↑ Parent Menu⌂ Main Menu
← Chapter 2.7 Rock and Sand: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.7.6 Rock: Intact Strength and Typical Values

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls, slides on its joints, weathers, slakes and dissolves.
Author: Daniel P. Colwell
2.7.6 Rock: Intact Strength and Typical Values
Table 2.7-7: Typical Properties of Intact Rock
Rock typeUnconfined compressive strength, qu (psi)Unit weight (pcf)Young's modulus (106 psi)Hoek-Brown mi
Granite15,000–35,000160–1704–1032 ± 3
Basalt15,000–45,000170–1855–1225 ± 5
Gneiss12,000–30,000165–1754–1028 ± 5
Quartzite20,000–45,000160–1706–1220 ± 3
Limestone5,000–30,000150–1703–109 ± 2
Dolomite8,000–35,000160–1754–129 ± 3
Sandstone3,000–25,000135–1651–617 ± 4
Siltstone3,000–15,000140–1651–47 ± 2
Shale and mudstone500–12,000135–1600.2–34–6
Slate10,000–30,000165–1753–107 ± 4
Schist5,000–20,000160–1752–812 ± 3

Ranges compiled from Hoek (2007), Wyllie and Mah (2004) and Kulhawy and Mayne (1990). Strength varies with weathering, moisture and direction relative to foliation or bedding.

Table 2.7-8: Strength Classification of Intact Rock (after ISRM 1981)
GradeDescriptionqu (psi)Field identification
R0Extremely weak35–150Indented by thumbnail
R1Very weak150–725Crumbles under firm blows of a geological hammer; peeled by pocketknife
R2Weak725–3,600Peeled by pocketknife with difficulty; shallow indentation by hammer point
R3Medium strong3,600–7,250Cannot be scraped by pocketknife; fractured by a single firm hammer blow
R4Strong7,250–14,500Requires more than one hammer blow to fracture
R5Very strong14,500–36,000Requires many hammer blows to fracture
R6Extremely strong> 36,000Can only be chipped with a hammer
qu ≈ 24 Is(50)

Eq. 2.7-5 (point load index, ASTM D5731, withdrawn 2025; the factor ranges from about 15 to 25 and is lower for shales and weak rocks; calibrate with ASTM D7012 tests)

← Previous · 2.0 The Underworld Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.8 — Groundwater Characterization and Seepage