Project: Bridge Replacement — a Class I railroad line located in Virginia Boring: B-2 Date: April 15, 2026 Driller/Rig: drilling subcontractor, track-mounted rig Drilling Method: HSA (0–42 ft), Mud Rotary (42–65 ft) Hammer Type: Automatic Trip (E_m = 0.83, measured by PDA; N₆₀ uses C_R by rod length with 3 ft of stick-up) Water Table: Encountered at 18.0 ft during drilling; stabilized at 16.5 ft after 30 minutes

| Depth (ft) | Sample | Blows (6"/6"/6") | N_raw | N₆₀ | Soil Description | Lab Tests |
|---|---|---|---|---|---|---|
| 0–2 | SS-1 | 3/4/4 | 8 | 8 | Brown medium sand, trace gravel; fill | — |
| 5–6.5 | SS-2 | 5/6/7 | 13 | 13 | Brown silty fine sand; medium dense; moist | Sieve |
| 10–11.5 | SS-3 | 8/10/12 | 22 | 26 | Gray silty sand; medium dense; moist | Sieve, Atterberg |
| 15–16.5 | ST-1 | Push | — | — | Gray-brown firm silty clay; push recovery 18 in. | Consol, UU Tri |
| 20–21.5 | SS-4 | 12/15/18 | 33 | 43 | Gray sandy gravel; dense; wet; below GWT | — |
| 25–26.5 | SS-5 | 18/22/25 | 47 | 62 | Gray sandy gravel; very dense; wet | — |
| 30–31.5 | SS-6 | 50/4" | R | — | Refusal: 50 blows for 4 in. of penetration | — |
| 35–36.5 | CS-1 | Core run | TCR=75% | — | Gray medium sandstone; RQD=55%; moderately fractured | Unconf. Comp. |
| 40–41.5 | CS-2 | Core run | TCR=92% | — | Gray-brown sandstone; RQD=88%; slightly fractured | — |
SS = Split Spoon; ST = Shelby Tube; CS = Core Sample; R = Refusal; GWT = Groundwater Table; Consol = Consolidation; UU Tri = Unconsolidated-Undrained Triaxial; Unconf. Comp. = Unconfined Compression
Figure 4.1-1 Placeholder: Full-scale boring log in a typical railroad format, showing graphical soil profile, blow count vs. depth plot, water level indicators, and sample retention summary. [Insert CAD or boring log software output here.]
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.