The strength and stiffness of clean sand depend mainly on relative density and confining stress. Relative density is estimated from SPT or CPT because undisturbed sampling of sand is impractical.
Eq. 2.7-2 (definition; Idriss and Boulanger 2008 estimate)
Eq. 2.7-3 (Bolton 1986, triaxial; p′ = mean effective stress in psf; use 5 IR for plane strain)
| Sand | φ′cv (deg) |
|---|---|
| Rounded quartz sand | 30–32 |
| Subangular quartz sand | 32–34 |
| Angular quartz sand | 34–37 |
| Feldspathic or crushed rock sand | 36–40 |
| Micaceous sand | 28–31 |
After Bolton (1986) and Kulhawy and Mayne (1990). Add the dilatancy term of Eq. 2.7-3 for peak strength.
Density classes and the corresponding φ′, unit weight and modulus from blow counts are tabulated in Appendix D, Section D.2.
Settlement of footings and fills on sand is mostly immediate; Schmertmann's strain-influence method with Es from CPT or SPT is the usual approach (Chapter 6.2, Section 6.2.3). Loose sand under track also settles from vibration and repeated loading, and saturated loose sand can liquefy in earthquakes (Chapter 6.5).