↑ Parent Menu⌂ Main Menu
← Chapter 3.7 Cost Estimates
GHRM
Railway Ground Hazard Risk Management · 3.0 · Risk Management
Sections · open a dropdown to go to a section or subsection

3.7.10 Cross-References

Estimating the cost of exploration, testing, engineering and stabilization, and checking that the number will hold.
Author: Daniel P. Colwell
3.7.10 Cross-References
Table 3.7-7. Related chapters
TopicRefer to
Scope and assumptionsChapter 3.1
Drilling scope, RFP and contingenciesChapter 3.3
Access and clearing quantitiesChapter 3.6
Risk reduction ratingsSections 3.8.37 to 3.8.39
Alternatives on the risk assessment reportSection 3.8.42
Change ordersChapter 8.2
← Previous · 3.0 Risk Management Chapter 3.6 — Site Accessibility Study
Next · 3.0 Risk Management → Chapter 3.8 — Risk Ratings and Ground Hazard Risk Assessment