| Eq. | Quantity | Expression | Use and limits |
|---|---|---|---|
| 2.7-1 | Grading coefficients | Cu = D60/D10; Cc = D302/(D10D60) | USCS SW/SP |
| 2.7-2 | Relative density | Dr = (emax − e)/(emax − emin); Dr ≈ √[(N1)60/46] | Clean sand |
| 2.7-3 | Peak friction angle | φ′ = φ′cv + 3IR | Bolton (1986), triaxial |
| 2.7-4 | Hazen permeability | k (ft/day) ≈ 1.8×106 D102 (in.) | Clean sand; order of magnitude |
| 2.7-5 | Point load correlation | qu ≈ 24 Is(50) | Calibrate; lower for shale |
| 2.7-6 | Hoek-Brown | σ1′ = σ3′ + σci(mbσ3′/σci + s)a | Rock mass |
| 2.7-7 | Barton joint strength | τ = σn tan[φr + JRC log(JCS/σn)] | Unfilled joints |
| 2.7-8 | Planar sliding FS | See Section 2.7.8 | Hoek and Bray (1981) |