4.1.13 Practice Questions — Chapter 4.1

Borings and sampling form the physical backbone of every geotechnical investigation we conduct for railroad clients.
Authors: Daniel P. Colwell and Mario Ruel
4.1.13 Practice Questions — Chapter 4.1
Each question is worked in the same five parts as the examples. Question 4.1-4 is a planning question, so its steps are a chain of decisions rather than equations.
Question 4.1-1: SPT Corrections With a Donut Hammer

Problem Statement

A boring for a railroad bridge abutment on a Class I railroad located in Nebraska was drilled with a donut hammer, although the owner (assumed) requires automatic hammers on bridge borings. At 35 ft the raw blow count in sand is 24. The engineer must correct the blow count, describe the sand, and decide what to do about the hammer requirement before the data are used for abutment design.

Sand, γ = 118 pcfSand, γ = 125 pcf010203040Depth (ft)GWT 12 ftN = 24 blows/ft at 35 ftN60, (N1)60, Dr = ?Donut hammer, 5-in. hole (Nebraska abutment)GivenN = 24 at 35 ftEm = 0.45 (donut)CB, CR, CS = 1.05, 1.00, 1.00GWT 12 ftOwner: automatic hammers on bridgesRequired(a) N60 (b) (N1)60 (c) Relative density(d) Action on hammer ruleBlack = given; red = required
Given and required for Question 4.1-1.

Given

VariableValueDescription
N24 blows/ft at 35 ftRaw blow count
Em0.45Donut hammer
CB, CR, CS1.05, 1.00, 1.005-in. hole; 35 ft of rod; no liner
γ118 pcf to 12 ft; 125 pcf belowWater table at 12 ft
Owner rule (assumed)Automatic hammers on bridge borings

Required

  • (a) N60
  • (b) (N1)60
  • (c) Relative density
  • (d) Action on the hammer requirement

Equations

  1. Eq. 1: N60 = N Em CB CR CS / 0.60 — energy and procedure correction
  2. Eq. 2: σ′v = σv − γw(z − zw) — effective stress at the test depth
  3. Eq. 3: CN = (2,117/σ′v)0.5 ≤ 1.7; (N1)60 = CN N60 — overburden normalization

Steps

Step 1 · (a) N60
24 × 0.45 × 1.05 / 0.60
18.9, use 19
↓
Step 2 · σ′v
12(118) + 23(125) = 4,291 psf; u = 23(62.4) = 1,435 psf
2,856 psf
↓
Step 3 · (b) (N1)60
CN = (2,117/2,856)0.5 = 0.861; 0.861 × 19
16
↓
Step 4 · (c) Density
Medium dense
↓
Step 5 · (d) Hammer
The energy correction already accounts for the donut hammer; the problem is reliability, not scale.
↓
Solution
N60 = 19; (N1)60 = 16; medium dense; redrill controlling borings.

Solution

(a) N60 = 19. (b) (N1)60 = 16. (c) Medium dense. (d) Report with a data-quality caveat, notify the railroad, and redrill borings that control design with a calibrated automatic hammer.

Do not scale the donut-hammer count up as if it had been driven with an automatic hammer: an automatic hammer in the same sand would have given about 13 blows and the same N60. Donut-hammer energy is highly variable and seldom measured, so the assumed 0.45 carries a large uncertainty.

Question 4.1-2: Area Ratio and Recovery of a Shelby Tube

Problem Statement

On a passenger corridor project, a Shelby tube was pushed 18 in. into soft organic clay beneath a track embankment and came back with 14.5 in. of sample. The specification calls for piston sampling in soft clay. The field engineer must check the tube geometry and recovery and decide whether the sample can go to the laboratory for strength testing.

A Shelby tube in soft organic clay on a passenger corridor project. Recovery as well as area ratio says whether the sample is fit for strength testing.

cutting shoeDe = 3.0 in.Di = 2.875 in.Section at the shoeAr = ? Recovery ratio = ? Field action?18 in.recovery 14.5 in.GivenDe = 3.0 in.; Di = 2.875 in.Push 18 in.; recovery 14.5 in.Spec: piston sampling in soft clayRequired(a) Area ratio(b) Recovery ratio and meaning(c) Field actionBlack = given; red = required
Given and required for Question 4.1-2.

Given

VariableValueDescription
De, Di3.0 in.; 2.875 in.At the cutting shoe
Push, recovery18 in.; 14.5 in.
SpecPiston sampling for soft clay

Required

  • (a) Area ratio
  • (b) Sample recovery ratio and its meaning
  • (c) Field action

Equations

  1. Eq. 1: AR = (De² − Di²) / Di² × 100% — area ratio; ASTM D1587 (withdrawn 2024) requires 10% or less
  2. Eq. 2: SRR = recovered / pushed × 100%

Steps

Step 1 · (a) AR
(9.000 − 8.266) / 8.266
8.9% < 10%: acceptable
↓
Step 2 · (b) SRR
14.5 / 18
80.6%: below the 85 to 90% expected
↓
Step 3 · (c) Action
Index tests only; resample with a fixed piston
↓
Solution
AR 8.9%; SRR 81%; resample with a piston.

Solution

(a) AR = 8.9%, acceptable. (b) SRR = 81%, which suggests sample loss or compression near the base. (c) Keep the sample for water content and index tests and resample the interval with a fixed-piston sampler.

Low recovery in soft organic clay usually means soft material piped past the valve or gas-rich clay compressed during withdrawal. Record the deviation and the corrective action in the field log.

Question 4.1-3: RQD in Weathered Limestone and End Bearing

Problem Statement

A short-line railroad located in Missouri is replacing a timber trestle and wants to know whether a pile or shaft can end-bear on limestone. The first 10-ft HQ core run in weathered limestone recovered ten pieces totaling 40.5 in. The engineer must compute the rock quality from the core and recommend whether end bearing at this level is reasonable.

Weathered limestone, first HQ run58.567.54.5not recoveredRun = 120 in. (10 ft); recovered 40.5 in.Pieces (in.): 2.5, 5, 0.5, 8.5, 1, 6, 3, 7.5, 2, 4.5RQD, TCR = ? End bearing reasonable?GivenRun 120 in.Ten pieces, total 40.5 in.Trestle replacement (Missouri)Required(a) RQD and TCR(b) Rock quality(c) End bearing recommendationBlack = given; red = required
Given and required for Question 4.1-3.

Given

VariableValueDescription
Run120 in.
Pieces2.5, 5.0, 0.5, 8.5, 1.0, 6.0, 3.0, 7.5, 2.0, 4.5 in.Total recovered 40.5 in.

Required

  • (a) RQD and TCR
  • (b) Rock quality
  • (c) Recommendation for end bearing

Equations

  1. Eq. 1: RQD = Σ (pieces ≥ 4 in.) / run length × 100% — ASTM D6032
  2. Eq. 2: TCR = recovered length / run length × 100% — total core recovery

Steps

Step 1 · (a) Pieces ≥ 4 in.
5.0 + 8.5 + 6.0 + 7.5 + 4.5 = 31.5 in.
RQD = 26%; TCR = 40.5/120 = 34%
↓
Step 2 · (b) Quality
Poor; highly fractured or cavity-bearing
↓
Step 3 · (c) Recommendation
Core through the zone; check for karst; socket in competent rock (RQD > 50%) if found at reasonable depth
↓
Solution
RQD 26%, TCR 34%: poor rock; do not plan on end bearing here.

Solution

(a) RQD = 26%, TCR = 34%. (b) Poor rock. (c) End bearing here risks punching into voids or soft infill.

Advance the boring through the weathered zone, watch for loss of drilling fluid and rod drops that mark karst, and redesign for drilled shafts socketed into competent rock if it is found at an acceptable depth. Bearing resistance on fractured rock (RQD 25 to 50%) is much lower than on competent rock (Chapter 6.1).

Question 4.1-4: Emergency Drilling for a Suspected Sinkhole

Problem Statement

A track geometry deviation appeared overnight on a Class I railroad main line in karst country, and a sinkhole is suspected. A 10-mph slow order is in place and the railroad wants borings within 48 hours. The engineer must choose the drilling method, set the minimum boring program, and agree the documentation needed for an emergency investigation.

Pinnacled limestone (karst)Main line: overnight cross-level dip, 10-mph slow ordervoid?Drilling method = ? Boring program = ? Documentation = ?Borings needed within 48 hoursGivenSudden surface and cross-level deviationSuspected sinkhole / collapseTimeline 48 hoursRequired(a) Drilling method(b) Emergency documentation(c) Minimum boring programBlack = given; red = required
Given and required for Question 4.1-4.

Given

VariableValueDescription
SymptomSudden surface and cross-level deviationOvernight
Suspected causeSinkhole or soft ground collapse
Timeline48 hours

Required

  • (a) Drilling method
  • (b) Documentation for an emergency investigation
  • (c) Minimum boring program

Equations

No equation is needed; the answer follows from the criteria listed under Given.

Steps

Step 1 · (a) Method
Hollow-stem auger, with mud rotary and casing as backup; no air rotary, which can destabilize a cavity
↓
Step 2 · (b) Documentation
Preliminary report within 24 hours; daily briefings; immediate notice of any condition affecting track safety; chain of custody for samples
↓
Step 3 · (c) Program
Three borings on the track centerline: at the deviation and 25 ft either side; 30 ft or 10 ft into competent material; SPT every 2.5 ft in the top 15 ft; tubes in soft cohesive soil
↓
Solution
HSA with mud rotary backup; three borings; reporting agreed up front.

Solution

(a) Hollow-stem auger with mud rotary backup. (b) Agree the reporting schedule and safety notifications with the railroad before drilling. (c) Three borings, at the deviation and 25 ft either side, to 30 ft or 10 ft into competent material.

Air pressure in a hole beside a marginal cavity can trigger the collapse the investigation is trying to find, which is why air rotary is ruled out. Deliver preliminary logs and a geohazard assessment by the end of day 2.

Question 4.1-5: Core Size, RQD and Presentation for a Dolomite Bridge Foundation

Problem Statement

A Class I railroad located on the Assiniboine River in Manitoba is replacing a river bridge. Dolomite is expected at about 50 ft and the specification calls for HQ core. The first 10-ft run in rock recovered eight pieces totaling 67 in. The engineer must report the core size, compute the rock quality, and say how the data should be presented and tested for the foundation design.

Dolomite at about 50 ft, first HQ run118143.595.58.57.5not recoveredRun = 120 in. (10 ft); recovered 67.0 in.Pieces (in.): 11, 8, 14, 3.5, 9, 5.5, 8.5, 7.5HQ diameter = ? RQD, TCR = ? Presentation, UCS?GivenCore size HQ (specification)Run 120 in.; eight piecesTotal recovered 67.0 in.Required(a) HQ core diameter(b) RQD and TCR(c) How to present them(d) UCS testingBlack = given; red = required
Given and required for Question 4.1-5.

Given

VariableValueDescription
CoreHQSpecification
Run120 in.First run in dolomite
Pieces11.0, 8.0, 14.0, 3.5, 9.0, 5.5, 8.5, 7.5 in.Total recovered 67.0 in.

Required

  • (a) HQ core diameter
  • (b) RQD and TCR
  • (c) How to present them
  • (d) UCS testing

Equations

  1. Eq. 1: RQD = Σ (pieces ≥ 4 in.) / run length × 100% — ASTM D6032
  2. Eq. 2: TCR = recovered length / run length × 100% — total core recovery

Steps

Step 1 · (a) HQ core
2.50-in. diameter
↓
Step 2 · (b) RQD and TCR
Pieces ≥ 4 in. = 63.5 in.; 63.5/120; 67.0/120
RQD = 53% (fair); TCR = 56%
↓
Step 3 · (c) Presentation
Run-by-run RQD and TCR columns; RQD bar chart beside the log; core photo numbers; flag runs below 25%
↓
Step 4 · (d) UCS
At least three specimens per rock unit (ASTM D7012)
↓
Solution
2.50 in.; RQD 53%, TCR 56%; run-by-run columns; three UCS tests per unit.

Solution

(a) 2.50 in. (b) RQD = 53% (fair), TCR = 56%. (c) Run-by-run columns with an RQD chart and photo references. (d) At least three UCS specimens per rock unit.

RQD close to TCR means nearly all recovered core is sound; the concern is the 44% that did not come up, which may be soft seams, solution features or drilling problems. Review the drilling record before interpreting the loss. For dolomite with qu of 5,000 to 20,000 psi, bearing rarely governs; socket geometry and uplift usually do.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-01 SPT energy & procedure correction N₆₀Use: All soils tested by SPT (ASTM D1586). Normalizes blow count to 60% of theoretical free-fall energy, the basis for most U.S. correlations. Limits: CE ranges ~0.5–1.6 depending on hammer type; use measured energy (ASTM D4633, withdrawn 2025) where available. Rod-length factor ranges differ between Skempton (1986) and Youd et al. (2001).
  • IS-02 SPT overburden normalization (sands) (N₁)₆₀Use: Cohesionless soils; normalizes to σ'v0 = 1 atm. Cap of 1.7 recommended by NCEER workshop. Limits: Not applicable to clays. Unreliable at σ'v0 > ~4,200 psf, about 2 tsf (other CN forms preferred at depth).
← Previous · 3.0 Risk Management Chapter 3.10 — Mining and Man-Made Hazards
Next · 5.0 Testing → Chapter 5.1 — In Situ Testing