2.7.14 Sand and Rock Investigation and Design Checklist

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls, slides on its joints, weathers, slakes and dissolves.
Author: Daniel P. Colwell
2.7.14 Sand and Rock Investigation and Design Checklist

Checklist · Part X · Problem Soils

Sand and Rock Investigation and Design Checklist

Investigation0 of 5
Laboratory Testing0 of 5
Analysis and Design0 of 5
Construction and Reporting0 of 4
Ticks are saved in this browser.