2.7.12 Representative Data Table

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls, slides on its joints, weathers, slakes and dissolves.
Author: Daniel P. Colwell
2.7.12 Representative Data Table
Table 2.7-14: Representative Design Values for Sand and Rock
Materialγ (pcf)StrengthModulusk (ft/day)Notes
Loose SP sand95–110φ′ 29–31°Es 200–500 ksf3–300Settles under vibration; liquefiable when saturated
Medium dense SP/SW sand105–120φ′ 31–36°Es 500–1,000 ksf3–300Good fill and subballast source
Dense SW sand115–130φ′ 36–41°Es 1,000–1,700 ksf3–300—
Silty sand SM110–125φ′ 29–34°Es 300–800 ksf0.03–3Frost susceptible; see Chapter 2.4
Shale (weak rock)135–155qu 500–5,000 psi; joints 20–30°0.2–1×106 psi—Slakes; treat as soil when weathered
Sandstone (medium strong)140–160qu 5,000–15,000 psi1–4×106 psi—Bedding-controlled sliding
Limestone (strong)155–170qu 8,000–25,000 psi3–8×106 psi—Karst
Granite (very strong)160–170qu 15,000–35,000 psi4–10×106 psi—Joint-controlled wedges; rockfall

Starting values only; replace with test data and mapping.