Thin-walled Shelby tube samples are the standard method for recovering nominally undisturbed specimens of soft to medium stiff cohesive soils for consolidation, triaxial, and direct shear testing. The degree of sample disturbance is quantified by the Area Ratio (AR):

Where:
For a standard 3-in. OD Shelby tube with 2.875-in. ID:
An area ratio of 10% or less is the usual criterion for undisturbed sampling (Hvorslev; see Section 4.1.16). Standard 3-in. thin-walled tubes (ASTM D1587, withdrawn 2024) meet it.
Sample Quality Designation (SQD) per Lunne et al. (1997) for clays with OCR 1–2, based on the void ratio change (Δe/e₀) when the specimen is reloaded to the in situ stress in the consolidation test:
| Δe/e₀ | Sample Quality |
|---|---|
| < 0.04 | Very good to excellent |
| 0.04–0.07 | Good to fair |
| 0.07–0.14 | Poor |
| > 0.14 | Very poor |
Report sample quality (SQD) for Shelby tube samples used in consolidation analysis. Where undrained strength of soft clay governs design, specify fixed-piston samplers rather than open push tubes.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| AR | intermediate value computed on this page | Another equation | Computed: AR = D_e^2 - D_i^2 D_i^2 × 100% | project-specific |
| De | outside diameter of the tube cutting edge (in.) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| Di | inside diameter of the tube (in.) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
The fixed-piston sampler uses a piston held stationary at the base of the borehole while the sample tube is advanced by hydraulic push, creating a partial vacuum that retains the sample and prevents water entry. Piston samples typically have lower disturbance than conventional push tubes and are preferred for marine and lacustrine soft clay investigations where sample quality is paramount.


GEC 5 (Table 47) flags soils and soft rocks where conventional SPT and tube sampling give misleading results. The ones that show up most often on railroad corridors:
| Material | Sampling difficulty | Engineering concern |
|---|---|---|
| Colluvium and talus | Thin weak lenses; rock fragments prevent sampling; boulders preclude drilling | Thin weak layer and water at the colluvium/rock contact control slope stability; talus may sit at FS ≈ 1. Use test pits, trenches, and surface-wave geophysics for talus thickness. |
| Shale, claystone and other degradable rock | Rock-like in place, needs coring; drilling water starts degradation | Rockfill or cut faces degrade on wetting; slope stability decreases progressively. |
| Cemented sands | High blow counts / refusal look like dense sand; coring water may dissolve binder | Brittle; collapse if the cement is soluble; long-term strength may drop to uncemented sand. |
| Sensitive (quick) clays | Metastable structure makes undisturbed sampling difficult; may need foil or block sampler | Can fail with little or no warning. |
For these materials, plan test pits or block samples, triple-tube coring, or in-situ tests (Chapter 5.1) rather than relying on SPT and Shelby tubes.
Source: Sabatini, P. J. et al. (2002). Evaluation of Soil and Rock Properties. Geotechnical Engineering Circular No. 5, FHWA-IF-02-034 (superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017))