Folds, faults, shear zones, veins and unconformities control where a rock cut is weak, where water flows and how the orientation of discontinuities changes along the cut. They are best recognized in outcrops and old cuts before excavation, and on the terrain map (Section 3.2.11 in Chapter 3.2). Photographs of each type in road cuts and outcrops are collected in the Atlas of Structural Geology (Mukherjee 2015).
A fold has a hinge, two limbs and an axial plane. Anticlines are arched up and synclines down. Across a folded cut the dip of bedding, and therefore the kinematic hazard, changes: one limb may dip into the cut (planar sliding) while the other dips away (toppling or stable). Tension fractures open along anticline crests; synclines collect water. Thin weak layers between strong beds are often sheared and thinned on the limbs.
A fault zone usually has a fault core of clay-rich gouge, breccia or cataclasite around the principal slip surface, which is polished and striated (slickensides), and a damage zone of intensely fractured and veined rock on either side. Fault zones range from centimeters to more than 100 m wide; one regional fault exposed in a highway cut in limestone has a zone over 100 m wide in which the bedding is obliterated (Mukherjee 2015, after Caine and others).
Ductile shear zones are bands of strongly foliated rock (mylonite) in which the rock has flowed rather than fractured; the foliation forms a weak, closely spaced fabric that controls sliding. Veins are fractures filled with minerals (quartz, calcite, gypsum). Quartz veins are strong; calcite and gypsum veins can be weaker or soluble.
An unconformity is a buried erosion surface that represents a gap in time. A disconformity has parallel layers above and below; an angular unconformity has tilted or folded rocks below flat-lying rocks above; a nonconformity has sedimentary rock over igneous or metamorphic rock (Physical Geology text, Chapter 9). For a cut the surface often carries a weathered zone or old soil, perches water, and separates two rock masses with different discontinuity orientations.
For railroad work: Divide every rock cut into structural domains bounded by fold hinges, faults and unconformities, and run the kinematic analysis and rock mass rating for each domain separately (Sections 2.7.17 and 2.7.18). Map fault zones on the cut face and in the borings, sample the gouge for residual shear strength, and put horizontal drains or relief wells where the fault core dams groundwater behind the face. Where faults cross a cut or tunnel on a line through ultramafic rock, have the rock tested for asbestos before any excavation or ballast production.