4.1.12 Cross-References

Borings and sampling form the physical backbone of every geotechnical investigation we conduct for railroad clients.
Authors: Daniel P. Colwell and Mario Ruel
4.1.12 Cross-References
TopicSee Chapter
Boring location and depth planningChapter 3.9
SPT-based classificationChapter 2.2
In situ testing (CPT, VST, PMT)Chapter 5.1
Groundwater measurements during drillingChapter 2.8
Foundation bearing capacity from SPTChapter 6.1
Settlement analysis from consolidation samplesChapter 6.2
Liquefaction screening using (N₁)₆₀Chapter 6.5
Laboratory testing of recovered samplesChapter 5.2
Boring log reporting and submittalChapter 8.4