↑ Parent Menu⌂ Main Menu
← Chapter 4.1 Borings and Sampling
GHRM
Railway Ground Hazard Risk Management · 4.0 · Subsurface Exploration
Sections · click a car to open it

4.1.17 Rock Core Logging: Recovery, RQD and First Estimates of Rock Properties

Borings and sampling form the physical backbone of every geotechnical investigation we conduct for railroad clients.
Authors: Daniel P. Colwell and Mario Ruel
4.1.17 Rock Core Logging: Recovery, RQD and First Estimates of Rock Properties

Where borings for a bridge, wall or rock cut reach rock, two numbers from each core run carry most of the information: the recovery ratio, and the rock quality designation (RQD). RQD is the total length of pieces 4 in. or longer divided by the length cored. Das's Principles of Geotechnical Engineering defines both and gives Deere's descriptions from Excellent to Very poor. Look's Handbook of Geotechnical Investigation and Design Tables carries RQD into first estimates of rock mass strength and allowable bearing pressure, and into a check from joint counts on exposures. The Corps of Engineers' EM 1110-1-1804 asks for RQD on every run, with core loss shown on the log at its most likely depth. It points out that the weak, fractured zones where recovery is poorest are usually the critical ones for foundations and stability, and that larger core barrels improve recovery in them.

4.1.17.1 Definitions and correlations

Table 4.1-4. Rock quality from RQD, with first-approximation properties
RQD (%)Quality (Deere)Allowable bearing (Peck, Hansen and Thorburn), MPa (ksf)Rock mass (Kulhawy and Goodman)
90–100Excellent20–30 (418–627)Design compressive strength 0.33–0.8qu; c = 0.1qu; φ = 30–60° (RQD over 70)
75–90Good12–20 (251–418)
50–75Fair6–12 (125–251)Design compressive strength 0.33qu; c = 0.1qu; φ = 30° (RQD up to 70)
25–50Poor3–6 (63–125)
0–25Very poor1–3 (21–63)

Bearing values are limited to the uniaxial strength of the rock or the allowable stress of the concrete; Look notes the RQD method is common but not suitable for detailed design. Sources: Das Table 18.7; Look Tables 9.13 and 22.1.

Table 4.1-5. Core barrel sizes (Das Table 18.6)
DesignationBit outside diameter, in. (mm)Core diameter, in. (mm)
EX1-7/16 (36.5)7/8 (22.2)
AX1-7/8 (47.6)1-1/8 (28.6)
BX2-5/16 (58.7)1-5/8 (41.3)
NX2-15/16 (74.6)2-1/8 (54.0)

4.1.17.2 Worked example

Three 5 ft runs in a bedded limestone recover 57.5, 57 and 37.5 in. of core. The pieces 4 in. or longer total 47, 57 and 23.5 in., so the runs have RQDs of 78%, 95% and 39%. Overall the RQD is 71% and the recovery 84%, but the third run (39%) is a poor zone that a single average would hide. The first-approximation allowable bearing for the average is 125 to 251 ksf. A footing or pile tip should be designed on the weakest zone it will bear on, and that zone should be checked with laboratory strength tests.

Photograph every core box wet, with a scale and run markers, before logging. Note any core lost and where. Lost core is usually the weakest rock, and recovery below about half signals highly fractured rock (Das).

Open the core RQD calculator →
Recovery and RQD run by run and overall, Deere's quality description, first-approximation rock mass properties and allowable bearing pressure, and an RQD check from a volumetric joint count.

4.1.17.3 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • B.M. Das, Principles of Geotechnical Engineering, 7th edition: Section 18.7, rock coring, recovery ratio, RQD (Eqs. 18.34 and 18.35, Tables 18.6 and 18.7)Find source ↗
  • B.G. Look, Handbook of Geotechnical Investigation and Design Tables (2007): Tables 9.13, 18.11 and 22.1, rock properties and bearing pressure from RQD and joint countFind source ↗
  • U.S. Army Corps of Engineers, Geotechnical Investigations, EM 1110-1-1804 (2001): rock coring, logging of core loss and RQD per runOfficial page ↗
Supplemental reference · Rajapakse (2016), Ch. 32

Joint Orientation From Oriented Core: Dip, Strike, Dip Direction and Poles

RQD says how broken the rock is, but not which way the breaks run. For a rock cut, tunnel portal or rock-socketed foundation, joint orientation decides whether blocks can slide or topple out of the face (kinematic analysis, Chapter 2.7 and Chapter 6.3). Joint orientation can only be measured from core if the core is oriented.

Oriented coring. A knife in the core barrel cuts a continuous scribe line along the core. Before coring, the driller sets the knife on a known bearing, usually north, with a compass. Proprietary orientation tools do the same with a reference mark. Because the core does not rotate in the barrel, the scribe line stays a fixed reference. For each joint, the logger draws the horizontal line across the joint surface and measures the clockwise angle from the reference line to it: that is the strike. The dip is the angle between the joint surface and the horizontal, measured down the steepest line.

Notation. With the right-hand rule, place the right hand palm down on the joint with the fingers pointing down-dip; the thumb gives the strike direction, so the dip direction is strike + 90°. The same joint can be written three ways, and they are easily confused:

  • Strike/dip (right-hand rule): 070/40.
  • Dip/dip direction: 40/160, the form most rock-slope software uses.
  • Dip/strike, as Rajapakse writes it: 40/070. The dip is given in two digits and the strike in three.

State the convention on every log and in every table of joint data.

Poles. Each joint plane can be represented by its pole, the line normal to the plane, plotted on the lower hemisphere of a stereonet. The pole trends opposite the dip direction (dip direction ± 180°) and plunges at 90° minus the dip. Clusters of poles define the joint sets used in kinematic analysis.

Apparent dip. On a section that is not parallel to the dip direction, such as a cut face or a cross section drawn square to the track, a joint appears flatter than its true dip:

tan α = tan δ × cos β

where α = apparent dip, δ = true dip and β = angle between the section and the dip direction.

For railroad work: Specify oriented core in borings for new or widened rock cuts, portals and high rock-socketed foundations, where surface mapping cannot reach the rock. Set acoustic or optical televiewer logging as an alternative in holes that stay open. Have the driller record the reference bearing and the borehole inclination for every run. Core from an inclined hole must be rotated back to true orientation before plotting.

Source: Rajapakse, R. (2016). Geotechnical Engineering Calculations and Rules of Thumb, 2nd ed. Oxford: Butterworth-Heinemann, Ch. 32 (dip angle and strike; oriented rock coring; concept of the pole). Summarized and paraphrased; the alternative notations, apparent-dip relation and recommendations for railroad work are standard practice added by the authors of this manual.

Example 4.1-5: Joint Orientation From Oriented Core for a Rock Cut

A Class I railroad located in Pennsylvania plans to widen a sandstone cut on the north side of its main line. The new face will dip 70° toward 170°. An oriented NX core from a vertical boring behind the face shows a persistent joint set. The logger recorded it as 40/070 in dip/strike notation, using the right-hand rule. Laboratory tilt tests give a joint friction angle of 30°. The engineer must convert the joint to dip direction and pole, find its apparent dip on a cross section square to the track, and make a first check of whether planar sliding out of the new face is possible.

track face 70° joint daylights in face(true dip 40°) apparent dip = ? oriented core Section looking east; section bearing 170° GivenJoint 40/070 (dip/strike, RHR)Face dips 70° toward 170°Joint friction angle 30°Section square to track: 170° RequiredDip direction; strike/dip formPole trend and plungeApparent dip on the sectionPlanar sliding possible? Black = given; red = required
Given and required for Example 4.1-5.

Given

VariableValueDescription
Joint40/070Dip 40°, strike 070° (right-hand rule), from oriented core in a vertical hole
Face70° toward 170°Planned cut face
φj30°Joint friction angle (tilt test)
SectionBearing 170°Cross section square to the track

Required

  • (a) Dip direction, and the joint in strike/dip and dip/dip-direction forms
  • (b) Pole trend and plunge
  • (c) Apparent dip on the cross section
  • (d) Whether planar sliding out of the face is kinematically possible

Equations

  1. Eq. 1: Dip direction = strike + 90° — right-hand rule
  2. Eq. 2: Pole trend = dip direction ± 180°; plunge = 90° − dip
  3. Eq. 3: tan α = tan δ cos β
  4. Eq. 4: Planar sliding needs dip direction within about 20° of the face dip direction, and φj < δ < face dip.

Steps

Step 1 · (a) Dip direction (Eq. 1)
070 + 90
160°: strike/dip 070/40; dip/dip direction 40/160
↓
Step 2 · (b) Pole (Eq. 2)
160 + 180 = 340; 90 − 40 = 50
Pole trends 340°, plunges 50°
↓
Step 3 · (c) Apparent dip (Eq. 3)
β = 170 − 160 = 10°; tan α = tan 40° × cos 10° = 0.839 × 0.985 = 0.826
α = 39.6°
Spot check: with the section only 10° off the dip direction, the apparent dip should be just under the true 40°.
↓
Step 4 · (d) Planar check (Eq. 4)
|170 − 160| = 10° ≤ 20°; 30° < 40° < 70°
All three conditions met: planar sliding is possible
↓
Solution
40/160; pole 340/50; apparent dip 39.6°; joint daylights and can slide.

Solution

(a) Dip direction 160°; the joint is 070/40 in strike/dip and 40/160 in dip/dip-direction form. (b) The pole trends 340° and plunges 50°. (c) On the cross section square to the track it dips 39.6°. (d) It strikes nearly parallel to the face, daylights in it, and dips more steeply than its friction angle, so planar sliding toward the track is kinematically possible.

A single joint is only a first check. Plot all the oriented-core and face-mapping data on a stereonet, define the sets, and run the full kinematic and limit-equilibrium analysis (Chapters 2.7 and 6.3), including water pressure in the joints and train vibration. Options for this set are a flatter face (at or below about 40°, which needs much more excavation), rock bolts or dowels across the set, or a rockfall catchment sized for the blocks it can release. Record on the boring logs that the joint data are in dip/strike notation. A designer who reads 40/070 as dip/dip direction would put the joint dipping toward 070°, about 100° away from the face, and conclude wrongly that it cannot slide out.

← Previous · 3.0 Risk Management Chapter 3.10 — Mining and Man-Made Hazards
Next · 5.0 Testing → Chapter 5.1 — In Situ Testing