↑ Parent Menu⌂ Main Menu
← Chapter 7.2 Ground Improvement Methods
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.2.14 Practice Questions

Ground improvement is a fundamental tool in the railroad geotechnical consultant's toolkit, employed when in-situ subgrade conditions cannot support track, structure, or…
Authors: Daniel P. Colwell and Mario Ruel
7.2.14 Practice Questions
Each question is worked in the same five parts as the examples.
Question 7.2-1: Radial Consolidation at 90 Days

Problem Statement

A railroad bridge approach embankment is to be built over 40 ft of soft clay, and wick drains are planned at the spacing shown to speed consolidation. The railroad wants to lay track 90 days after the fill is placed. The engineer must compute the degree of radial consolidation at 90 days and comment on the drain spacing.

Plan: triangular patterns = 1.5 ftde = 1.575 ftUr at 90 days = ?40 ft soft clay, bridge approachGivench = 0.015 ft²/days = 1.5 ft triangular; de = 1.575 ftdw = 0.196 ftt = 90 daysRequiredUr after 90 daysComment on spacingBlack = given; red = required
Given and required for Question 7.2-1.

Given

VariableValueDescription
ch0.015 ft²/day
s1.5 ft triangular; de = 1.575 ft
dw0.196 ft
t90 days

Required

  • Ur after 90 days

Equations

  1. Eq. 1: μ = ln(de/dw) − 0.75 — drain geometry term, no smear or well resistance; de = 1.05s (triangular)
  2. Eq. 2: Ur = 1 − exp(−8Tr/μ); Tr = cht/de² — Barron and Hansbo radial consolidation

Steps

Step 1 · μ (Eq. 1)
ln 8.035 − 0.75
1.334
↓
Step 2 · Tr
0.015 × 90 / 2.481
0.544
↓
Step 3 · Ur (Eq. 2)
1 − exp(−8 × 0.544/1.334) = 1 − e−3.26
96%
↓
Step 4 · Can the spacing open up?
s = 1.7 ft: de = 1.785, μ = 1.459, Tr = 0.424
About 90%, with 22% fewer drains
↓
Solution
Ur = 96%; 1.7-ft spacing would still reach 90%.

Solution

Ur ≈ 96% at 90 days.

The 1.5-ft spacing is more than needed: 1.7 ft gives about 90% with 22% fewer drains (1.75 ft gives only 88%). Check with smear before opening the spacing.

Question 7.2-2: Stone Column Spacing for a 6-in. Target

Problem Statement

A new railroad yard embankment is predicted to settle 15 in. on untreated soft ground, but the railroad wants no more than 6 in. Stone columns of the diameter and friction angle shown are proposed at a trial square spacing of 6.0 ft. The engineer must find the improvement factor and settlement and adjust the spacing to meet the target.

The method of Example 7.2-2.

Yard embankment, untreated S = 15 in.30-in. columns, 6.0 ft square trials = ?as, n0, improved S = ?Given30-in. columns (Ac = 4.909 ft²)Trial 6.0 ft squareφ′c = 40°Sc untreated = 15 in.Target 6 in.Requiredas and n0 Improved settlementSpacing for the targetBlack = given; red = required
Given and required for Question 7.2-2.

Given

VariableValueDescription
Columns30 in. diameter (Ac = 4.909 ft²)
Trial spacing6.0 ft square
φ′c40°
Sc15 in.Untreated
Target6 in.

Required

  • as, n0 and improved settlement

Equations

  1. Eq. 3: n0 = 1 + as[(5 − as)/(4Kac(1 − as)) − 1]; as = Ac/A; Kac = tan²(45° − φ′c/2) — Priebe (1995), ν = 1/3
  2. Eq. 4: S = Sc/n0

Steps

Step 1 · 6.0 ft
as = 4.909/36 = 0.136
n0 = 1.75; S = 8.6 in.
↓
Step 2 · 5.0 ft
as = 0.196
n0 = 2.15; S = 7.0 in.
↓
Step 3 · 4.5 ft
as = 0.242
n0 = 2.51; S = 6.0 in.
↓
Solution
30-in. columns at 4.5-ft square spacing.

Solution

At 6.0 ft the settlement is about 8.6 in.; 30-in. columns at 4.5-ft square spacing bring it to 6.0 in.

The improvement factor depends almost entirely on the area ratio, so spacing is the main design lever; larger columns at the same spacing do the same job.

Question 7.2-3: Lime Content and Sulfate Screening

Problem Statement

A railroad yard lead is to be built on a fat clay subgrade with the plasticity index shown, and lime treatment is proposed to bring the PI down to 12. A soil test found 1,200 ppm sulfate. The engineer must estimate the lime content and decide whether the sulfate level is a concern for heave.

The method of Example 7.2-3.

Yard leadLime-treated layerFat clay (CH) subgradeLime content = ? Sulfate a concern?GivenPI = 52 (CH)Target PI = 12Sulfate 1,200 ppmRequiredLime contentIs sulfate a heave concern?Black = given; red = required
Given and required for Question 7.2-3.

Given

VariableValueDescription
PI52CH clay
Target PI12
Sulfate1,200 ppm

Required

  • Lime content
  • Whether sulfate is a concern

Equations

  1. Eq. 1: Lp = (PIi − PIf)/5

Steps

Step 1 · Lime
(52 − 12)/5
8.0%
↓
Step 2 · Sulfate
1,200 < about 3,000 ppm (NLA)
Acceptable, with lot testing
↓
Solution
8% lime; sulfate acceptable but test each lot.

Solution

About 8.0% hydrated lime (ASTM C977). Sulfate at 1,200 ppm is acceptable.

Retest each lot of about 500 yd³ during construction; sulfate varies within a deposit. If any sample exceeds about 3,000 ppm, review the treatment; cement is subject to sulfate heave too.

Question 7.2-4: Compaction Acceptance of CL Fill

Problem Statement

A lean clay fill is being placed for a new railroad embankment. A field density test on the latest lift gave the density and moisture shown, and the railroad’s specification requires 95% of Modified Proctor within 2% of optimum moisture. The inspector must decide whether the lift is accepted.

1216202495100105Water content w (%)γd (pcf)105 pcf at 16%field 99.5 at 18%Accept the lift?Givenγd,max = 105 pcf; wopt = 16%γd,field = 99.5 pcf; w = 18%Spec: 95%; w ±2%RequiredAcceptance (density and moisture)Black = given; red = required
Given and required for Question 7.2-4.

Given

VariableValueDescription
γd,max, wopt105 pcf; 16%
γd,field, w99.5 pcf; 18%
Spec95% Modified Proctor; w within ±2% of optimum

Required

  • Acceptance

Equations

  1. Eq. 1: RC = γd/γd,max

Steps

Step 1 · RC
99.5/105
94.8% < 95%: fails
↓
Step 2 · Moisture
18% = wopt + 2%
At the wet limit
↓
Solution
Not acceptable: RC 94.8%, at the wet limit.

Solution

Not acceptable: RC = 94.8%, below 95%, and the moisture is at the wet limit.

Scarify, dry back toward optimum, recompact and retest. Wet-side CL loses strength and settles more, so dry-back is usually more effective than extra passes.

Question 7.2-5: Laboratory Target and Composite Modulus for DSM

Problem Statement

Deep soil mixing is proposed under a new high-speed passenger track built over soft clay, with the field strength, area replacement ratio and moduli shown. The engineer must set the laboratory strength the mix design must reach and estimate the composite modulus and the reduction in track settlement.

High-speed passenger trackSoft clay, Esoil = 500 psiDSM columns, aDSM = 0.25, qu,field = 75 psiflab target = ? Ecomp = ? Settlement reduction?Givenqu,field = 75 psiflab = 0.25 (field/lab)aDSM = 0.25Esoil = 500 psiEDSM = 300 qu,field RequiredLaboratory design strengthComposite modulusSettlement reductionBlack = given; red = required
Given and required for Question 7.2-5.

Given

VariableValueDescription
qu,field75 psiTarget
flab0.25Field-to-laboratory strength ratio
aDSM0.25Area replacement ratio
Esoil500 psiSoft clay
EDSM300 qu,fieldMidpoint of 150 to 500

Required

  • Laboratory design strength
  • Composite modulus and settlement reduction

Equations

  1. Eq. 1: qu,lab = qu,field/flab
  2. Eq. 2: Ecomp = a EDSM + (1 − a)Esoil

Steps

Step 1 · qu,lab
75/0.25
300 psi
↓
Step 2 · EDSM
300 × 75
22,500 psi
↓
Step 3 · Ecomp
0.25 × 22,500 + 0.75 × 500 = 5,625 + 375
6,000 psi: 12 times the soil
↓
Solution
Lab target 300 psi; composite modulus 6,000 psi (12×).

Solution

Specify 300 psi in the laboratory; the composite modulus is about 6,000 psi, twelve times the untreated clay.

A 3-in. untreated settlement would fall to about 0.25 in., within the 0.375-in. Class 7 limit (Table 6.2-1). Verify the field-to-laboratory ratio with wet-grab or core samples early in production; it is the least certain number here.

Question 7.2-6: Freezing for a Jacked Culvert Under Two Tracks

Problem Statement

A Class I railroad located in Ohio needs a box culvert jacked under two main tracks through saturated silty sand below the water table. Dewatering is ruled out because it would settle the track, so the contractor proposes freezing a block of ground around the culvert path with liquid nitrogen for a six-week drive. The railroad’s engineer must estimate the frozen volume, the heat to be removed, the nitrogen needed, and the possible heave of the track (Section 7.2.19).

Two main tracks Saturated silty sand below the water table; γd = 105 pcf, w = 0.20 Water table Frozen block Culvert 20 ft 14 ft Length 60 ft(into page) Required: heave potential GivenLN2: 1,350 lb/yd³initial; same againper 2–3 weeksDrive: 6 weeks RequiredVolume, latentheat, LN2, heave
Figure 7.2-26. Question 7.2-6: frozen block under two tracks.

Given

VariableValueDescription
Frozen block20 ft wide × 14 ft high × 60 ft longAround the culvert path, below both tracks
γd, w105 pcf and 0.20Saturated silty sand
LN2 use1,350 lb/yd³ initial; the same quantity again every 2 to 3 weeksPreliminary values (Table 7.2-20)
Duration6 weeksJacking period after initial freeze
Expansion9%Water to ice by volume

Required

  • (a) Frozen volume
  • (b) Latent heat to remove
  • (c) Liquid nitrogen for the initial freeze and the six-week drive
  • (d) Upper-bound heave if the pore water expansion all went upward

Equations

  1. Eq. 7.2-1: L = 144 γd w Btu/ft³
  2. Eq. 1: Vw/V = γd w / 62.4 — pore water per unit volume
  3. Eq. 2: Δh = 0.09 (Vw/V) × thickness

Steps

Step 1 · (a) Volume
20 × 14 × 60 = 16,800 ft³; / 27
V = 16,800 ft³ = 622 yd³
↓
Step 2 · (b) Latent heat
144 × 105 × 0.20 = 3,024 Btu/ft³; × 16,800
About 51 million Btu
Spot check: Sensible heat to cool the soil well below 32°F comes on top of this.
↓
Step 3 · (c) Nitrogen
Initial 622 × 1,350 = 840,000 lb; six weeks needs 2 to 3 more quantities: 1.68 to 2.52 million lb
Total about 2.5 to 3.4 million lb (1,260 to 1,680 tons)
↓
Step 4 · (d) Heave
Vw/V = 105 × 0.20/62.4 = 0.337; 0.09 × 0.337 = 0.030; × 14 ft
Up to about 0.42 ft (5 in.)
Spot check: Water migrating to ice lenses can add more in silty soil; confinement and lateral expansion can reduce it. Five inches is a first estimate, not a bound.
↓
Solution
622 yd³; about 51 million Btu; 2.5 to 3.4 million lb of nitrogen; up to about 5 in. of heave.

Solution

(a) About 622 yd³. (b) About 51 million Btu of latent heat. (c) About 840,000 lb initially and 2.5 to 3.4 million lb in total. (d) Up to about 5 in. of heave, possibly more in silt.

Several inches of heave under two main tracks is not acceptable without control. Ask the contractor to keep the frozen zone below the track structure, freeze in stages, monitor track geometry continuously with action levels and slow orders, and plan for thaw settlement afterward. The nitrogen quantity, roughly 60 to 80 tanker loads, shows why brine freezing is usually cheaper for jobs lasting several weeks, with nitrogen kept for fast freezing or emergencies. These quantities are preliminary; the freezing contractor designs the system.

← Previous · 7.0 Design Chapter 7.1 — Retaining Structures
Next · 7.0 Design → Chapter 7.3 — Pavement Subgrade Evaluation