| Item | Basis |
|---|---|
| Airfare | 120 percent of the average round-trip fare for the route, to allow for booking late |
| Lodging | Hotel nearest the site at the client-allowed nightly rate, for every drilling night |
| Rental car and fuel | Per day on site |
| Per diem | Client or federal rates |
| Who travels | The field engineer for every drilling day; the senior engineer for a one-day reconnaissance where needed |
Write the travel plan into the estimate in a sentence ("the design engineer flies in, rents a car, stays at the hotel nearest the gate and is with the rig every drilling day; the senior engineer makes a one-night reconnaissance trip") so the client can see what it is paying for.