4.1.3 Standard Penetration Test (SPT) — Procedure and Corrections

Borings and sampling form the physical backbone of every geotechnical investigation we conduct for railroad clients.
Authors: Daniel P. Colwell and Mario Ruel
4.1.3 Standard Penetration Test (SPT) — Procedure and Corrections
4.1.3.1 SPT Procedure (ASTM D 1586)

The Standard Penetration Test is the single most important field test in railroad geotechnical practice. Nearly every design parameter used in embankment stability, foundation bearing capacity, settlement, and liquefaction analysis for our railroad clients is either directly derived from SPT N-values or calibrated against them. Executing the SPT correctly — and applying the complete correction chain before using N-values in analysis — is a non-negotiable quality standard.

Standard Penetration Test
Standard Penetration Test

Procedure:

  1. Advance the borehole to the test depth using the selected drilling method.
  2. Insert a split-barrel sampler (1.375 in. ID, 2.0 in. OD, 18-in. barrel) to the bottom of the borehole.
  3. Apply a seating drive: drive the sampler 6 in. using a 140-lb hammer falling 30 in. Record blow count for seating (not used in N calculation).
  4. Apply the test drive: drive the sampler an additional 12 in. in two 6-in. increments. Record blow counts for each 6-in. increment.
  5. The SPT N-value (blows/ft) is the sum of blow counts for the final 12 in. of penetration.
  6. Retrieve the sampler. Record sample length, soil description, and any subsamples retained for laboratory testing.

Refusal: If 50 blows are required for less than 6 in. of penetration, the test is terminated and recorded as refusal at the applicable penetration depth.

4.1.3.2 SPT Energy Correction

The raw SPT N-value is meaningless for quantitative analysis without correction to a standard energy level of 60% of the theoretical free-fall energy. The corrected value, designated N₆₀, is calculated as:

N60 = Nraw × Em × CB × CR × CS0.60

Where:

  • E_m = hammer energy ratio (energy delivered / theoretical energy). Automatic trip hammer: E_m ≈ 0.80–0.85; safety hammer (rope-and-cathead): E_m ≈ 0.55–0.60; donut hammer: E_m ≈ 0.45.
  • C_B = borehole diameter correction: 1.00 for 2.5–4.5 in. borehole; 1.05 for 6 in.; 1.15 for 8 in. (Skempton 1986)
  • C_R = rod length correction (Youd et al. 2001): 0.75 for rod length < 10 ft; 0.80 for 10–13 ft; 0.85 for 13–20 ft; 0.95 for 20–33 ft; 1.00 for > 33 ft. Rod length includes the stick-up above the ground surface.
  • C_S = sampler correction: 1.00 for a standard sampler, or a sampler with room for liners used with the liners in place; 1.1–1.3 for a sampler with room for liners used without them.

Measure and report hammer energy for each SPT rig (ASTM D4633, withdrawn 2025). Measure energy for each rig with an SPT analyzer (for example a PDA with instrumented rods) at the start of each field mobilization, and report the measured E_m values in the investigation report.

SPT N Values and Trends
SPT N Values and Trends
Inputs for the equations in this section (5)
SymbolWhat it isComes fromHow to get itTypical range
N60SPT blow count = N_raw × E_m × C_B × C_R × C_S 0.60Field testStandard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60.loose sand 4–10, dense 30–50 blows/ft · by USCS group
Emhammer energy ratio (energy delivered / theoretical energy)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.≈ 0.80–0.85
CBborehole diameter correction: 1.00 for 2.5–4.5 inTest setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
CRrod length correction: 0.75 for rod length < 10 ftChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
CSsampler correction: 1.00 for split spoon without linerTest setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
4.1.3.3 Overburden Stress Correction

For liquefaction and relative density analyses, N₆₀ is further corrected to a reference overburden stress of one atmosphere (P_a = 2,117 psf, about 1.06 tsf) to yield (N₁)₆₀:

CN = √Paσ'v ≤ 1.7
(N1)60 = CN × N60

Where:

  • P_a = atmospheric pressure = 2,117 psf (about 1.06 tsf)
  • σ'_v = vertical effective stress at the test depth (psf)

Note: C_N is capped at 1.7 (Youd et al. 2001) to prevent unrealistically high corrections at low effective stress (shallow depth).

Inputs for the equations in this section (4)
SymbolWhat it isComes fromHow to get itTypical range
CNintermediate value computed on this pageAnother equationComputed: C_N = √ P_a σ'_v ≤ 1.7project-specific
(N1)60SPT blow count = C_N × N60Field testStandard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60.loose sand 4–10, dense 30–50 blows/ft · by USCS group
Paatmospheric pressure = 2,117 psf = 1.0 tsfConstantPhysical constant or standard value.project-specific
σ'vvertical effective stress at the test depth (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
4.1.3.4 SPT Relative Density and Consistency Correlations
MaterialN₆₀ (blows/ft)Relative Density / Consistency
Sand0–4Very Loose
Sand4–10Loose
Sand10–30Medium Dense
Sand30–50Dense
Sand> 50Very Dense / Refusal
Clay0–2Very Soft
Clay2–4Soft
Clay4–8Medium Stiff
Clay8–15Stiff
Clay15–30Very Stiff
Clay> 30Hard
Supplemental reference

Field errors that bias N-values

Energy and rod corrections cannot fix a badly run test. GEC 5 (after Kulhawy and Mayne, 1990) lists the field causes and which way they push N:

Table 6-S3. Factors affecting SPT results

CauseEffectInfluence on N
Inadequate cleaning of holeTest not in original soil; trapped soil compressed in samplerIncreases
Water head not maintained in boreholeBottom of hole becomes quickDecreases
Careless measure of dropEnergy varies, usually lowIncreases
Hammer weight inaccurateEnergy varies 5–7% commonlyEither
Hammer strikes collar eccentricallyEnergy reducedIncreases
No free fall (stiff rope, ungreased sheave, > 2 turns on cathead)Energy reducedIncreases
Sampler driven above bottom of casingDriven in disturbed, densified soilIncreases greatly
Non-standard samplerCorrelations invalidEither
Coarse gravel or cobblesSampler plugged or impededIncreases
Bent drill rodsEnergy transfer inhibitedIncreases

Note that most errors increase N — i.e., they are unconservative. GEC 5 also notes that Skempton’s tabulated energy ratios (donut 0.5–1.0, safety 0.7–1.2, automatic 0.8–1.5 as CE = ER/60) are guidance only; measure ER per ASTM D4633 (withdrawn 2025).

Source: Sabatini, P. J. et al. (2002). Evaluation of Soil and Rock Properties. Geotechnical Engineering Circular No. 5, FHWA-IF-02-034 (superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017))

Case study: 4.1.14.2 SPT field values: counting error and three rigs on one site (Look 2023), in Section 4.1.14 Case Studies.

Supplemental reference · Carter & Bentley (2016), §3.3

Two More SPT Corrections: Fine Sand Below the Water Table, and Dynamic Probes

Silts and fine sands below the water table. In very fine sand and silt below the water table, the sampler drives faster than the pore water can drain. Dense soils dilate and develop suction, so the blow count reads high. The correction attributed to Terzaghi, and recommended by Tomlinson, reduces blow counts above 15:

N′ = 15 + ½ (N − 15)  for N > 15; no correction for N ≤ 15

Apply it to the field N in saturated silts and very fine or silty sands before the energy and overburden corrections, when the N value will be used for relative density, friction angle or bearing. Do not apply it when using the liquefaction methods, which were calibrated on N values without it.

Which N the density table applies to. The Terzaghi and Peck relative-density limits for sand in Section 4.1.3.4 (0–4, 4–10, 10–30, 30–50, over 50) are good average values for normally consolidated natural sands once the blow counts are corrected for both energy and overburden, that is, for (N1)60 (Skempton 1986). Use (N1)60 with that table for sand; the clay consistency rows are read with N60.

Dynamic probes. Continuous dynamic probes are driven without a borehole and record blows per 4 in. (100 mm). The super-heavy probe (DPSH) has the SPT hammer, drop and diameter, so three consecutive 4-in. counts add up to an equivalent N. For other probes, an equivalent N in granular soil follows from assuming that penetration is proportional to the energy per blow and inversely proportional to the cone area:

NSPT = (Mp Fp As Ps) / (Ms Fs Ap Pp) × probe blows

where M and F are the hammer weight and drop, A is the end area, P is the penetration per recorded count, and subscripts s and p refer to the SPT (140 lb, 30 in., about 3.0 in.², 12 in.) and the probe. For the heavy probe (DPH: 110 lb, 19.7 in., 1.72-in. cone of 2.33 in.², counted per 4 in.) this gives N ≈ 2 × DPH blows per 4 in. There is no such equivalence in clay, where the probe’s rod friction and the soil’s rate effects differ; use probe results in clay only with correlations calibrated to that probe.

For railroad work: Fine sands and silts below the water table are common in floodplain approaches, culvert and bridge foundations, and tracks on old lake beds. Note on the boring log where the Terzaghi correction was applied, so later users do not apply it twice or leave it out of a liquefaction check. Dynamic probes are a quick way to fill gaps between borings along a track shoulder or embankment toe. Correlate them to the SPT at one or two borings on the job before using the conversion, and stop the probe where rod friction builds up in clay.

Source: Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed., §3.3.2–3.3.3, Eqs. 3.13 and 3.15. Summarized and paraphrased; probe dimensions converted to US units. Full reference under Supplemental References.

Example 4.1-4: Correcting N in Fine Silty Sand Below the Water Table

A culvert under a main line of a Class I railroad located in Louisiana is to be replaced with a jacked pipe. A boring at the jacking pit found fine silty sand below a water table 8 ft deep. At 25 ft an automatic hammer with a measured energy ratio of 82% recorded N = 31, with 3 ft of rod stick-up. A heavy dynamic probe (DPH) pushed beside the boring recorded 14 blows per 4 in. at the same depth. The engineer must correct the blow count, classify the density of the sand for the jacking-pit design, and check the probe against the boring.

silty sand, γ = 120 pcf fine silty sand, γ = 125 pcf (saturated) WT 8 ft Boring N = 31 at 25 ft, ER = 82% DPH probe14 blows / 4 in. 25 ft (N1)60 = ? density = ? GivenN = 31 at 25 ft; ER = 82%Rod length 28 ft; standard sampler4-in. borehole; WT at 8 ftγ = 120 pcf above, 125 pcf belowDPH: 14 blows per 4 in. RequiredFine-sand correction N′N60 and (N1)60Density classProbe-equivalent N Black = given; red = required
Given and required for Example 4.1-4.

Given

VariableValueDescription
N31Field blow count at 25 ft, fine silty sand below the water table
Em0.82Measured hammer energy ratio (automatic hammer)
Rod length28 ft25 ft plus 3 ft stick-up: CR = 0.95
CB, CS1.00, 1.004-in. borehole; standard sampler
Water table8 ftγ = 120 pcf above, 125 pcf below; γw = 62.4 pcf
DPH14 blows per 4 in.Heavy dynamic probe beside the boring, same depth

Required

  • (a) Blow count corrected for fine sand below the water table
  • (b) N60 and (N1)60
  • (c) Relative density class, with and without the fine-sand correction
  • (d) Equivalent N from the dynamic probe

Equations

  1. Eq. 1: N′ = 15 + ½(N − 15) — for N > 15
  2. Eq. 2: N60 = N Em CB CR CS / 0.60
  3. Eq. 3: (N1)60 = CN N60, CN = √(2,117/σ′v) ≤ 1.7
  4. Eq. 4: N ≈ 2 × DPH blows per 4 in.

Steps

Step 1 · (a) Fine-sand correction (Eq. 1)
15 + 0.5 × (31 − 15)
N′ = 23
↓
Step 2 · (b) N60 (Eq. 2)
23 × 0.82 × 1.00 × 0.95 × 1.00 / 0.60
N60 = 29.9
↓
Step 3 · (b) Effective stress at 25 ft
σv = 8 × 120 + 17 × 125 = 3,085 psf; u = 17 × 62.4 = 1,061 psf
σ′v = 2,024 psf
↓
Step 4 · (b) (N1)60 (Eq. 3)
CN = √(2,117/2,024) = 1.02; 1.02 × 29.9
(N1)60 = 31
↓
Step 5 · (c) Density class (Section 4.1.3.4, read with (N1)60)
With the correction: 31, at the boundary of medium dense and dense. Without it: 31 × 0.82 × 0.95/0.60 × 1.02 = 41
Medium dense to dense (corrected) vs. dense (uncorrected)
Spot check: the ratio of the two results, 41.2/30.5 = 1.35, equals 31/23, the size of the fine-sand correction.
↓
Step 6 · (d) Probe check (Eq. 4)
2 × 14
N ≈ 28, close to the field N of 31
↓
Solution
N′ = 23; N60 = 30; (N1)60 = 31; design as medium dense.

Solution

(a) N′ = 23. (b) N60 = 30 and (N1)60 = 31. (c) Medium dense to dense with the fine-sand correction; dense without it. (d) The probe gives N ≈ 28, which agrees with the field blow count.

For the jacking-pit design, take the sand as medium dense. The uncorrected value would overstate the friction angle by a few degrees and understate the face pressure needed to keep the silty sand from running into the pipe. Fine silty sand below the water table is also the soil most likely to flow into a jacking pit or under a pipe face, so the dewatering and face-support plan matters more than the exact density class. Record on the log that the Terzaghi correction was used for the design values. Use the uncorrected N60 for any liquefaction check. Because the probe agrees with the boring, further probes can fill in the profile along the pipe alignment between borings.