↑ Parent Menu⌂ Main Menu
← Chapter 2.7 Rock and Sand: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.7.1 Sand: Identification and Classification

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls, slides on its joints, weathers, slakes and dissolves.
Author: Daniel P. Colwell
2.7.1 Sand: Identification and Classification

Sand is soil with more than half of its coarse fraction passing the No. 4 sieve (0.19 in.) and retained on the No. 200 sieve (0.0029 in.). The USCS groups depend on grading and fines content (ASTM D2487):

Table 2.7-2: USCS Sand Groups
GroupFines (passing No. 200)Grading or fines criteriaDescription
SW< 5%Cu ≥ 6 and 1 ≤ Cc ≤ 3Well-graded sand
SP< 5%Not meeting SWPoorly graded (uniform) sand
SW-SM, SP-SM, SW-SC, SP-SC5–12%Dual symbolsSand with silt or clay
SM> 12%Fines classify ML or MHSilty sand
SC> 12%Fines classify CL or CHClayey sand
Cu = D60D10     Cc = D302D10 D60

Eq. 2.7-1 (coefficients of uniformity and curvature)

Grain shape (angular to rounded) and mineralogy matter: angular quartz sand has a higher friction angle than rounded sand at the same density, and calcareous or micaceous sands are more compressible and crushable than quartz sand.

← Previous · 2.0 The Underworld Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.8 — Groundwater Characterization and Seepage