The three examples cover the corrections and ratios that turn field records into design numbers: SPT corrections, the area ratio of a sampling tube, and RQD. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 4.1-1: SPT Corrections for a Bridge Approach Embankment
A boring for a bridge approach embankment replacement on a Class I railroad located in western Kansas passes through silty sand into medium-dense alluvial sand. The raw blow count is corrected first for energy and equipment, giving N60, and then for overburden, giving (N1)60, which is the value most correlations for sand expect.
Given and required for Example 4.1-1.
Given
Variable
Value
Description
N
18 blows/ft
Raw blow count at 20 ft
Em
0.82
Automatic trip hammer
CB
1.00
4-in. hollow-stem auger hole
CR
0.95
About 23 ft of rod (20 ft plus 3 ft of stick-up)
CS
1.00
Split spoon without liner
γ
120 pcf above, 122 pcf below the water table
zw
8 ft
Water table
Required
N60
(N1)60 and relative density
Equations
Eq. 1: N60 = N Em CB CR CS / 0.60 — energy and procedure correction
Eq. 2: σ′v = σv − γw(z − zw) — effective stress at the test depth
Spot check: CN is just above 1 because the effective stress is a little below one atmosphere (2,117 psf).
↓
Solution
N60 = 23; (N1)60 = 26.
Solution
N60 = 23 and (N1)60 = 26, at the medium dense to dense boundary (Dr about 65 to 75%).
The automatic hammer delivers more energy than the 60% standard, so the corrected count is higher than the raw one. Sand this dense has moderate to high liquefaction resistance, but it should still be screened formally with the site’s design ground motion (Chapter 6.5).
Example 4.1-2: Area Ratio of a Push Tube in Soft Clay
Soft marine clay is to be sampled at 22 to 26 ft for a passenger bridge approach rehabilitation. The crew has a 3.5-in. push tube. Its area ratio says how much soil the tube displaces; the project specification says which sampler must be used.
Given and required for Example 4.1-2.
Given
Variable
Value
Description
De
3.50 in.
Outside diameter at the cutting shoe
Di
3.375 in.
Inside diameter at the cutting shoe
Spec
Piston sampling required for soft clay used for undrained strength
Project specification
Required
Area ratio and whether the tube is acceptable
Equations
Eq. 1: AR = (De² − Di²) / Di² × 100% — area ratio; ASTM D1587 (withdrawn 2024) requires 10% or less
AR = 7.5% < 10%: meets ASTM D1587 (withdrawn 2024)
↓
Step 2 · Specification
Piston sampler required regardless of AR
↓
Solution
AR = 7.5%, geometrically acceptable, but a piston sampler is still required.
Solution
AR = 7.5%, so the tube meets ASTM D1587 (withdrawn 2024). The specification still requires a fixed-piston sampler for soft clay strength samples.
Area ratio controls one kind of disturbance; the piston controls another, by holding the sample in the tube during withdrawal. Record the requirement in the pre-field plan and procure the piston sampler before mobilization.
Example 4.1-3: RQD and Recovery of a Sandstone Core Run
A 10-ft HQ core run in sandstone for a bridge scour and foundation investigation on a Class I railroad located in the Appalachians. RQD counts only sound pieces at least 4 in. long; recovery counts everything that came up.
Eq. 2: TCR = recovered length / run length × 100% — total core recovery
Steps
Step 1 · Pieces ≥ 4 in.
7.0 + 9.5 + 6.5 + 8.0 + 4.5
35.5 in.
↓
Step 2 · RQD (Eq. 1)
35.5 / 120
RQD = 30%
↓
Step 3 · TCR (Eq. 2)
45.0 / 120
TCR = 37.5%
Spot check: All ten pieces sum to 45.0 in.
↓
Solution
RQD = 30% (poor); TCR = 37.5%.
Solution
RQD = 30%, poor rock; TCR = 37.5%.
Low RQD with low recovery points to highly fractured sandstone, probably a weathered or fault-adjacent zone. Have a geologist review the core box photographs and describe the fractures before foundation design proceeds. This rock is unlikely to suit end bearing without a deep socket into competent rock below.