McKinnon (2012) builds on the accident ratio: for every serious injury there are larger numbers of minor injuries, more property-damage events, many near misses, and beneath those a broad base of high-risk acts and conditions. Heinrich (1931) reported 1 serious injury : 29 minor injuries : 300 no-injury accidents. Bird and Germain (1966), from nearly 2 million reported accidents, gave 1 serious : 10 minor : 30 property damage : 600 near misses. A British Tye-Pearson study gave 1 : 3 : 50 first aid : 80 damage : 400 near misses, and the U.K. HSE (1993) gave 1 : 11 : 441. McKinnon stresses that the exact numbers matter less than the conclusion: near misses are far more frequent than injuries, and often the only difference between the two is luck.
Because near misses share the same causes as accidents, they are free warnings. McKinnon’s system (recognition, reporting, risk ranking, investigation and remedy) does not investigate every report. Each near miss is ranked on a simple matrix of potential loss severity versus probability of recurrence. Events in the high–high cell are investigated as rigorously as a serious injury, as are high–medium-high and medium-high–medium-high events; lower-ranked reports are tracked and addressed once the high-potential ones are under control. He cites the “critical few” principle: perhaps 20% of near misses hold 80% of the loss potential. A no-blame policy is essential, since programs fail when reporting leads to discipline. He notes that rail has adopted this model through CIRAS, a confidential reporting system used in Britain.
For railroad work: Add near-miss reporting to the borings and sampling field checklist. Drilling on the right-of-way combines rotating equipment and overhead or buried utilities with train movements and roadway worker protection, so close calls such as a rig mast near the foul envelope, an unannounced train during setup, or a mislocated utility should be recorded on the daily report, ranked, and discussed at the next job briefing. The railroad’s own close-call program (for example FRA’s C3RS on participating carriers) may also apply; follow the client’s reporting rules.
Source: McKinnon, R. C. (2012). Safety Management: Near Miss Identification, Recognition, and Investigation. Boca Raton, FL: CRC Press (Taylor & Francis), pp. 12–17, 24–26. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
Pre-Mobilization
During Drilling
Post-Field
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.