7.2.0 Executive Summary

Ground improvement is a fundamental tool in the railroad geotechnical consultant's toolkit, employed when in-situ subgrade conditions cannot support track, structure, or…
Authors: Daniel P. Colwell and Mario Ruel
7.2.0 Executive Summary

Ground improvement is a fundamental tool in the railroad geotechnical consultant's toolkit, employed when in-situ subgrade conditions cannot support track, structure, or facility loads without unacceptable settlement, slope instability, or bearing capacity failure. Railroad projects present a concentrated set of ground improvement challenges: soft coastal and alluvial clays crossed by Class I railroad mainlines, expansive Prairie clays along Class I railroad corridors, loose liquefiable sands requiring treatment for Class I railroad facilities, and organic deposits that underlie historic rail alignments across multiple clients.

This chapter presents methods for: (1) densification by compaction — mechanical, dynamic, and vibratory; (2) consolidation acceleration using prefabricated vertical drains (PVDs) with staged embankment loading; (3) stone column reinforcement with the Priebe method for composite stiffness; (4) deep soil mixing (DSM) for soft clay improvement and liquefaction mitigation; (5) grouting — permeation, compaction, and jet grouting; (6) lime and cement stabilization; and (7) geosynthetic reinforcement for embankment and subgrade applications. All equations are in English units.

Deep Soil Mixing
Deep Soil Mixing
Engineering Dynamics and Geosynthetics
Engineering Dynamics and Geosynthetics