Rock is described by its type (origin and mineralogy), its intact strength, its weathering grade and the spacing and condition of its discontinuities. Log all four on every core run (ASTM D5878; Chapter 4.1, Section 4.1.5; Chapter 2.2, Section 2.2.6).
| Grade | Term | Description |
|---|---|---|
| I | Fresh | No visible sign of weathering; perhaps slight discoloration on discontinuities |
| II | Slightly weathered | Discoloration of rock and discontinuity surfaces |
| III | Moderately weathered | Less than half of the rock is decomposed or disintegrated to soil |
| IV | Highly weathered | More than half of the rock is decomposed or disintegrated to soil |
| V | Completely weathered | All rock is decomposed to soil; original structure largely intact |
| VI | Residual soil | All rock converted to soil; structure and fabric destroyed |
| RQD (%) | Rock quality |
|---|---|
| 0–25 | Very poor |
| 25–50 | Poor |
| 50–75 | Fair |
| 75–90 | Good |
| 90–100 | Excellent |
RQD = percent of the core run made up of intact pieces 4 in. or longer, measured on NX-size (about 2-in.) core or larger.