↑ Parent Menu⌂ Main Menu
← Chapter 4.1 Borings and Sampling
GHRM
Railway Ground Hazard Risk Management · 4.0 · Subsurface Exploration
Sections · click a car to open it

Empirical Equations — Use and Limitations

Borings and sampling form the physical backbone of every geotechnical investigation we conduct for railroad clients.
Authors: Daniel P. Colwell and Mario Ruel
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
IS-01SPT energy & procedure correctionN₆₀
IS-02SPT overburden normalization (sands)(N₁)₆₀
RK-10UCS from point load indexσ꜀
IS-03Relative density of sand from SPTDᵣ
IS-05Friction angle of sand from SPT (Peck–Hanson–Thornburn)φ'
IS-07Undrained shear strength of clay from SPTSᵤ
RK-04RQD from volumetric joint countRQD
← Previous · 3.0 Risk Management Chapter 3.10 — Mining and Man-Made Hazards
Next · 5.0 Testing → Chapter 5.1 — In Situ Testing