| Hazard | Mechanism | Signs | Response |
|---|
| Scour | Flowing water removes sand from around piers, abutments and culvert outlets; fine sand has the lowest critical velocity of any soil (about 1 ft/s) | Exposed footings, holes at outlets, settlement of approach fills after floods | Scour evaluation (FHWA HEC-18), riprap or articulated mats on a filter, deeper foundations |
| Running and flowing sand | Upward seepage into an excavation below the water table reduces effective stress to zero (quick condition at ic ≈ 1) | Sand boils; sides of trench collapse; loss of ground under adjacent track | Dewater ahead of excavation (wellpoints), sheeting, tremie concrete |
| Vibration settlement of loose sand | Train vibration densifies loose, dry or moist sand | Gradual settlement concentrated over loose fill | Densify during construction; compaction control |
| Liquefaction | Cyclic loading of loose saturated sand | Sand boils, lateral spread after earthquakes | Chapter 6.5 |
| Wind-blown sand | Sand drifts onto track and fills ballast voids | Fouled ballast, buried rail | Fencing, vegetation, stabilizers, sand-shedding structures, more frequent ballast cleaning |
| Erosion of sand slopes | Rainfall runoff and seepage on uncemented sand | Rills and gullies, slumping at seepage faces | Vegetation, erosion mats, toe drains, flatter slopes (2H:1V or flatter) |