4.1.11 Field Operations Checklist — Borings and Sampling

Borings and sampling form the physical backbone of every geotechnical investigation we conduct for railroad clients.
Authors: Daniel P. Colwell and Mario Ruel
4.1.11 Field Operations Checklist — Borings and Sampling

Checklist · Part V · Subsurface Exploration

Field Operations Checklist — Borings and Sampling

Pre-Mobilization0 of 7
During Drilling0 of 10
Post-Field0 of 5

McKinnon (2012) builds on the accident ratio: for every serious injury there are larger numbers of minor injuries, more property-damage events, many near misses, and beneath those a broad base of high-risk acts and conditions. Heinrich (1931) reported 1 serious injury : 29 minor injuries : 300 no-injury accidents. Bird and Germain (1966), from nearly 2 million reported accidents, gave 1 serious : 10 minor : 30 property damage : 600 near misses. A British Tye-Pearson study gave 1 : 3 : 50 first aid : 80 damage : 400 near misses, and the U.K. HSE (1993) gave 1 : 11 : 441. McKinnon stresses that the exact numbers matter less than the conclusion: near misses are far more frequent than injuries, and often the only difference between the two is luck.

Because near misses share the same causes as accidents, they are free warnings. McKinnon’s system (recognition, reporting, risk ranking, investigation and remedy) does not investigate every report. Each near miss is ranked on a simple matrix of potential loss severity versus probability of recurrence. Events in the high–high cell are investigated as rigorously as a serious injury, as are high–medium-high and medium-high–medium-high events; lower-ranked reports are tracked and addressed once the high-potential ones are under control. He cites the “critical few” principle: perhaps 20% of near misses hold 80% of the loss potential. A no-blame policy is essential, since programs fail when reporting leads to discipline. He notes that rail has adopted this model through CIRAS, a confidential reporting system used in Britain.

For railroad work: Add near-miss reporting to the borings and sampling field checklist. Drilling on the right-of-way combines rotating equipment and overhead or buried utilities with train movements and roadway worker protection, so close calls such as a rig mast near the foul envelope, an unannounced train during setup, or a mislocated utility should be recorded on the daily report, ranked, and discussed at the next job briefing. The railroad’s own close-call program (for example FRA’s C3RS on participating carriers) may also apply; follow the client’s reporting rules.

Source: McKinnon, R. C. (2012). Safety Management: Near Miss Identification, Recognition, and Investigation. Boca Raton, FL: CRC Press (Taylor & Francis), pp. 12–17, 24–26. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.

Ticks are saved in this browser.
Plain text version

Pre-Mobilization

  • [ ] RWP certification confirmed for all field personnel (client-specific)
  • [ ] Boring layout plan approved by client engineering contact
  • [ ] Track protection form or ROW access agreement executed
  • [ ] Drilling fluid management plan submitted
  • [ ] Core boxes, sample containers, wax/end caps, and chain-of-custody forms staged
  • [ ] SPT energy measurement device calibrated and staged (confirm whether the owner railroad requires measured energy)
  • [ ] Emergency contact list posted (client dispatcher, project manager, safety officer)

During Drilling

  • [ ] Borehole diameter and drilling method recorded on log
  • [ ] Hammer type and energy ratio recorded on log (measured E_m where required)
  • [ ] Rod length recorded at each SPT interval for C_R correction
  • [ ] SPT seating drive and test drive blow counts recorded separately
  • [ ] Borehole conditioning documented before each Shelby tube push
  • [ ] Sample lengths measured and recorded immediately after recovery
  • [ ] Chain-of-custody form completed for each sample
  • [ ] Core boxes labeled and photographed (pre- and post-logging)
  • [ ] Drilling fluid returns observed and documented (mud rotary)
  • [ ] Water table encountered depth and stabilized depth recorded

Post-Field

  • [ ] Samples packaged and transported under chain-of-custody to laboratory
  • [ ] Boring logs drafted within 48 hours of field completion
  • [ ] Energy calibration data attached to boring log submittal
  • [ ] Core box photographs uploaded to client data portal
  • [ ] Field notes, drillers' logs, and geologist logs archived per client data retention requirements
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-01 SPT energy & procedure correction N₆₀Use: All soils tested by SPT (ASTM D1586). Normalizes blow count to 60% of theoretical free-fall energy, the basis for most U.S. correlations. Limits: CE ranges ~0.5–1.6 depending on hammer type; use measured energy (ASTM D4633, withdrawn 2025) where available. Rod-length factor ranges differ between Skempton (1986) and Youd et al. (2001).