Engineering hours follow the deliverable. In the example of Figure 3.7-1, 92 hours covered typed logs (14), analysis (42) and reporting (36) for drilled-shaft design, pavement subgrade parameters, undercut and settlement. A memorandum addendum with stability analyses and quantities for a few reaches takes fewer; a full ground hazard assessment with alternatives takes more. Round all hours to the nearest half hour and bill them at the client's current rate schedule.