↑ Parent Menu⌂ Main Menu
← Chapter 2.7 Rock and Sand: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.7.8 Rock Slopes: Failure Modes and Stability

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls, slides on its joints, weathers, slakes and dissolves.
Author: Daniel P. Colwell
2.7.8 Rock Slopes: Failure Modes and Stability
Table 2.7-11: Rock Slope Failure Modes and Kinematic Conditions
ModeKinematic conditionTypical railroad setting
Planar slidingPlane strikes within about 20° of the face; dips less than the face (daylights) and more than its friction angleBedded sandstone and limestone cuts dipping toward the track
Wedge slidingLine of intersection of two joints plunges less than the face and more than the friction angle, toward the trackJointed igneous and metamorphic cuts
TopplingSteeply dipping joints striking within about 20° of the face, dipping into the slopeSlate, schist and columnar basalt
Rockfall and ravelingLoosening of blocks by freeze-thaw, roots and water; undercutting of hard rock over weak rockMost rock cuts; worst in spring thaw and heavy rain
Circular failure in rock massHeavily fractured or weak rock acting like soilHighly weathered rock and soft shale cuts

Planar sliding factor of safety

FS = c A + (W cosψp − U − V sinψp + T cosθ) tanφW sinψp + V cosψp − T sinθ

Eq. 2.7-8 (Hoek and Bray 1981; per foot of slope length)

Where:

  • W = block weight; A = sliding plane area; ψp = dip of the sliding plane
  • U, V = water forces on the sliding plane and in a tension crack
  • T = bolt force; θ = angle between the bolt and the normal to the sliding plane (θ = 0 for bolts installed normal to the plane)
Water pressure in a tension crack can lower the factor of safety more than any other single factor. Drain rock slopes with horizontal drains and keep surface water out of tension cracks before adding bolts.

Rockfall hazard

Railroads commonly rate rock cuts with the Rockfall Hazard Rating System (RHRS; Pierson, Davis and Van Vickle 1990; FHWA 1993), adapted for track: slope height, ditch effectiveness, exposure of trains, sight distance, geologic character, block size, climate and rockfall history. Mitigation includes scaling, rock bolts and dowels, shotcrete, draped and anchored mesh, rockfall fences and barriers, widened catchment ditches and slide-detector fences tied to signals. The rating fits the GHSR risk framework of Chapter 3.8.

← Previous · 2.0 The Underworld Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.8 — Groundwater Characterization and Seepage