Subsections
21Primary Reference: USACE EM 1110-1-1804, Geotechnical Investigations, 1 January 2001, Chapters 8–9 Railroad Standards: AREMA MRE Chapter 1 & 8; the owner railroad's current engineering standards
- ·Executive Summaryopen →
- ·Empirical Equations — Use and Limitationsopen →
- 4.1.1Background — Why Boring Quality Drives Railroad Deliverable Valueopen →
- 4.1.2Drilling Method Selectionopen →
- 4.1.3Standard Penetration Test (SPT) — Procedure and Correctionsopen →
- 4.1.4Undisturbed Sampling — Shelby Tube and Piston Sampleropen →
- 4.1.5Rock Core Recovery and RQDopen →
- 4.1.6Worked Calculation Examplesopen →
- 4.1.7Annotated Sample Boring Logopen →
- 4.1.8Representative Laboratory Data Table — Chapter 4.1 Samplesopen →
- 4.1.9Reference Photographsopen →
- 4.1.10Practical Recommendationsopen →
- 4.1.11Field Operations Checklist — Borings and Samplingopen →
- 4.1.12Cross-Referencesopen →
- 4.1.13Practice Questions — Chapter 4.1open →
- 4.1.14Case Studiesopen →
- 4.1.15Boring Programs for Track Widening and New Trackopen →
- 4.1.16Sample Disturbance: Sampler Geometry and Recoveryopen →
- 4.1.17Rock Core Logging: Recovery, RQD and First Estimates of Rock Propertiesopen →
- ·Author and Sourcesopen →
- ·Supplemental Referencesopen →
Apps
3 appsChapter 4.1 · Section 4.1.15Corridor Boring ProgramQuarter-mile boring series, top-of-cut borrow borings, culvert-end and structure borings, with counts and footage.Chapter 4.1 · Section 4.1.16Sampler Disturbance (Hvorslev)Hvorslev's area ratio, inside and outside clearance, length-to-diameter ratio and recovery, compared with the recommended limits, with common samplers for comparison.Chapter 4.1 · Section 4.1.17Rock Core Recovery and RQDRecovery and RQD run by run and overall, Deere's quality description, first-approximation rock mass properties and allowable bearing pressure, and an RQD check from a volumetric joint count.