↑ Parent Menu⌂ Main Menu
← Chapter 2.7 Rock and Sand: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.7.16 Cross-References

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls, slides on its joints, weathers, slakes and dissolves.
Author: Daniel P. Colwell
2.7.16 Cross-References
TopicRefer To
Subsidence and karst mechanismsChapter 3.8, Section 3.8.5
Rock coring and RQDChapter 4.1, Section 4.1.5
Seismic refraction and MASWChapter 5.1, Sections 5.1.6–5.1.7
Rock classificationChapter 2.2, Section 2.2.6
Field permeability testing and dewateringChapter 2.8, Sections 2.8.4–2.8.6
Rock cut slope designChapter 6.3, Section 6.3.7
LiquefactionChapter 6.5
Risk rating of rockfall and slope hazardsChapter 3.8
Typical values for sands from blow countsAppendix D, Section D.2
← Previous · 2.0 The Underworld Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.8 — Groundwater Characterization and Seepage