A strength or consolidation test is only as good as the sample. The Corps of Engineers' Geotechnical Investigations manual (EM 1110-1-1804, Appendix F) summarizes Hvorslev's classic criteria for sampler design. The area ratio, the volume of soil displaced by the cutting shoe relative to the sample, may be the most important single factor. Inside clearance lets the sample enter without wall friction. Outside clearance should be small, or wall friction can cause a bearing failure below the shoe. Sample length should be limited, the tube pushed in one fast, continuous stroke rather than driven, and recovery recorded. The manual also lists the usual causes of poor recovery: pressure above the sample from poor venting, suction below the tube as it is pulled, and failure to shear the sample off at the shoe.
Equation 4.1-1. Hvorslev's sampler ratios (EM 1110-1-1804, Eqs. 2-1 to 2-3)
| Item | Recommendation |
|---|---|
| Area ratio Ca | Preferably below 10 to 15%. ISSMFE (1966) accepted 5 to 20% with the edge taper reduced from 15° to 9° |
| Inside clearance Ci | 0 to 1% for very short samples; 0.5 to 3% for medium length; 0.75 to 1.5% for L/D of 6 to 8 |
| Outside clearance Co | Under 2 to 3% in cohesive soil; zero in cohesionless soil |
| Length to diameter | 5 to 10 in cohesionless soil; 10 to 20 in cohesive soil |
| Advance | Push with a fast, continuous, uniform motion; driving causes the greatest disturbance |
| Recovery | Vent the tube, rotate one or two turns to shear the sample, or use a piston sampler |
A standard 3 in. thin-wall tube of 16 gauge steel has an area ratio of 9.3% and a 2 in. tube of 18 gauge 10.6%. Both are within Hvorslev's preferred range. The standard split spoon used for the SPT has an area ratio of 111.6%, so its samples are disturbed and suitable only for index tests. A 24 in. push that recovers 21 in. gives 88% recovery and a warning to find out why. The nominal tubes show zero inside clearance; tubes with a rolled or swaged cutting edge give the 0.75 to 1.5% Hvorslev suggests, so measure the actual shoe.
Open the sampler disturbance calculator →
Hvorslev's area ratio, inside and outside clearance, length-to-diameter ratio and recovery, compared with the recommended limits, with common samplers for comparison.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.