↑ Parent Menu⌂ Main Menu
← Chapter 4.1 Borings and Sampling
GHRM
Railway Ground Hazard Risk Management · 4.0 · Subsurface Exploration
Sections · click a car to open it

4.1.8 Representative Laboratory Data Table — Chapter 4.1 Samples

Borings and sampling form the physical backbone of every geotechnical investigation we conduct for railroad clients.
Authors: Daniel P. Colwell and Mario Ruel
4.1.8 Representative Laboratory Data Table — Chapter 4.1 Samples
SampleDepth (ft)Soil Descriptionw_n (%)LL (%)PL (%)PIγ_d (pcf)USCSLab Tests Completed
SS-310–11.5Silty fine sand14.222184104SC-SMSieve, Atterberg
ST-115–16.5Silty clay38.748242482CLConsol, UU Tri
SS-420–21.5Sandy gravel8.1NPNPNP118GW-GMSieve
CS-135–36.5Sandstone core—————RockUnconf. Comp.
Water Content Test
Water Content Test
← Previous · 3.0 Risk Management Chapter 3.10 — Mining and Man-Made Hazards
Next · 5.0 Testing → Chapter 5.1 — In Situ Testing