7.2.16 Ground Improvement Technology Library

Ground improvement is a fundamental tool in the railroad geotechnical consultant's toolkit, employed when in-situ subgrade conditions cannot support track, structure, or…
Authors: Daniel P. Colwell and Mario Ruel
7.2.16 Ground Improvement Technology Library

Sections 7.2.2 through 7.2.8 describe how each family of ground improvement works and how it is designed for railway loading. This library carries the supporting technology sheets: 45 techniques, numbered 7.2.16.1–7.2.16.45 in alphabetical order and grouped below by category. Each sheet opens with a how-it-works schematic and key figures, followed by its fact sheet, design guidance, QC/QA, specifications, cost information and case histories. Use the Previous / Next buttons at the bottom of each sheet to step through the library in order.

Diagram of the bio-treatment process, linking biogeochemistry, soil habitat, mechanical properties, and field application
Photo 7.2.16-1. Overview of bio-treatment soil improvement systems, showing how biogeochemistry (the chemical reaction network and biological system) and soil habitat interact to alter mechanical properties, with process monitoring guiding up-scaling toward field application. (Adapted from DeJong et al. 2011.)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Cross-section of a levee illustrating possible bio-treatment applications, including bio-reinforcement of erosion, bio-mineralization of slopes and carbon, bio-
Photo 7.2.16-2. Overview of possible bio-treatment soil improvement systems applied to a levee cross-section — including bio-reinforcement to prevent erosion, bio-mineralization to stabilize slopes and immobilize carbon, bio-film to prevent groundwater seepage, and bio-dechlorination of contaminants. (Jason DeJong, personal communication, 2012.)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Light microscope comparison of untreated sand grains and sand grains treated with iron-based biocement
Photo 7.2.16-3. Light microscope photos of (a) untreated sand and (b) sand treated with an iron-based biocement. (Chu et al. 2011; with permission from ASCE.)Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Ground Improvement Techniques
Ground Improvement Techniques

The sheets most relevant to each method are also linked at the end of Sections 7.2.2–7.2.8. Soil nailing, MSE walls and deep foundation sheets support Chapter 7.1 — Retaining Structures and Chapter 6.1 — Bearing Capacity.

Section 7.2.16 · Selection guide

Choosing a technology for a railway problem

Find the problem on the cross-section, read the section that explains the method, then open the technology sheets to compare options.

8Railway problems
35Technology sheets
Railway cross-section showing where each of the eight ground problems occurs Soft clayLoose sandBedrock Cut slopeStockpileEmbankment fill 1234 5678
1Locate the problem on the section
2Read the method in the chapter
3Compare the technology sheets
1
Soft clay under embankment

Soft, compressible clay under new or widened embankment

Drain, preload or support on columns

Click a number on the cross-section to jump to its card. Some technologies, such as aggregate columns, jet grouting, and excavation and replacement, serve more than one problem. Technology sheets open on dirtbert.com.

Open the selection guide on its own page (for printing) →

Full table: choosing a technology for a railway problem

Railway problemWhere the method is discussedTechnology sheets
Soft, compressible clay under new or widened embankment17.3 PVDs / preloading; 17.4–17.5 columns7.2.16.36 Prefabricated Vertical Drains and Fill Preloading
7.2.16.43 Vacuum Preloading with and without Prefabricated Vertical Drains
7.2.16.8 Column-Supported Embankments
7.2.16.9 Combined Soil Stabilization with Vertical Columns
7.2.16.13 Deep Mixing Methods
7.2.16.26 Geotextile Encased Columns
Loose sand or silty sand — settlement or liquefaction17.2 densification; 17.4 stone columns7.2.16.45 Vibrocompaction
7.2.16.12 Deep Dynamic Compaction
7.2.16.37 Rapid Impact Compaction
7.2.16.4 Blasting Densification
7.2.16.1 Aggregate Columns
7.2.16.38 Sand Compaction Piles
Weak or pumping subgrade under track, yard or access road17.7 stabilization; 17.8 geosynthetics7.2.16.7 Chemical Stabilization of Subgrades and Bases
7.2.16.31 Mechanical Stabilization of Subgrades and Bases
7.2.16.2 Bio-Treatment for Subgrade Stabilization
7.2.16.16 Excavation and Replacement
7.2.16.21 Geosynthetic Reinforced Embankments
7.2.16.23 Geosynthetic Separation in Pavement Systems
Voids, sinkholes, abandoned mines or culvert backfill loss17.6 grouting7.2.16.10 Compaction Grouting
7.2.16.5 Bulk-Infill Grouting
7.2.16.6 Chemical Grouting & Injection Systems
7.2.16.30 Jet Grouting
Cut slope or embankment slope instabilityCh 6.3 slope stability; Ch 7.1 retaining structures7.2.16.14 Drilled-Grouted and Hollow Bar Soil Nailing
7.2.16.39 Screw-in Soil Nailing
7.2.16.40 Shoot-in Soil Nailing
7.2.16.32 Mechanically Stabilized Earth Wall System
7.2.16.41 Shored Mechanically Stabilized Earth Wall System
7.2.16.1 Aggregate Columns
Foundations near live track / limited headroomCh 6.1 bearing capacity7.2.16.33 Micropiles
7.2.16.27 Helical Pile
7.2.16.11 Continuous Flight Auger Piles
7.2.16.30 Jet Grouting
Compaction QA and fill acceptance17.2 compaction; Ch 5.3 monitoring7.2.16.29 Intelligent Compaction
7.2.16.42 Traditional Compaction
7.2.16.28 High-Energy Impact Rollers
Reuse of on-site or recycled materials17.7 stabilization7.2.16.3 Beneficial Reuse of Waste Materials
7.2.16.34 Onsite Use of Recycled Pavement Materials
7.2.16.16 Excavation and Replacement
Geosynthetic grids for foundation reinforcement and slope stabilization
Geosynthetic grids for foundation reinforcement and slope stabilization

Vertical Columns & Deep Mixing (7)

Subgrade & Base Stabilization (3)

Materials Reuse & Recycling (3)

Densification & Compaction (7)

Grouting & Injection (4)

Piles & Deep Foundations (3)

Soil Nailing & Retaining Structures (5)

Preloading, Drainage & Dewatering (3)

Geosynthetics & Pavement Systems (10)

Technology sheets compiled from FHWA, SHRP2 GeoTechTools and manufacturer literature; each sheet lists its own sources.