification. Require trial columns or test sections in each soil type for jet grouting, deep mixing and stone columns, because diameter, uniformity and improvement vary strongly with soil.
- Acceptance. Add a uniformity check for deep mixing, consider shear wave velocity targets for liquefaction treatment, and allow time for strength gain before acceptance testing.
- Track protection. Estimate heave before grouting under track and settlement before preloading beside it, and set geometry limits and monitoring frequency for the work (Chapter 5.3).
- Risk rating. Record which of these measures are part of the design and construction when assigning the risk reduction ratings in Chapter 3.8.
7.2.18.4 Sources
Papers in Han, J., Zheng, G., Schaefer, V. R. and Huang, M. (eds.) (2009), Advances in Ground Improvement: Research to Practice in the United States and China, ASCE Geotechnical Special Publication 188, Reston, VA. Summaries are paraphrased and values converted to English units.
- Schaefer, V. R., Filz, G. M. and Vanzler, L. S. (2009). “SHRP2 R02 Phase 1 — Geotechnical Solutions for Soil Improvement, Rapid Embankment Construction, and Stabilization of the Pavement Working Platform.” GSP 188, 1–11.Find source ↗
- Zheng, G., Liu, S. and Chen, R. (2009). “State of Advancement of Column-Type Reinforcement Element and Its Application in China.” GSP 188, 12–25.Find source ↗
- Chen, R. P., Chen, Y. M., Wang, S. H. and Xu, Z. Z. (2009). “Theoretical Study and Field Tests on Pile-Supported Embankments over Soft Ground.” GSP 188, 26–35.Find source ↗
- Huang, J. and Han, J. (2009). “Approaches for 2D Coupled Modeling of Column-Supported Embankments.” GSP 188, 36–45.Find source ↗
- Huang, M. and Li, B. (2009). “Numerical Analysis of Pile-Supported Earth Platforms with Non-Uniform Piles.” GSP 188, 46–54.Find source ↗
- Filz, G. M. and Plaut, R. H. (2009). “Practical Implications of Numerical Analyses of Geosynthetic Reinforcement in Column-Supported Embankments.” GSP 188, 55–62.Find source ↗
- Zheng, G. and Liu, L. (2009). “Numerical Analysis of the Pile Lateral Behavior and Anti-Slip Mechanism of Rigid Pile Supported Embankments.” GSP 188, 63–72.Find source ↗
- Han, J. and Bhandari, A. (2009). “Evaluation of Geogrid-Reinforced Pile-Supported Embankments under Cyclic Loading Using Discrete Element Method.” GSP 188, 73–82.Find source ↗
- Zheng, J. J., Liu, Y. and Xu, Z. J. (2009). “Reliability-Based Design Applied to Multi-Column Composite Foundations.” GSP 188, 83–91.Find source ↗
- Yu, J. L., Gong, X. N., Liu, C., Lv, W. Z. and Jing, Z. J. (2009). “Working Behavior of Composite Ground under Flexible Foundations Based on Super-Substructure Interaction.” GSP 188, 92–101.Find source ↗
- Liu, K., Xie, X., Shi, S. and Zhu, X. (2009). “Numerical Analysis on the Performance of a Cushioned Foundation with a Mixture of Both Rigid and Flexible Piles.” GSP 188, 102–111.Find source ↗
- Miao, L., Wang, F., Zhang, Y. and Zhang, C. (2009). “Experimental Study on Controlled Modulus Column Methods.” GSP 188, 112–119.Find source ↗
- Liu, H., Chen, Y. and Liu, J. (2009). “Construction of a Large Diameter Cast-in-Situ Concrete Pipe Pile for Ground Improvement.” GSP 188, 120–129.Find source ↗
- Madhyannapu, R. S., Puppala, A. J., Bhadriraju, V. and Nazarian, S. (2009). “Deep Soil Mixing (DSM) Treatment of Expansive Soils.” GSP 188, 130–139.Find source ↗
- Liu, S., Zhang, D. and Zhu, Z. (2009). “On the Uniformity of Deep Mixed Soil-Cement Columns with Electrical Resistivity Method.” GSP 188, 140–149.Find source ↗
- Zhou, Y. G., Chen, Y. M. and Chen, R. P. (2009). “Evaluation of Ground Improvement for Liquefiable Deposits Using Shear Wave Velocity.” GSP 188, 150–159.Find source ↗
- Rollins, K. M., Quimby, M., Johnson, S. R. and Price, B. (2009). “Effectiveness of Stone Columns for Liquefaction Mitigation of Silty Sands with and without Wick Drains.” GSP 188, 160–169.Find source ↗
- Shen, S. L., Luo, C. Y., Xiao, X. C. and Wang, J. L. (2009). “Improvement Efficacy of RJP Method in Shanghai Soft Deposit.” GSP 188, 170–178.Find source ↗
- Wang, J. L., Wang, D. F. and Wang, J. W. (2009). “State of Jet Grouting in Shanghai.” GSP 188, 179–188.Find source ↗
- Song, E. and Wu, S. (2009). “Seismic Analysis of Rigid Pile Composite Ground.” GSP 188, 189–197.Find source ↗
- Xiao, D., Wu, C. and Wu, C. (2009). “Bored Pile Post-Grouting Technology and Its Engineering Application.” GSP 188, 198–206.Find source ↗
- Shao, L. (2009). “Soil Improvement to Support a Warehouse Building over Difficult Soils.” GSP 188, 207–216.Find source ↗
- Daniels, J. L. and Hourani, M. S. (2009). “Soil Improvement with Organo-Silane.” GSP 188, 217–224.Find source ↗
- Li, X., Tian, X., Zhao, Z. and Wang, X. (2009). “Study for Engineering Utilization of Slag Soil in Tianjin Alkaline Factory.” GSP 188, 225–233.Find source ↗
- Basu, P., Madhav, M. R. and Prezzi, M. (2009). “Estimation of Heave Due to Inclined Compaction Grouting.” GSP 188, 234–241.Find source ↗
- Martinez, B. C. and DeJong, J. T. (2009). “Bio-Mediated Soil Improvement: Load Transfer Mechanisms at the Micro- and Macro-Scales.” GSP 188, 242–251.Find source ↗
- Liao, X., Ye, G. and Xu, C. (2009). “Friction and Passive Resistance of Geogrid in Pullout Tests.” GSP 188, 252–259.Find source ↗
- Yu, X., Zhang, B., Lang, J. and Yu, X. (2009). “Sustainability through Beneficial Use of Lime Sludge for Construction.” GSP 188, 260–270.Find source ↗
- Evans, J. C. and Garbin, E. J. (2009). “The TRD Method for In Situ Mixed Vertical Barriers.” GSP 188, 271–280.Find source ↗
- Lu, X., Filz, G. and Han, J. (2009). “Dynamic Compaction of Fill in a Mountainous Area.” GSP 188, 281–289.Find source ↗
- Yan, S., Dong, W. and Chu, J. (2009). “Use of Explosion in Improving Highway Foundation.” GSP 188, 290–297.Find source ↗
- Edil, T. B. and Berilgen, M. M. (2009). “Construction of Earth Dams on Soft Ground: Principles and Examples.” GSP 188, 298–307.Find source ↗
- Yan, S., Feng, X. and Chu, J. (2009). “Mechanism of Using Vacuum Preloading Method in Improving Soft Clay Layers.” GSP 188, 308–318.Find source ↗